Michael's RV-10 Build Log
Work Logs Found: 485
Category Work Time: 1908 Hours
 Date
Hours
Work Log Summary

Details

 08-21-2024
80.00
Lot's of different things
Details

 07-21-2024
40.00
Fuel system, exhaust, misc
Details

 07-14-2024
45.00
More baffle related and other stuff
Details

 07-06-2024
50.00
Intake and misc items
Details

 06-24-2024
15.00
Induction work and mixture control
Details

 06-17-2024
45.00
Finished ramps, working on intake
Details

 06-03-2024
7.00
Intake Ramp work
Details

 05-27-2024
50.00
More cowl and intake work
Details

 05-06-2024
12.00
Cowl and misc
Details

 05-03-2024
4.00
Finished reconfigure.
Details

 05-02-2024
4.00
Upper cowl refit
Details

 04-30-2024
25.00
Cowl changes and misc
Details

 04-26-2024
18.00
Windscreen finished, cowl rework
Details

 04-22-2024
15.00
Windscreen
Details

 04-19-2024
6.00
Windscreen & misc
Details

 04-15-2024
5.00
Ignition wiring and misc
Details

 04-13-2024
4.00
Glare shield Cover
Details

 04-09-2024
12.00
Multiple Items
Details

 04-05-2024
5.00
Windscreen and throttle bracket
Details

 04-02-2024
2.00
Windscreen prep
Details

 03-31-2024
4.00
doors/mags/misc
Details

 03-12-2024
5.00
More door rework
Details

 03-10-2024
5.00
More Door rework
Details

 03-08-2024
3.00
Door work
Details

 03-06-2024
4.00
windshield-doors-misc
Details

 03-04-2024
4.00
Engine controls and misc
Details

 03-01-2024
3.00
Throttle body work
Details

 02-21-2024
4.00
Rear side panels and seatbelts
Details

 02-17-2024
8.00
Seat wiring and position levers
Details

 01-14-2024
3.00
Bunch of little things
Details

 01-10-2024
2.00
Stick wiring
Details

 01-04-2024
4.00
Cowl and misc
Details

 01-02-2024
4.00
Test fit prop
Details

 12-27-2023
8.00
Avionics reinstall/updates
Details

 12-21-2023
6.00
Voltage reg & misc
Details

 12-09-2023
6.00
more rear pax panel and misc
Details

 12-07-2023
5.00
various cabin items
Details

 12-02-2023
3.00
Rear pax trim panel
Details

 11-26-2023
15.00
Voltage Regulator
Details

 02-28-2021
8.00
More skybolt install
Details
       

 02-27-2021
6.00
Started Skybolt install
Details
       

 02-20-2021
8.00
Wheel fairing work
Details
       

 02-15-2021
5.00
Work on gear fairings
Details
       

 01-23-2021
4.00
Bottom cowl work
Details
       

 01-17-2021
8.00
Continued fitting cowl halves
Details
       

 01-16-2021
6.00
Top cowl trimming
Details
       

 01-10-2021
5.00
Continued trimming and fitting the cowl
Details
       

 01-02-2021
4.00
Started Cowl Fitting
Details
       

 07-02-2015
35.00
More wiring
Details
       

 09-10-2013
1.50
Oxy and vents
Details
       

 09-08-2013
25.00
Fuselage wiring
Details
       

 08-18-2013
6.00
More wiring and misc
Details
       

 08-11-2013
12.00
Wrapping up tailcone wiring
Details
       

 07-04-2013
5.00
Magnetometer mount
Details
       

 06-25-2013
12.00
Tailcone wiring
Details
       

 06-02-2013
4.00
Oxy runs & vents
Details
       

 06-01-2013
2.00
Misc work
Details
       

 05-28-2013
2.00
New brake pedals
Details
       

 06-27-2012
40.00
Much work around the panel
Details
       

 01-28-2012
25.00
Much work
Details
       

 12-13-2011
6.00
Mounted some panel components
Details
       

 11-30-2011
6.00
Began panel wiring
Details
       

 11-29-2011
13.00
Mounting of panel components
Details
       

 11-28-2011
12.00
Finalizing wirebooks and panel work
Details
       

 04-13-2011
3.00
Some misc things & cleanup
Details

 04-04-2011
1.00
Cabin top prep
Details

 12-20-2009
6.00
Exhaust headers installed
Details
       

 12-13-2009
3.00
Oil Sump heater and remote oil filter
Details
       

 11-29-2009
5.00
Ignition and panel work
Details
       

 11-16-2009
2.00
More FWF stuff
Details
       

 11-15-2009
7.00
Engine Hung!
Details
       

 11-13-2009
1.00
Installed the prop governor
Details
       

 11-12-2009
1.00
Additional engine prep
Details
       

 11-11-2009
4.00
