Powered By Kitlog Pro v2.0
MURRAY'S WEB SITE
Spitfire Mk 26
Fuselage
6-20-2014
< Previous Log Entry
Next Log Entry >
Date:
6-20-2014
Number of Hours:
2.50
Manual Reference:
Brief Description:
Finishpreps fpr priming; apply Duralac to MLG pivo
Finished stripping protective coating from starboard forward lower skin - this had taken several hours.
Removed MLG (starboard) plates either side of the main spar and applied Duralac to both plates. Tightened (10) bolts to 55 inch-pounds.
Drilled holes in aft spars and fuselage to 3/16".
Ready for priming
Duralac applied
Aft stay in place
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Spitfire mk 26 Home
Spitfire Mk 26 Home
Category
# Logs
# Hours
All
348
1681
Avionics
10
50
Electrical
7
70
Empennage
19
152
Engine
24
110
Equipment
5
12
Fuselage
242
1008
Insurance
1
5
Miscellaneous
11
65
None
5
22
Preparations
6
28
Tools
1
1
Wings
17
158
Copyright © 2001-2024 Matronics. All Rights Reserved.