Powered By Kitlog Pro v2.0
MURRAY'S WEB SITE
Spitfire Mk 26
Fuselage
10-2-2012
< Previous Log Entry
Next Log Entry >
Date:
10-2-2012
Number of Hours:
5.00
Manual Reference:
Task 32
Brief Description:
Installed passenger seat
Clecoed qand riveted the passemger seat into place. Riveted stiffners to passenger seat back.
Had lots of trouble with the riveter not ejecting.
Removed protective coating from some of the port inboard wing.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Spitfire mk 26 Home
Spitfire Mk 26 Home
Category
# Logs
# Hours
All
348
1681
Avionics
10
50
Electrical
7
70
Empennage
19
152
Engine
24
110
Equipment
5
12
Fuselage
242
1008
Insurance
1
5
Miscellaneous
11
65
None
5
22
Preparations
6
28
Tools
1
1
Wings
17
158
Copyright © 2001-2024 Matronics. All Rights Reserved.