KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  12-13-2018
Number of Hours:  2.70
Manual Reference:  C75-FA-4
Brief Description:  More aft fuselage finish-up work

Seems like I did more but can't recall....

I was conservative in prior entries, not riveting some of the #20 holes because I wasn't sure if they'd be needed at some point in future assemblies. After review of plans and guides, I discovered I could rivet more than I had earlier. Riveted both sides for those parts that can be considered finally installed.

Deburred and de-labelled some parts.

Vacuumed-out FOD from fuselage created from hole drilling during fitment of panels. Added washers to rod-end bearings installed yesterday; saw in builder guide photos they should be there.

Drilled pilot holes for L-angle stiffeners that go on the lower baggage floor. Up-drilled to #30. Removed and deburred. Re-installed.

Installed the torque tube bearing support and control tunnel sides and top.
' style=

Drilling L-angle baggage floor stiffeners

Drilling L-angle baggage floor stiffeners

' style=

Remaining aft fuselage baggage panels trial-fit

Remaining aft fuselage baggage panels trial-fit

' style=

Riveted as much as I could before final assy

Riveted as much as I could before final assy

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.