Brief Description: Install anchor nuts in pedal hatches
Drilled out and de-burred centre holes of the pedal access hatches to 5/32". Dimpled 3/32" and 5/32" holes. Riveted anchor nuts with 3/4 countersunk rivets.
Installed aft harness anchor doublers to the fuselage. Used long rivets to fasten the abchor nuts to doublers. Riveted the doublers to the fuselage from inside the cockpit, except for the lowermost rivet which could not be accessed from beilow the seat.