KitLog pro

Powered By Kitlog Pro v2.0

Roberts Web Site
199 Logs Found 
First Photo
Date

Work Log Summary


08-29-2010
reinstall rudder pedal
let it drip after the linseed oil treatment
08-28-2010
landing gear covering
pilot side
08-21-2010
fuel line
08-18-2010
prepare cabin for interior paint
fuel selector and left fitting
08-17-2010
fuel line
I got everything I need
08-16-2010
fuel selector
strut end
08-14-2010
Remove wings
stopper made of aluminium angle
08-04-2010
wings

07-18-2010
wing to cabin gap seal
07-11-2010
wing to cabin gap seal

07-10-2010
wing to cabin gap seal
motor bracket
07-09-2010
electric flap motor
aileron pushrod connection
06-25-2010
control push rods

06-23-2010
Jury struts
Struts at cabin plate
06-22-2010
Wing to fuselage (more pics)
wings temporarely positionned
06-22-2010
Wing to fuselage
ready for the wings
06-21-2010
Wing to fuselage
spacers
06-14-2010
wing to cabin attachment
06-13-2010
left wing completed
right wing in the storage box.
06-03-2010
right wing completed
#412 rivets where the gap seal touch the flaps
05-23-2010
left & right flaps completed

05-22-2010
Aileron's final riveting
05-18-2010
Pre-cover inspection's done
Waiting for the pre-cover inspection.
05-01-2010
Pre-cover inspection
04-25-2010
left wing
fuel tank in place
04-10-2010
left wing
pitot/static tube
04-08-2010
left wing progress

03-31-2010
pitot

03-27-2010
nose skin

03-23-2010
acces plate
03-22-2010
left aileron completed
flap clamped in place
03-20-2010
left flap completed

03-16-2010
left wing aileron & flap

03-14-2010
aileron & flap frame

03-07-2010
hinge brackets

03-05-2010
K-331

02-28-2010
Fuel tank

02-27-2010
nose skin

02-25-2010
Nose skin
02-21-2010
small undertank bottom skin

02-20-2010
bottom skins

02-19-2010
left wing bottom skin

02-18-2010
wing storage
left wing top skin riveted
02-09-2010
left wing top skin
line attach between the 2 exterior skin
02-06-2010
left wing trail edge
02-05-2010
left wing top skin

02-04-2010
left wing stringers & strobe light adaptors
01-31-2010
left wing
all ribs in place
01-30-2010
Left wing ribs

01-29-2010
Begin left wing
01-24-2010
Right wing (almost) completed

01-20-2010
Complete fuel tank installation

01-17-2010
Fuel tank
new skin that extend the tank width
01-16-2010
under tank skin

01-16-2010
flap & aileron completed

01-15-2010
right aileron

01-15-2010
oilite bushing on aileron hinge

01-12-2010
right flap

01-12-2010
Fuel tank

01-02-2010
Flap skin

12-31-2009
Primer

12-28-2009
aileron & flap frame

12-27-2009
right wing nose skin
12-26-2009
Primer

12-22-2009
bottom skin access panel

12-21-2009
nose skin cutouts

12-20-2009
K-331 cutouts

12-16-2009
deburring, hinges and bellcranks

12-09-2009
nose skin & K331
nose skin bottom
12-07-2009
right wing nose skin & K331
12-05-2009
right wing bottom skin
template used to predrill the nose skin
12-04-2009
right wing leading edge
a lot of holes
12-03-2009
right wing bottom skin
12-02-2009
right wing bottom skin

11-30-2009
more pics

11-29-2009
right wing top skin & trail edge
a lot of holes
11-25-2009
right wing top skin
K-357A
11-22-2009
right wing top skin
13mm block under rear spar
11-21-2009
right wing top skin

11-17-2009
right wing stringers

11-15-2009
right wing stringers

11-14-2009
right wing ribs and stringers
stiffeners on rib 11
11-13-2009
right wing ribs & K-314

11-10-2009
Ribs 1 - 10

11-08-2009
Visit at St-Ours airstrip
10-30-2009
Back from Boston

10-22-2009
winng spars solid rivetting
10-21-2009
Priming
a little snow but no moose
10-19-2009
cleaning the parts
strut attachment and aileron hinge with bellcrank
10-06-2009
more right rear spar pictures
four spars assembly
10-06-2009
four spars assembly completed

