Powered By Kitlog Pro v2.0
Zenith CruZer & Sonex Logs
750 Cruzer
All
11-7-2018
< Previous Log Entry
Next Log Entry >
Date:
11-7-2018
Number of Hours:
2.70
Manual Reference:
C75-FA-2
Brief Description:
Wrapped up right side, started top panel
Deburred right wing components C75-F-3-1 and F-4-1. Cleco'd into position to provide rigidity at the front of the skin during manipulation.
Marked and drilled the front vertical post (F-4-1) for the 1/8" thick L angle doubler. Up-drilled to #20. Riveted the two parts.
Moved R wing panel to the wing cradle.
Unwrapped the top skin; deburred all edges and all holes.
Deburred the 7 vertical and diagonal L-angle stiffeners and cleco'd into position.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
750 Cruzer Home
Category
# Logs
# Hours
All
647
2335
00 - Kit Arrival
18
37
00 - Miscellaneous
13
96
01 - Empennage
32
229
02 - Wing Spars
17
74
03 - Wings
76
389
04 - Flaps & Aileron
19
82
Avionics
59
116
Controls
13
96
Empennage
32
229
Engine
41
62
Fuselage
162
278
Landing Gear
19
82
Miscellaneous
35
65
Paint
17
74
Systems
18
37
Wings
76
389
Sonex Home
Copyright © 2001-2021 Matronics. All Rights Reserved.