Began process of hanging the engine
Details
       

 11-08-2009
7.00
Gear completed
Details
       

 11-04-2009
3.00
Finished nose wheel
Details
       

 11-01-2009
10.00
Began gear leg fitting and engine mount
Details
       

 10-25-2009
4.00
Cabin top finish work
Details
       

 10-23-2009
5.00
Finished up the closeouts
Details
       

 10-14-2009
3.00
Starboard side passenger closeout
Details
       

 10-13-2009
3.00
Layed-up the port side passenger closeout
Details
       

 09-24-2009
3.00
Doors DONE!
Details
       

 09-23-2009
4.00
Getting the windows in the doors
Details
       

 09-20-2009
5.00
More of the same
Details
       

 09-13-2009
5.00
Yep.. Doors
Details
     

 09-07-2009
7.00
take a guess
Details
       

 08-26-2009
6.50
Doors
Details
       

 08-24-2009
1.50
Door seal area
Details
       

 08-16-2009
5.00
Doors
Details
       

 08-09-2009
7.00
More doors
Details
       

 08-07-2009
3.50
Doors
Details
       

 08-06-2009
1.00
Pilot door
Details

 08-05-2009
4.00
More door work
Details
       

 08-03-2009
1.50
Door gap
Details
       

 08-02-2009
7.00
Doors
Details
       

 07-30-2009
6.00
Cabin top and doors
Details

 07-29-2009
5.00
Cabin top/doors
Details
       

 05-17-2009
3.00
Door work
Details
       

 05-03-2009
4.00
Started fitting my carbon fiber panel
Details
       

 04-26-2009
3.00
Painted engine mount
Details
       

 03-29-2009
7.00
Finished off cabin top, wiring, wheels
Details
       

 03-25-2009
3.00
Installed cabin top
Details
       

 03-15-2009
9.00
Painted hat shelf, reinstalled baggage floor
Details
       

 03-08-2009
7.00
Ran tailcone wiring
Details
       

 02-15-2009
35.00
General entry
Details
       

 12-23-2008
6.00
Cabin top finish work
Details
       

 12-17-2008
1.50
Some fiberglass and misc work
Details

 11-26-2008
4.00
Fitted door mechanisim and locks
Details
       

 11-25-2008
8.00
Doors fitted and closing mechanisim
Details
       

 11-23-2008
9.00
Door fitting
Details
       

 11-22-2008
3.00
Began fitting the doors
Details
       

 10-30-2008
2.00
Removed the doors and trimmed
Details
       

 10-29-2008
4.00
Glued up the doors
Details
       

 10-16-2008
1.50
Secured lift strut bracket
Details
       

 10-14-2008
1.50
Door work and lock swap
Details
       

 09-03-2008
1.50
More prep on the doors
Details
       

 08-27-2008
2.00
Trimmed door shells
Details
       

 08-12-2008
2.50
Installed the second rear window
Details
       

 08-06-2008
3.00
Rear window prep and install
Details
       

 07-15-2008
1.50
More work on seatbelt hardpoints
Details
       

 07-10-2008
2.00
Powder coated some FWF parts
Details
       

 07-09-2008
3.50
Little electrical, little fiberglass
Details
       

 07-05-2008
2.00
Seat belt and electrical
Details
       

 07-02-2008
2.00
Drilled pads and located aft hardpoints for seatbe
Details

 06-30-2008
0.50
Located main power bulkhead through fitting.
Details
 

 06-27-2008
2.50
Finished console and some firewall work.
Details
       

 06-25-2008
2.00
Console mount finishing work
Details
       

 06-24-2008
3.00
More work on console
Details
       

 06-20-2008
2.00
Misc cleanup from SB and hardpoint work
Details
       

 06-18-2008
5.50
SB and other stuff
Details
       

 06-17-2008
1.50
Couple misc items
Details
       

 06-16-2008
1.50
Finished up aft battery cables
Details
       

 06-13-2008
1.75
Made some battery cables
Details
       

 06-06-2008
3.00
Reconnected controls and adjusted bulkhead fitting
Details
       

 06-04-2008
5.00
Finished up fuel line rework
Details
       

 05-21-2008
1.00
Began rework of fuel lines.
Details
       

 05-21-2008
0.60
Added fans to dash access covers
Details
       

 05-18-2008
0.75
Completed dash access holes
Details
       

 05-14-2008
3.00
Finished most of the dash access holes.
Details
       

 05-12-2008
1.00
Started access hole modification in dash
