Brief Description: Riveted trim cable attch brackets and fab'd HS att
Kind of jumping around. In section 9, I went ahead and riveted the trim cable attachment brackets to the cover plates with blind rivets since I'm waiting for the ProSeal to cure on the elevator and trim tabs. I then moved on to Sec 10 and fabricated the HS attachment angle and began deburring the F-1010 bulkhead that it will get riveted to.
Cover plates with the 415's riveted in-place
HS attach angle match drilled and clecoed in place