KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
' style=
Date:  3-28-2018
Number of Hours:  0.80
Manual Reference:  C75-WA-2
Brief Description:  More main spar drilling

No pics.

Just more drilling of the main spar - a LOT of holes.

Finished drilling the initial pass of drilling every other #40 hole. Then went back over and drilled the holes in between the clecos.

I then up-drilled those holes to #30. Cleco'd with bronze clecos, removed all #40 (silver) cleco's, and started drilling the remaining #40 holes up to #30. Battery and time ran out.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.