10-03-2009
right rear spar

09-27-2009
wing construction begins

08-28-2009
winter wrap

08-18-2009
elevator bellcrank spring

08-16-2009
Fuselage completed

08-15-2009
window trim

08-15-2009
elevator tube

08-14-2009
window trim
08-12-2009
Pick-up wing kit

08-10-2009
rudder cables
refueling step
08-09-2009
Steps

08-08-2009
F-208

08-07-2009
more pics

08-07-2009
bungee

08-05-2009
landing gear

08-04-2009
rudder cables
aileron cable ends
08-04-2009
aileron cables

07-26-2009
center stick

07-25-2009
seats completed

07-20-2009
Seat rails

07-19-2009
Doors

07-10-2009
door hinges

07-09-2009
Wind sock

07-09-2009
H-234

07-08-2009
lowering aileron pylley

07-07-2009
aileron cable holes

07-06-2009
Primer & cargo door

07-01-2009
roof & cargo door
06-29-2009
G-224_left

06-28-2009
G-224...more pics

06-28-2009
G-224-right

06-27-2009
left skin & cargo door

06-24-2009
mating both parts

06-18-2009
side skin solid rivet

06-02-2009
seats

06-01-2009
seats
05-28-2009
skins

05-27-2009
roof, side skins & rudder pedal

05-26-2009
glare shield & side skin
05-22-2009
rudder pedals & cabin roof

05-21-2009
cabin bottom, gear & wheels

05-16-2009
bottom skins

05-13-2009
Landing gear

05-11-2009
Firewall
05-10-2009
PF-137
05-03-2009
final riveting
Mr Pierre Fournier
05-01-2009
Pre-cover inspection

04-25-2009
cabin roof

04-24-2009
cabin roof

04-23-2009
firewall & roof
2 holes that shouldn't be there
04-19-2009
cabin front reworked
me and my son Benoit
04-12-2009
cabin

04-10-2009
cabin front
me and Pierre bucking solid rivet
04-08-2009
cabin solid rivet

04-05-2009
Priming

04-04-2009
New primer
03-31-2009
cabin work

03-30-2009
cabin left side

03-29-2009
cabin right side

03-28-2009
Fuselage completed

03-25-2009
reinstall H-stab

03-22-2009
Tail pull handle

03-22-2009
Tail pull handle

03-21-2009
right elevator
03-15-2009
left elevator

03-10-2009
elevator skin

03-09-2009
rudder horn and left elevator

03-08-2009
rudder work

03-08-2009
PC-64

03-04-2009
finished bottom skin

03-03-2009
Rivet bottom skin
03-02-2009
lower skin
03-01-2009
Lower exterior corners

02-18-2009
bottom skin

02-17-2009
turning the fuselage upside down

02-15-2009
H-stab leading edge

02-12-2009
H-stab skins
rib preparation
02-07-2009
more pics

02-07-2009
Horizontal stab skins

02-01-2009
Horizontal stab ribs
01-28-2009
V-stab skins primed

01-25-2009
Vertical stab

01-24-2009
B-46 & B-47

01-17-2009
Vertical Stab

01-16-2009
V-stab alignement
ready for the rivet
01-15-2009
rivet skins
#412 rivet removed
01-11-2009
important note about prepunched skins
before
01-06-2009
stab tip
V-stab main spar parts
01-05-2009
vertical stab

01-04-2009
more horizontal stab
must repositioned D75 3mm backward
01-03-2009
horizontal stab
12-29-2008
rear spar

12-28-2008
H-stab

12-27-2008
Stab

12-26-2008
PA07
12-25-2008
side skin

12-20-2008
Side skin
12-15-2008
deburr

12-08-2008
outside corners

12-03-2008
inside corners

12-02-2008
inside corners
12-01-2008
inside corner
11-26-2008
stringers

11-25-2008
bulkhead
11-24-2008
First pop rivets installed

11-23-2008
More priming

11-21-2008
Priming

11-18-2008
Pick-up kit











Copyright © 2001-2010 Matronics. All Rights Reserved.