Powered By Kitlog Pro v2.0
Peters Web Site
RV-9A
07 Engine/Propellor
3-26-2023
< Previous Log Entry
Next Log Entry >
Date:
3-26-2023
Number of Hours:
1.00
Manual Reference:
9225501-LOG-07.059
Brief Description:
2: Mixture Control Linkage
Time spent on the mixture control linkage, trying to work out how to configure it so it doesn't foul on the inside of the bottom cowl. I'm going to try machining the control arm down a bit.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
965
2208
01 Workshop
10
02 Tools
24
4
03 Empennage
144
322
04 Wings
84
236
05 Fuselage
138
385
06 Firewall
33
79
07 Engine/Propellor
133
356
08 Avionics
38
118
09 Lighting
29
70
10 Electrical
34
86
11 Instrument Panel
69
184
12 Fuel System
27
65
13 Canopy
75
186
14 Landing Gear
15
44
15 Cockpit Interior
20
46
17 Painting
1
3
28 CofA
3
7
29 Regulatory
2
11
49 Miscellaneous
35
6
50 YMTG Hangar
51
Copyright © 2001-2024 Matronics. All Rights Reserved.