KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  6-11-2020
Number of Hours:  3.00
Manual Reference:  n/a
Brief Description:  Drain / windshield trim / cabin heat

The project is at the point where, aside from installing surfaces etc., it's a lot of little stuff that needs to be finalized to finish other areas.

Pilot drilled the front windshield door frame mouldings. I then clamped to the cabin frame and cleco'd. Both sides.

I fabricated small L angles to be riveted to the cabin floor to allow the fuel drains to be safety-wired to the L angle. It would be bad if one fell out during flight!

Drilled the 1.75" hole in the firewall for the cabin heat ducting, controlled by a valve. Pilot drilled holes in one of the flanges, then matched that with the valve half and match-drilled them. Then took the flange to the firewall and drilled rivet holes.

Dug out the throttle & mixture cables to obtain max diameters of them for additional holes in the firewall.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.