Powered By Kitlog Pro v2.0
MURRAY'S WEB SITE
Spitfire Mk 26
Fuselage
6-24-2014
< Previous Log Entry
Next Log Entry >
Date:
6-24-2014
Number of Hours:
2.00
Manual Reference:
Brief Description:
Assemble starboard centre section
Riveted the two ribs to the main spar, Positioned stiffeners are spacers. Applied small amount of Sikoflex to spacers,
Removed the port side MLG pivot plates from the main spar. Countersunk 1/8" holes along the top of the main spar.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Spitfire mk 26 Home
Spitfire Mk 26 Home
Category
# Logs
# Hours
All
348
1681
Avionics
10
50
Electrical
7
70
Empennage
19
152
Engine
24
110
Equipment
5
12
Fuselage
242
1008
Insurance
1
5
Miscellaneous
11
65
None
5
22
Preparations
6
28
Tools
1
1
Wings
17
158
Copyright © 2001-2024 Matronics. All Rights Reserved.