Details
       

 05-09-2008
0.50
Installed Cabin Heat Selector Boxes
Details
       

 05-07-2008
2.50
Replaced brake lines
Details
       

 03-26-2008
2.00
More work on the cabin top
Details
       

 03-12-2008
2.00
Drilled the door frame and forward side channel ho
Details
       

 03-09-2008
3.00
Countersunk door holes, cabin support, & windscree
Details
       

 03-02-2008
1.50
Drilled aft cabin top to aft side channels
Details
     

 02-27-2008
3.00
Final fitting of the cabin top
Details
       

 02-24-2008
1.50
Complied with Van's Service Bulletin SB06-2-3
Details
       

 01-28-2008
2.00
Cleaned up the fuselage and prepared to restart co
Details
       

 12-05-2007
3.00
Finished inventory!
Details

 10-24-2007
1.50
Started inventory of Finish and FWF kits.
Details
       

 03-22-2007
1.00
test

 03-22-2007
1.00


 07-12-2006
1.25
More sanding and initial fit of console
Details
       

 07-10-2006
2.50
More trimming and fitting.
Details
       

 07-09-2006
2.00
Started trimming canopy
Details
       

 07-09-2006
3.00
More trimming and fitting
Details
       

 07-08-2006
2.00
Started rear seat backs
Details
       

 07-08-2006
2.75
Finished up rear seat back frames.
Details
       

 07-07-2006
1.00
Finished up flap system install.
Details
       

 07-07-2006
2.50
Began install of flap system
Details
       

 07-06-2006
1.75
Finished up connecting various controls.
Details
       

 07-05-2006
1.75
Installed TruTrak pitch, attached relays.
Details
       

 07-04-2006
5.50
Brake lines, control system, main battery cables.
Details
       

 07-03-2006
1.50
Ran ands secured part of the main battery runs.
Details
       

 07-02-2006
2.00
Finished up control tubes and started main power
Details
       

 07-01-2006
3.00
Began fabrication of control tubes
Details
     

 06-30-2006
2.00
Installed parking brake and remaining lines.
Details
       

 06-29-2006
2.00
Ran the rudder cables
Details
       

 06-28-2006
1.25
More brake line work.
Details
       

 06-27-2006
1.75
Installed the rudder pedals frame into the fuselag
Details
       

 06-26-2006
1.75
Installed the rudder pedals and master cylinders.
Details
       

 06-24-2006
3.00
Began work on the rudder controls
Details
       

 06-23-2006
3.00
Finished up the fuel system.
Details
       

 06-22-2006
4.00
More work on the fuel lines and some brake work.
Details
       

 06-21-2006
2.00
Located and mounted the Andair fuel valve.
Details
       

 06-21-2006
1.75
Brake lines and fuel system
Details
       

 06-20-2006
1.75
Started on brake lines
Details
       

 06-19-2006
2.00
Basically finished up the panels.
Details
       

 06-18-2006
5.00
Floor panels complete & most of side panels.
Details
       

 06-17-2006
1.25
Drilled and riveted some nutplates.
Details

 06-16-2006
3.00
Soundproofed panels & riveted left floor in.
Details
       

 06-15-2006
1.00
More closeout panel work
Details
       

 06-14-2006
2.00
Continued work on floor and access panels.
Details
       

 06-13-2006
2.25
Finshed hat shelf door and started Ch 35
Details
       

 06-11-2006
2.50
Made antenna doublers and drilled mount location.
Details
       

 06-11-2006
2.00
Finished attaching rear bulkhead covers.
Details
       

 06-11-2006
1.50
Final fit of baggage door
Details
       

 06-10-2006
1.75
More prep of bulkhead cover and panels.
Details
       

 06-09-2006
1.50
Alodine and other work on the bulkhead cover.
Details

 06-08-2006
3.00
More baggage area work.
Details
       

 06-07-2006
2.00
Finished riveting baggage area and door seals.
Details
       

 06-06-2006
1.75
Installed conduit and floors
Details
       

 06-05-2006
1.50
Misc items and baggage tie downs
Details
       

 06-03-2006
2.00
Removed tape and riveted baggage door together.
Details
       

 06-02-2006
5.00
Primed and soundproofed, misc stuff
Details
       

 06-01-2006
1.00
Taped for prime and soundproofing

