KitLog pro

Powered By Kitlog Pro v2.0

MURRAY'S WEB SITE
' style=
Date:  2-27-2015
Number of Hours:  2.50
Manual Reference:  Step 33
Brief Description:  Prepare Joystick

Diassembled joystick assembly. Removed rust with a wire wheel and buffed finished surfaces. Note - buffing the steel was not easily achieved.

Removed AN3 bolt from centre of main spar (Image 3) to allow the torque tube to be fitted parralel to belly skin. Installed bolt in the top hole of the spar.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.