KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  5-1-2020
Number of Hours:  2.70
Manual Reference:  C75-NA-2
Brief Description:  Completion tasks right door; final trim & fittings

Went back and forth between doors; read carefully.

Did some more touchup paint on the right door. The on and off turing trim just tore stuff up.

Finished plexi trim on left door; took about 3-4 iterations. While the glass was still on the door frame, positioned and pilot-drilled the center door latch mount to the door frame. updrilled, deburred, and painted.

Left door, enlarged glass rivet holes to 3/16" to allow for thermal expansion. Deburred. Filed glass edges smooth.

Shot some paint on left door in just a small area; will do more later.

On right door, installed the hardware for the front door latch. Located, pilot drilled, updrilled, and riveted the door-side balljoint that connects the door to the pneumatic cylinder to hold the door open. Touched up paint on this door as well.
' style=

right door cylinder ball joint

right door cylinder ball joint

' style=

right door front latch

right door front latch

' style=

left door center latch

left door center latch

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.