 05-30-2006
1.50
Started riveting of baggage door and prep for pain
Details
       

 05-27-2006
2.50
Dimpled and alodined door parts & finished tail li
Details
       

 05-26-2006
1.00
Deburred baggage door & more tail light.
Details

 05-25-2006
2.00
Began work on baggage door.
Details
       

 05-24-2006
4.00
Cut out access doors, riveted more parts.
Details
       

 05-23-2006
1.25
More dimple and alodine.
Details
     

 05-23-2006
1.50
Fabricated some new parts.
Details
       

 05-21-2006
2.00
Finished drilling floor pans.
Details

 05-21-2006
1.50
Deburr and began dimpling floors.
Details

 05-20-2006
1.00
Continued work on baggage area.
Details
       

 05-19-2006
1.00
Started on seat pans
Details
       

 05-18-2006
1.50
Riveted right side, attached temp gear legs
Details
       

 05-18-2006
0.75
Finished up tailcone attach.
Details
       

 05-17-2006
1.50
Riveted left side and began fabricating temp gear.
Details
       

 05-16-2006
1.00
Mated the tailcone for the last time.
Details
       

 05-15-2006
1.00
Began final assembly
Details

 05-12-2006
2.00
Static port connection and hat shelf.
Details
       

 05-11-2006
1.50
Finished up deburr, dimple, and parts prep.
Details

 05-10-2006
2.00
Match/final drilled both halves for joining
Details
       

 05-09-2006
1.50
Began attach of the tailcone.
Details
       

 05-07-2006
1.50
More ski racks
Details
       

 05-06-2006
1.00
Finished fabrication of the ski racks.
Details
     

 05-05-2006
1.50
Yet more battery and ski racks
Details
       

 05-04-2006
1.50
More battery and ski rack mods
Details
       

 05-03-2006
1.50
Continued with battery tray and ski rack mods
Details
       

 05-02-2006
1.00
Tail light nuts and more ski rack.
Details
       

 05-01-2006
1.50
Mounted ELT, made gaskets for heat boxes
Details
       

 04-29-2006
1.50
Fabricate mount for external power socket
Details
       

 04-28-2006
1.50
Rivet in aft ski racks & mount ELT antenna
Details
       

 04-27-2006
0.25
Step mount
Details
       

 04-27-2006
2.00
Continued fabricating the aft ski rack mounts
Details
       

 04-26-2006
1.00
Fabrication of ski racks
Details
       

 04-10-2006
3.00
Completed panel sub assembly
Details
       

 04-09-2006
3.00
Modified ribs
Details
       

 04-08-2006
2.50
Parts breakdown and prep
Details
       

 04-07-2006
1.50
More panel sub assembly work
Details
       

 04-06-2006
2.00
Continued work on the panel assembly
Details
       

 04-05-2006
1.75
Prepared and clecoed the sub panel.
Details
       

 04-04-2006
1.00
Finished up Ch29, started on 31
Details
     

 04-03-2006
1.25
Bolted right gear mount in.
Details

 04-02-2006
2.25
Finished right floor and began bolting gear mounts
Details
       

 04-01-2006
1.50
Installed the left floor pan, started on the right
Details
       

 03-31-2006
1.50
Put down first coat of QuietCar
Details
       

 03-31-2006
1.50
Put down final two coats of QuietCar
Details
       

 03-30-2006
2.00
Primed/sealed forward fuse floor and firewall.
Details
       

 03-29-2006
1.50
Riveted the skins to the lower channel and floor
Details
       

 03-29-2006
1.25
Finished the step and restarted on Chapter 29
Details
       

 03-28-2006
1.50
Started step install
Details
       

 03-27-2006
1.00
Finished up vents
Details
       

 03-26-2006
1.00
Prepped the rear side vents
Details
       

 03-25-2006
1.50
More skin riveting.
Details

 03-23-2006
1.50
Riveted most of right, rear, fuselage skin.
Details
       

 03-22-2006
1.50
Finished most of left side started on right.
Details
       

 03-21-2006
1.75
Continued riveting the left skin.
Details
       

 03-20-2006
1.50
Began riveting skins
Details
       

 03-19-2006
1.50
Riveted on mid baggage floor angles and clecoed sk
Details
       

 03-19-2006
1.75
Continued riveting substructure
Details
       

 03-17-2006
5.00
