KitLog pro

Powered By Kitlog Pro v2.0

MURRAY'S WEB SITE
' style=
Date:  6-10-2016
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Induction and final gear cycles

Welded extensions to transitions and throttle body and trimmed to fit.

Conducted final gear extension cycles and removed the jacks. Checked whell alignments and found atarboard side to be straight and port side minor toe-in.

Added 10 l fuel to check leak at tank. Observe no leaks after tightening fitting to drain line.

Re-installed induction components.

Add shim to tail wheel arm to make wheel vertical.

Prepare canopy lock / latch.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.