Date
|
Hours
|
Work Log Summary
|
Details
|
08-21-2024
|
80.00
|
Lot's of different things
|
Details
|
|
|
07-21-2024
|
40.00
|
Fuel system, exhaust, misc
|
Details
|
|
|
07-14-2024
|
45.00
|
More baffle related and other stuff
|
Details
|
|
|
07-06-2024
|
50.00
|
Intake and misc items
|
Details
|
|
|
06-24-2024
|
15.00
|
Induction work and mixture control
|
Details
|
|
|
06-17-2024
|
45.00
|
Finished ramps, working on intake
|
Details
|
|
|
06-03-2024
|
7.00
|
Intake Ramp work
|
Details
|
|
|
05-27-2024
|
50.00
|
More cowl and intake work
|
Details
|
|
|
05-06-2024
|
12.00
|
Cowl and misc
|
Details
|
|
|
05-03-2024
|
4.00
|
Finished reconfigure.
|
Details
|
|
|
05-02-2024
|
4.00
|
Upper cowl refit
|
Details
|
|
|
04-30-2024
|
25.00
|
Cowl changes and misc
|
Details
|
|
|
04-26-2024
|
18.00
|
Windscreen finished, cowl rework
|
Details
|
|
|
04-22-2024
|
15.00
|
Windscreen
|
Details
|
|
|
04-19-2024
|
6.00
|
Windscreen & misc
|
Details
|
|
|
04-15-2024
|
5.00
|
Ignition wiring and misc
|
Details
|
|
|
04-13-2024
|
4.00
|
Glare shield Cover
|
Details
|
|
|
04-09-2024
|
12.00
|
Multiple Items
|
Details
|
|
|
04-05-2024
|
5.00
|
Windscreen and throttle bracket
|
Details
|
|
|
04-02-2024
|
2.00
|
Windscreen prep
|
Details
|
|
|
03-31-2024
|
4.00
|
doors/mags/misc
|
Details
|
|
|
03-12-2024
|
5.00
|
More door rework
|
Details
|
|
|
03-10-2024
|
5.00
|
More Door rework
|
Details
|
|
|
03-08-2024
|
3.00
|
Door work
|
Details
|
|
|
03-06-2024
|
4.00
|
windshield-doors-misc
|
Details
|
|
|
03-04-2024
|
4.00
|
Engine controls and misc
|
Details
|
|
|
03-01-2024
|
3.00
|
Throttle body work
|
Details
|
|
|
02-21-2024
|
4.00
|
Rear side panels and seatbelts
|
Details
|
|
|
02-17-2024
|
8.00
|
Seat wiring and position levers
|
Details
|
|
|
01-14-2024
|
3.00
|
Bunch of little things
|
Details
|
|
|
01-10-2024
|
2.00
|
Stick wiring
|
Details
|
|
|
01-04-2024
|
4.00
|
Cowl and misc
|
Details
|
|
|
01-02-2024
|
4.00
|
Test fit prop
|
Details
|
|
|
12-27-2023
|
8.00
|
Avionics reinstall/updates
|
Details
|
|
|
12-21-2023
|
6.00
|
Voltage reg & misc
|
Details
|
|
|
12-09-2023
|
6.00
|
more rear pax panel and misc
|
Details
|
|
|
12-07-2023
|
5.00
|
various cabin items
|
Details
|
|
|
12-02-2023
|
3.00
|
Rear pax trim panel
|
Details
|
|
|
11-26-2023
|
15.00
|
Voltage Regulator
|
Details
|
|
|
02-28-2021
|
8.00
|
More skybolt install
|
Details
|
|
|
02-27-2021
|
6.00
|
Started Skybolt install
|
Details
|
|
|
02-20-2021
|
8.00
|
Wheel fairing work
|
Details
|
|
|
02-15-2021
|
5.00
|
Work on gear fairings
|
Details
|
|
|
01-23-2021
|
4.00
|
Bottom cowl work
|
Details
|
|
|
01-17-2021
|
8.00
|
Continued fitting cowl halves
|
Details
|
|
|
01-16-2021
|
6.00
|
Top cowl trimming
|
Details
|
|
|
01-10-2021
|
5.00
|
Continued trimming and fitting the cowl
|
Details
|
|
|
01-02-2021
|
4.00
|
Started Cowl Fitting
|
Details
|
|
|
07-02-2015
|
35.00
|
More wiring
|
Details
|
|
|
09-10-2013
|
1.50
|
Oxy and vents
|
Details
|
|
|