Completed Alodine process and began riveting.
Details
       

 03-16-2006
3.75
Deburr, deburr, deburr.
Details

 03-16-2006
5.75
Completed deburr, dimple, and countersinking.
Details

 03-15-2006
1.25
Began disassembly and deburr process.
Details
     

 03-14-2006
1.50
Finished match drilling of components.
Details
       

 03-13-2006
1.50
Finished match drilling forward skins.
Details

 03-12-2006
2.00
Reattached the skins and began match drilling.
Details
       

 03-11-2006
2.50
Bent forward fuse skins and started on support str
Details
       

 03-10-2006
1.50
Final drilled the mid skins to the longerons and o
Details
       

 03-09-2006
1.50
Finished resetting of F1015-A and F1018
Details
       

 03-08-2006
0.00
Testing of ceramic paint additive - Final Part
Details

 03-08-2006
1.50
Baggage door shims, redo of Ch 26 stuff.
Details
     

 03-07-2006
0.00
Testing of ceramic paint additive - Part 3
Details
       

 03-07-2006
0.00
Testing of ceramic paint additive - Part 2
Details
       

 03-07-2006
0.00
Testing of ceramic paint additive - Part 1
Details
       

 03-07-2006
1.00
Fitted seat back, mid fuse deck, baggage seal angl
Details
       

 03-06-2006
2.00
Completed aft fuse skin bends, started seat back.
Details
       

 03-03-2006
1.50
Fabricated construction angles.
Details
       

 03-02-2006
1.25
Completed bending the longerons
Details
       

 03-01-2006
1.50
Fitted right gear mount.
Details

 02-28-2006
1.00
Fabricated a new 1013-R
Details

 02-19-2006
3.00
Continued fabrication of longerons
Details

 02-18-2006
1.50
Started fabrication of fuse longerons
Details
       

 02-13-2006
1.00
Odds and ends
Details

 02-12-2006
3.00
Rivet F-1004K, mount gear mounts
Details
       

 02-10-2006
1.50
Riveted together fuselage sections
Details
       

 01-30-2006
1.00
Cleaned up a few misc things
Details
       

 01-29-2006
1.00
Started to rivet fuselage sections together.
Details
       

 01-27-2006
1.00
Finished up mid seat rails and marked gear bracket
Details
       

 01-26-2006
1.50
Finished up seat floors and started mid seat rails
Details
       

 01-25-2006
1.00
Finished prep of seat covers
Details
       

 01-23-2006
1.50
Began prep of seat floors.
Details
       

 01-22-2006
6.00
Riveted all parts to forward section/began mating
Details
       

 01-13-2006
0.75
Continued riveting
       

 01-12-2006
1.00
Finally began riveting of parts.
Details

 01-11-2006
1.50
More deburr, dimple, and prep.

 01-10-2006
1.50
More disassemble, deburr, and dimple

 01-09-2006
1.40
Finished preassembly, began deburr & dimple.
Details

 01-06-2006
1.75
Front floor pans and mating the fwd and center fus
Details
       

 01-05-2006
1.90
Yet more prep and pre-assembly
       

 01-04-2006
1.50
Continued prep of fwd fuselage bulkhead
       

 01-03-2006
1.50
Riveted seat supports, continued other prep.
       

 01-02-2006
1.00
continued prep of bulkhead parts
     

 01-01-2006
4.00
Began prep of foward bulkheads

 12-31-2005
6.00
Completed firewall
Details
       

 12-30-2005
4.50
Riveted firewall parts and prepared the forward ri
       

 12-29-2005
3.00
Continued work on skins
Details
       

 12-29-2005
3.00
Completed mid fuse bottom and skins
     

 12-29-2005
3.50
Began prep of the firewall
Details
       

 12-26-2005
4.50
Drilled and began dimpling skins
       

 12-23-2005
5.00
More ribs
       

 12-22-2005
3.50
Started adding rear seat ribs
Details
       

 12-21-2005
4.50
Continued assembly of the mid fuselage
Details
       

 12-20-2005
2.00
Continued with mid fuse ribs
Details
     

 12-18-2005
2.00
Began mid fuselage ribs
       

 12-17-2005
4.00
Continuing with bulkheads
       

 12-16-2005
1.50
Began riveting aft bulkhead
       

 12-15-2005
1.50
Began prep of aft bulkhead
       

 12-13-2005
2.00
Finished forward bulkhead
       

 12-12-2005
2.00
Completed forward bulkhead fabrication and prep.
       

