KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  1-15-2019
Number of Hours:  1.10
Manual Reference:  C75-FA-6
Brief Description:  Drill cabin frame

A lot of time for little accomplishment.

Drilling steel tubing is not as easy as aluminum!

Each corner of the cabin frame comes with one hole pre-drilled by Zenith.

The builder must then drill the remaining 8 holes in each corner, then up-drill to #20 with an intermediate stop at #30. Went thru 2 drill bits so far, and still have the upper corners to drill!
' style=

first holes drilled to #40

first holes drilled to #40

' style=

final holes up to #20

final holes up to #20

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.