09-08-2013
|
25.00
|
Fuselage wiring
|
Details
|
|
|
08-18-2013
|
6.00
|
More wiring and misc
|
Details
|
|
|
08-11-2013
|
12.00
|
Wrapping up tailcone wiring
|
Details
|
|
|
07-04-2013
|
5.00
|
Magnetometer mount
|
Details
|
|
|
06-25-2013
|
12.00
|
Tailcone wiring
|
Details
|
|
|
06-02-2013
|
4.00
|
Oxy runs & vents
|
Details
|
|
|
06-01-2013
|
2.00
|
Misc work
|
Details
|
|
|
05-28-2013
|
2.00
|
New brake pedals
|
Details
|
|
|
06-27-2012
|
40.00
|
Much work around the panel
|
Details
|
|
|
01-28-2012
|
25.00
|
Much work
|
Details
|
|
|
12-13-2011
|
6.00
|
Mounted some panel components
|
Details
|
|
|
11-30-2011
|
6.00
|
Began panel wiring
|
Details
|
|
|
11-29-2011
|
13.00
|
Mounting of panel components
|
Details
|
|
|
11-28-2011
|
12.00
|
Finalizing wirebooks and panel work
|
Details
|
|
|
04-13-2011
|
3.00
|
Some misc things & cleanup
|
Details
|
|
|
04-04-2011
|
1.00
|
Cabin top prep
|
Details
|
|
|
12-20-2009
|
6.00
|
Exhaust headers installed
|
Details
|
|
|
12-13-2009
|
3.00
|
Oil Sump heater and remote oil filter
|
Details
|
|
|
11-29-2009
|
5.00
|
Ignition and panel work
|
Details
|
|
|
11-16-2009
|
2.00
|
More FWF stuff
|
Details
|
|
|
11-15-2009
|
7.00
|
Engine Hung!
|
Details
|
|
|
11-13-2009
|
1.00
|
Installed the prop governor
|
Details
|
|
|
11-12-2009
|
1.00
|
Additional engine prep
|
Details
|
|
|
11-11-2009
|
4.00
|
Began process of hanging the engine
|
Details
|
|
|
11-08-2009
|
7.00
|
Gear completed
|
Details
|
|
|
11-04-2009
|
3.00
|
Finished nose wheel
|
Details
|
|
|
11-01-2009
|
10.00
|
Began gear leg fitting and engine mount
|
Details
|
|
|
10-25-2009
|
4.00
|
Cabin top finish work
|
Details
|
|
|
10-23-2009
|
5.00
|
Finished up the closeouts
|
Details
|
|
|
10-14-2009
|
3.00
|
Starboard side passenger closeout
|
Details
|
|
|
10-13-2009
|
3.00
|
Layed-up the port side passenger closeout
|
Details
|
|
|
09-24-2009
|
3.00
|
Doors DONE!
|
Details
|
|
|
09-23-2009
|
4.00
|
Getting the windows in the doors
|
Details
|
|
|
09-20-2009
|
5.00
|
More of the same
|
Details
|
|
|
09-13-2009
|
5.00
|
Yep.. Doors
|
Details
|
|
|
09-07-2009
|
7.00
|
take a guess
|
Details
|
|
|
08-26-2009
|
6.50
|
Doors
|
Details
|
|
|
08-24-2009
|
1.50
|
Door seal area
|
Details
|
|
|
08-16-2009
|
5.00
|
Doors
|
Details
|
|
|
08-09-2009
|
7.00
|
More doors
|
Details
|
|
|
08-07-2009
|
3.50
|
Doors
|
Details
|
|
|
08-06-2009
|
1.00
|
Pilot door
|
Details
|
|
|
08-05-2009
|
4.00
|
More door work
|
Details
|
|
|
08-03-2009
|
1.50
|
Door gap
|
Details
|
|
|
08-02-2009
|
7.00
|
Doors
|
Details
|
|
|
07-30-2009
|
6.00
|
Cabin top and doors
|
Details
|
|
|
07-29-2009
|
5.00
|
Cabin top/doors
|
Details
|
|
|
05-17-2009
|
3.00
|
Door work
|
Details
|
|
|
05-03-2009
|
4.00
|
Started fitting my carbon fiber panel
|
Details
|
|
|
04-26-2009
|
3.00
|
Painted engine mount
|
Details
|
|
|
03-29-2009
|
7.00
|
Finished off cabin top, wiring, wheels
|
Details
|
|
|
03-25-2009
|
3.00
|
Installed cabin top
|
Details
|
|
|