 12-11-2005
2.00
Began Mid Fuse Bulkheads
Details
     

 12-10-2005
1.00
Finished Fuselage kit inventory
Details
       

 12-10-2005
5.00
Continued inventorying fuselage kit
Details
       

 12-09-2005
1.00
Began inventory of Fuselage

 12-08-2005
1.00
Uncrated the Fuselage
       

 11-18-2005
0.25
Started on dual battery modification.
Details
       

 11-16-2005
2.00
Finished up left wing tip
Details
       

 11-15-2005
1.00
Riveted on left tip nutplates
Details
       

 11-14-2005
2.00
Drilled left tip and mounted strobe pack.
Details
       

 11-13-2005
1.50
Installed MB antenna in right tip.
Details
       

 11-12-2005
1.50
Attached right wingtip
Details
       

 11-11-2005
2.00
Cleaned up light area and positioned them.
Details
       

 11-09-2005
1.50
Riveted on nutplates for right wingtip
Details
       

 11-08-2005
2.00
Fitted right wingtip lens and nav antenna.
Details
       

 11-07-2005
1.00
Drilled right wingtip
Details
       

 11-06-2005
2.00
Riveted on rear panel and some brackets.
Details
       

 11-06-2005
2.50
Fabricated rear bulkhead cover.
Details
       

 11-05-2005
3.00
Drilled shelf to supports, deburred, alodined.
Details
       

 11-04-2005
2.00
Fabricated the shelf skin
Details
       

 11-03-2005
2.50
Finished frame for the shelf
Details
       

 11-02-2005
1.50
Continued working on support structure.
Details
       

 11-01-2005
0.60
Finished rough trim to fit of wingtips
Details
       

 11-01-2005
1.00
Began fabrication for Hat shelf
Details
       

 10-31-2005
0.75
Started some prep on the wing tips
Details
       

 10-30-2005
2.00
Finished aileron trim. *WINGS COMPLETE*
Details
       

 10-29-2005
1.50
Finished riveting most of the bottom left skin
Details
     

 10-29-2005
3.00
Finished 4 of 7 Emp fairings
Details
       

 10-29-2005
0.50
Attached the flap, push/pull tube, and pitot.
Details
       

 10-29-2005
2.50
Aileron trim and fairings
Details
       

 10-29-2005
0.25
*WING SKINS COMPLETE*
Details
     

 10-28-2005
1.50
Continued riveting bottom left skin
Details

 10-27-2005
1.75
Finished left short skin, Started long skin.
Details
       

 10-25-2005
0.75
Attached and set neutral on the left aileron.
       

 10-24-2005
2.00
Attached right flap, started left bottom skin.
Details
       

 10-23-2005
6.50
Finished riveting right skins, attached aileron.
Details
     

 10-19-2005
1.00
Made DB9 connectors for trim servos
     

 10-19-2005
1.00
Continued with riveting of bottom skins

 10-18-2005
1.50
Began riveting of bottom skins
Details
     

 10-17-2005
2.00
Alodined skins
Details

 10-16-2005
1.50
Dimpled right bottom skins
Details

 10-16-2005
2.50
*FLAPS COMPLETE*
Details

 10-15-2005
1.00
Mounted control unit for pitot
Details
       

 10-15-2005
4.00
Bunch of fiddly stuff
Details
       

 10-14-2005
2.00
Riveted gap fairings, installed right tank.
       

 10-14-2005
0.50
Ran AoA and Pitot lines
Details
       

 10-13-2005
0.50
Riveted in the replacment rib that had a crack.

