KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  6-18-2020
Number of Hours:  0.80
Manual Reference:  C75-N-3
Brief Description:  ADSB planning / prime interior parts / install bat

I had previously installed the lower ledge L angle and the lower side anchor nut to hold the strap in place. Today I received my battery so I could now install the upper portion of the strap. Positioned the battery and drilled the upper hole. Up-drilled and riveted the upper anchor nut in place.

Spent some time measuring and planning the ADSB antenna placement.

Primed the left side wall of the console in prep for paint.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.