Powered By Kitlog Pro v2.0
MURRAY'S WEB SITE
Spitfire Mk 26
Fuselage
3-16-2015
< Previous Log Entry
Next Log Entry >
Date:
3-16-2015
Number of Hours:
4.00
Manual Reference:
Step 39
Brief Description:
Assemble door
Assemble door.Attache gusstes and drill outto 3/32. Drill out holes in handle to 3/16" and assemble latch onto door. Top RH gusset interferes with door handle.
Cut locking rods to 310mm and 140 mm.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Spitfire mk 26 Home
Spitfire Mk 26 Home
Category
# Logs
# Hours
All
348
1681
Avionics
10
50
Electrical
7
70
Empennage
19
152
Engine
24
110
Equipment
5
12
Fuselage
242
1008
Insurance
1
5
Miscellaneous
11
65
None
5
22
Preparations
6
28
Tools
1
1
Wings
17
158
Copyright © 2001-2024 Matronics. All Rights Reserved.