GAM travelled to the highlands to give me a hand. We were able to achieve quite a lot. GAM manufactured a support for the landing light wiring to pass through the main spar, we riveted most of the ribs in place & did more prep work on the wiring loom incorporating an additional 3 core 24 ga. shielded cable for a video camera.