 10-13-2005
2.50
Painted gap fairings and dimpled left skins.
Details
       

 10-12-2005
3.00
Finished pitot mount and drilled bottom skins
Details
       

 10-11-2005
1.50
Continued fabricating bellcrank hardware
Details
     

 10-11-2005
1.00
Began bottom skin assembly
Details

 10-10-2005
1.00
Painted close in sections white
Details
     

 10-10-2005
1.00
Fabricated push/pull and torque tubes
Details
       

 10-09-2005
1.25
Riveted trailing edge, installed hardware.
Details
       

 10-09-2005
2.00
Finished riveting skins and prosealed trailing edg
Details
       

 10-08-2005
5.50
Riveted skeleton and some of the skins
       

 10-08-2005
3.50
Primed tanks *TANKS COMPLETE*
Details
       

 10-07-2005
4.00
Alodined and began riveting
Details
       

 10-06-2005
0.40
Prosealed trailing edge
Details
     

 10-06-2005
0.75
Prosealed optical sensors and leak
Details
       

 10-06-2005
1.50
Dissasembled remaining flap and began deburr/dimpl
Details
     

 10-06-2005
2.50
Completed dimpling
Details

 10-05-2005
2.00
Finished fit assembly, began dissasembly.
       

 10-04-2005
2.00
Assembled skeleton and skins for fit
       

 10-03-2005
2.00
Fabricated, deburred flap attach brackets
     

 10-02-2005
1.00
Did some more sanding of the tanks

 09-30-2005
0.50
Started prep of flap parts
Details
     

 09-30-2005
1.25
Drilled for optical sensors
Details
       

 09-29-2005
1.25
Riveted all but trailing edge

 09-29-2005
1.00
Marked level for fuel sensor and made bracket.
Details
       

 09-28-2005
2.00
Began riveting ailerons
       

 09-27-2005
0.50
Positioned tank for Fuel Guardian install
Details
       

 09-27-2005
1.25
Finished dimpling & alodine
Details

 09-26-2005
2.00
Continued dimpling and final fitting.

 09-25-2005
6.50
Drilled, dimpled, alodined several parts
Details
       

 09-24-2005
4.50
Finished preparing most of the skeleton & stiffner
Details
       

 09-21-2005
1.50
Sanded and tested left tank
Details
       

 09-21-2005
0.50
Began prep of parts
     

 09-18-2005
3.00
Pressure testing and finish work
Details
       

 09-16-2005
2.00
Reversed brackets, filled rivet holes
Details

 09-11-2005
2.50
Started to fit some fairings
Details
       

 09-11-2005
5.00
Installed baffles and inboard bulkhead.
Details
       

 09-10-2005
9.00
Sealed the majority of the tanks
Details
       

 09-08-2005
4.00
Began assembly with sealant
Details
       

 09-07-2005
4.00
Finished match drill on right and dimpled all part
       

 09-06-2005
1.00
Continued final drilling parts in right tank.

 09-04-2005
7.00
Started pre assembly of tanks
Details
       

 09-04-2005
2.00
Riveted left leading edge to spar *LE's COMPLETE*
Details
       

 09-03-2005
5.50
Riveted right LE and attached it to wing spar
Details
       

 09-02-2005
5.50
Installed landing light and AOA ports
Details
       

 09-01-2005
3.50
Left leading edge riveted together.
Details

 08-31-2005
1.50
Dimpled right skin and ribs

 08-30-2005
2.50
Continued work on leading edges
Details
       

 08-29-2005
1.00
Match drilled left leading edge

 08-28-2005
5.50
Started wing leading edges
       

 08-28-2005
3.50
Riveted the wing top skins. *TOP COMPLETE*
Details
       

 08-27-2005
9.00
Riveted left wing skin on and started the right.
Details
       

 08-26-2005
3.50
Finished match drilling and alodined skins

 08-24-2005
3.50
Began the top wing skins
Details

 08-22-2005
7.50
*REAR SPARS COMPLETE*
Details
       

 08-20-2005
4.00
Began prep of rear spars

 08-20-2005
4.50
*WING RIBS COMPLETE*
Details
       

 08-13-2005
8.00
Prep and begin rib assembly
Details
       

 08-10-2005
5.50
Began Wing Rib Section
Details
       

 08-09-2005
1.75
Primed and completed spars
Details
       

 08-06-2005
10.00
Finished main spars
Details
       

 08-04-2005
1.50
Began left main spar
Details
       

 07-19-2005
2.50
Completed inventory of wing kit
Details
       

 07-17-2005
3.50
Started inventory of wing kit.
       

