KitLog pro

Powered By Kitlog Pro v2.0

MURRAY'S WEB SITE
' style=
Date:  5-17-2014
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Install anchor nuts in pedal hatches

Drilled out and de-burred centre holes of the pedal access hatches to 5/32". Dimpled 3/32" and 5/32" holes. Riveted anchor nuts with 3/4 countersunk rivets.

Installed aft harness anchor doublers to the fuselage. Used long rivets to fasten the abchor nuts to doublers. Riveted the doublers to the fuselage from inside the cockpit, except for the lowermost rivet which could not be accessed from beilow the seat.
' style=

Pedal access hatch with anchor nuts

Pedal access hatch with anchor nuts

' style=

Aft harness doubler in place.

Aft harness doubler in place.

' style=

Wheels mounted on landing gear

Wheels mounted on landing gear

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.