Powered By Kitlog Pro v2.0
MURRAY'S WEB SITE
Spitfire Mk 26
Fuselage
3-13-2014
< Previous Log Entry
Next Log Entry >
Date:
3-13-2014
Number of Hours:
3.50
Manual Reference:
Brief Description:
Paint and install outer rib port side centre secti
Finished buffing outer rib. Painted rib and riveted vertical stiffners, front doubler and flap pivot bearing. Installed on aircraft and riveted in place.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Spitfire mk 26 Home
Spitfire Mk 26 Home
Category
# Logs
# Hours
All
348
1681
Avionics
10
50
Electrical
7
70
Empennage
19
152
Engine
24
110
Equipment
5
12
Fuselage
242
1008
Insurance
1
5
Miscellaneous
11
65
None
5
22
Preparations
6
28
Tools
1
1
Wings
17
158
Copyright © 2001-2024 Matronics. All Rights Reserved.