 07-16-2005
7.50
*EMPANNAGE ASSEMBLY COMPLETE*
Details
       

 07-15-2005
0.50
Drilled, painted, and primed elevator push tube.
     

 07-15-2005
0.50
*TAILCONE COMPLETE*
Details
     

 07-13-2005
0.75
Finished riveting top skins

 07-12-2005
6.50
Finished attach VS, HS, & Elevators to tailcone
       

 07-11-2005
3.00
Started elevator attachment
       

 07-09-2005
5.50
Rivet bottom, side, top skins and aft deck
Details
       

 07-08-2005
4.00
Riveted most of the bottom & side skins

 07-06-2005
2.00
Continued assembly, riveting stiffners

 07-05-2005
2.50
Began assembly, riveting bottom skin.

 07-04-2005
5.25
Alodined all parts, began assembly
Details
       

 07-03-2005
5.00
Completed dimpling

 07-01-2005
0.75
More deburring, started dimpling

 06-29-2005
0.50
Yet more deburring

 06-28-2005
0.50
Continued deburring
     

 06-27-2005
2.00
Began disassembly of tail and deburring
Details
       

 06-26-2005
5.50
Completed pre-assembly of tail
       

 06-25-2005
4.25
Continued pre-assembly of tailcone
       

 06-19-2005
4.50
Started clecoing skins to bulkheads
Details
       

 06-18-2005
5.75
Began tailcone
       

 06-15-2005
2.00
*ELEVATORS COMPLETE*
Details
       

 06-14-2005
5.50
Continued assembly of trim and elevators
       

 06-13-2005
1.00
Continued work on elevators

 06-12-2005
4.00
Finished trailing edge, began leading edges
       

 06-10-2005
5.25
Prosealed tips and foam ribs, started on trim tabs
       

 06-09-2005
3.00
Continued assembly
       

 06-08-2005
6.50
Started assembly
     

 06-07-2005
3.50
Alodined parts

 06-05-2005
7.00
Disassembled, deburred, dimpled.
       

 05-22-2005
4.50
Drilled skins and completed trim cable plates
       

 05-21-2005
6.25
Began construction of elevators
Details
       

 04-24-2005
4.50
*HORIZONTAL STABILIZER COMPLETE*
       

 04-22-2005
2.25
Riveting HS together

 04-21-2005
2.50
Began riveting nose ribs to skin

 04-03-2005
8.00
Finished preparing Skins and Skeleton
Details
       

 04-02-2005
1.50
Final drilled, deburred skins

 03-28-2005
0.50
Final drilled nose ribs to skin
       

 03-27-2005
3.25
Inspar and Nose Ribs prep
Details
     

 03-27-2005
2.50
Clecoed Skin to Skeleton
       

 03-23-2005
1.25
Riveted front and rear spars.
       

 03-23-2005
1.30
Prepped and alodined spars and associated parts
       

 03-22-2005
2.50
Drilled, deburred, prep on front spar

 03-22-2005
1.25
Drilled rear spar, doubler, and hinges.

 03-21-2005
1.50
Riveted trailing edge *RUDDER COMPLETE*
       

 03-18-2005
5.00
Riveted skeleton, skins, and counter weight.
     

 03-17-2005
0.70
Spar and rib riveting
Details
       

 03-17-2005
1.75
Sealed trailing edge and riveted lower rib
     

 03-17-2005
1.25
Deburred, countersunk, dimpled skeleton

 03-17-2005
1.80
Alodined and primed parts
       

 03-16-2005
2.00
Final drilled, deburred, and dimpled skins

 03-15-2005
1.00
Deburred and clecoed skins
Details
       

 03-13-2005
2.00
Deburred and clecoed skeleton
       

 03-10-2005
3.50
Riveted on skin. *VS COMPLETE*
       

 03-10-2005
1.00
Prepare rib and stiffner parts for rudder
Details

 03-09-2005
3.00
Primed and assembled skeleton
       

 03-08-2005
0.50
Rudder stop bracket
Details
       

 03-08-2005
1.00
Primed and riveted front spar doubler
     

 03-08-2005
0.50
Front spar doubler and dimpling

 03-06-2005
4.50
Skin and spars
Details
       

 02-27-2005
1.20
Rough rear spar assembly
Details
       

 02-27-2005
2.50
Remainder of Emp kit
       

 02-25-2005
2.50
Completed parts bags
 

 02-24-2005
1.00
Begin parts bags for Emp kit
     