Powered By Kitlog Pro v2.0
Welcome to our RV-8 build log
RV-8
All
12-6-2009
< Previous Log Entry
Next Log Entry >
Date:
12-6-2009
Number of Hours:
5.00
Manual Reference:
8-78
Brief Description:
Primed the fairings and riveted them to fuselage
Drilled the holes for attaching the nutplates to the T-405 tank attach angles and machine countersunk for flush rivets.
Masked off and primed the fuselage in the area covered by the flap intersection fairings.
Primed the wing root fairings, flap intersection fairings and tank attach angles.
Riveted the nutplates to the tank attach angles.
Riveted the flap intersection fairings to the fuselage.
Fuselage primed for flap fairing
Flap fairing riveted on
Nutplates riveted to tank attach angles
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
305
3685
Canopy
2
288
Canopy
6
108
Electrical System
2
288
Empennage
38
217
Engine
5
396
Fibreglass
6
768
Final Assembly
6
300
Fuselage
139
693
Paint
1
48
Panel
1
12
Tools
6
24
Upholstrey
1
24
Wings
92
519
Copyright © 2001-2024 Matronics. All Rights Reserved.