KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  11-9-2018
Number of Hours:  1.50
Manual Reference:  C75-FA-2 & -1
Brief Description:  Finish top aft fuselage panel, prep bottom panel

Riveted all diagonal and vertical stiffeners on top skin EXCEPT the front-most angle. Plans show it backwards just like the other 3 panels, but when checking, some builders said to leave it with the vertical part of the angle facing foward - this will match nicely with the upper flaperon rod cover. Will check with Zenith Monday.

Put the top aside for now and moved the bottom panel to the bench. Riveted the flaperon drive motor bracket back in place. I previously welded it, but realized I hadn't painted it yet. This was just the correction.

Also riveted the two horizontal taill support to the bottom fuselage. These will be used to support the side panels when they are installed (the next task!).
' style=

horizontal tail brackets

horizontal tail brackets

' style=

flaperon drive motor bracket

flaperon drive motor bracket

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.