KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  9-2-2020
Number of Hours:  1.60
Manual Reference:  n/a
Brief Description:  more wiring

No pictures.

More studying harnesses; it thrus out my ADS=B system comes with an additional 3 serial ports. I needed one more port to feed the ELT with GPS position, so GRT walked-me through setting up a port that turns out is kinda dedicated for this purpose.

Cut some more wires, installed crimp-on DB25 socket pins for the magnetometer to fit into the EFIS harness. Used my new crimpers. Worked well!

Figured out installation spot for ADS-B system; I'll put on top of the map box; it will be accessible if I pull out the EIS.

Found out I forgot to install an extra lead in the EFIS harness for my backup battery, so I was glad I didn't button that up yet.

Getting close to the time when I'll need to install in the airframe.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.