KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  6-13-2020
Number of Hours:  2.80
Manual Reference:  n/a
Brief Description:  Stick wiring / battery shelf

Spent quite a bit of time wiring the Ray Allen G-205 grip. This has 5 buttons. For my installation, it will be 1) PTT 2) freq select 3) memory channel selection 4) trim up 5( trim down.

This required soldering 7 long leads and 6 short (1.5-2") patch wires inside the switch housing. Tedious.

Used a multimeter to check that each is wired correctly with no cross-connects msssing things up.

After that, I worked on installing the battery shelf. I did not drill for the upper part of the strap, because depending on which battery I decide to use, there will be about a 3/4" difference in screw placement.

Center screw on the lower L angle has a nutplate to be riveted on the inner side of the firewall so that strap may be removed.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.