KitLog pro

Powered By Kitlog Pro v2.0

MURRAY'S WEB SITE
' style=
Date:  6-25-2014
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Prepare port side centre section forward of main s

Removed port MLG pivot bracket and applied Duralac. Re-installed and torqued all bolts to 55 inch-lb.

Removed plastic protective coating from port side components. Very slow anddifficult to remove a lot of this coating. After soaking in keroscene for 48 hours, it was still very difficult to remove.
' style=

Port MLG pivot bracket with Duralac applied

Port MLG pivot bracket with Duralac applied

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.