Completed riveting of top skin aft of the main spar and all fairings.
On port side, there was an interference between an anchor nut on the MLG hatch and the stiffener behind. Interference was eliminated by cutting out a portion of the forward flank of the stiffener to allow the anchor nut to sit normally.