Powered By Kitlog Pro v2.0
MURRAY'S WEB SITE
Spitfire Mk 26
Fuselage
6-22-2013
< Previous Log Entry
Next Log Entry >
Date:
6-22-2013
Number of Hours:
3.00
Manual Reference:
Step 40
Brief Description:
Install clecos
Finsihed drilling out to 1/8" and installing 1/8" clecos on port side centre section wing. Drilled out starboard center section to 3/32" and installed clecos.
Port
Starboard
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Spitfire mk 26 Home
Spitfire Mk 26 Home
Category
# Logs
# Hours
All
348
1681
Avionics
10
50
Electrical
7
70
Empennage
19
152
Engine
24
110
Equipment
5
12
Fuselage
242
1008
Insurance
1
5
Miscellaneous
11
65
None
5
22
Preparations
6
28
Tools
1
1
Wings
17
158
Copyright © 2001-2024 Matronics. All Rights Reserved.