03-15-2009
|
9.00
|
Painted hat shelf, reinstalled baggage floor
|
Details
|
|
|
03-08-2009
|
7.00
|
Ran tailcone wiring
|
Details
|
|
|
02-15-2009
|
35.00
|
General entry
|
Details
|
|
|
12-23-2008
|
6.00
|
Cabin top finish work
|
Details
|
|
|
12-17-2008
|
1.50
|
Some fiberglass and misc work
|
Details
|
|
|
11-26-2008
|
4.00
|
Fitted door mechanisim and locks
|
Details
|
|
|
11-25-2008
|
8.00
|
Doors fitted and closing mechanisim
|
Details
|
|
|
11-23-2008
|
9.00
|
Door fitting
|
Details
|
|
|
11-22-2008
|
3.00
|
Began fitting the doors
|
Details
|
|
|
10-30-2008
|
2.00
|
Removed the doors and trimmed
|
Details
|
|
|
10-29-2008
|
4.00
|
Glued up the doors
|
Details
|
|
|
10-16-2008
|
1.50
|
Secured lift strut bracket
|
Details
|
|
|
10-14-2008
|
1.50
|
Door work and lock swap
|
Details
|
|
|
09-03-2008
|
1.50
|
More prep on the doors
|
Details
|
|
|
08-27-2008
|
2.00
|
Trimmed door shells
|
Details
|
|
|
08-12-2008
|
2.50
|
Installed the second rear window
|
Details
|
|
|
08-06-2008
|
3.00
|
Rear window prep and install
|
Details
|
|
|
07-15-2008
|
1.50
|
More work on seatbelt hardpoints
|
Details
|
|
|
07-10-2008
|
2.00
|
Powder coated some FWF parts
|
Details
|
|
|
07-09-2008
|
3.50
|
Little electrical, little fiberglass
|
Details
|
|
|
07-05-2008
|
2.00
|
Seat belt and electrical
|
Details
|
|
|
07-02-2008
|
2.00
|
Drilled pads and located aft hardpoints for seatbe
|
Details
|
|
|
06-30-2008
|
0.50
|
Located main power bulkhead through fitting.
|
Details
|
|
|
06-27-2008
|
2.50
|
Finished console and some firewall work.
|
Details
|
|
|
06-25-2008
|
2.00
|
Console mount finishing work
|
Details
|
|
|
06-24-2008
|
3.00
|
More work on console
|
Details
|
|
|
06-20-2008
|
2.00
|
Misc cleanup from SB and hardpoint work
|
Details
|
|
|
06-18-2008
|
5.50
|
SB and other stuff
|
Details
|
|
|
06-17-2008
|
1.50
|
Couple misc items
|
Details
|
|
|
06-16-2008
|
1.50
|
Finished up aft battery cables
|
Details
|
|
|
06-13-2008
|
1.75
|
Made some battery cables
|
Details
|
|
|
06-06-2008
|
3.00
|
Reconnected controls and adjusted bulkhead fitting
|
Details
|
|
|
06-04-2008
|
5.00
|
Finished up fuel line rework
|
Details
|
|
|
05-21-2008
|
1.00
|
Began rework of fuel lines.
|
Details
|
|
|
05-21-2008
|
0.60
|
Added fans to dash access covers
|
Details
|
|
|
05-18-2008
|
0.75
|
Completed dash access holes
|
Details
|
|
|
05-14-2008
|
3.00
|
Finished most of the dash access holes.
|
Details
|
|
|
05-12-2008
|
1.00
|
Started access hole modification in dash
|
Details
|
|
|
05-09-2008
|
0.50
|
Installed Cabin Heat Selector Boxes
|
Details
|
|
|
05-07-2008
|
2.50
|
Replaced brake lines
|
Details
|
|
|
03-26-2008
|
2.00
|
More work on the cabin top
|
Details
|
|
|
03-12-2008
|
2.00
|
Drilled the door frame and forward side channel ho
|
Details
|
|
|
03-09-2008
|
3.00
|
Countersunk door holes, cabin support, & windscree
|
Details
|
|
|
03-02-2008
|
1.50
|
Drilled aft cabin top to aft side channels
|
Details
|
|
|
02-27-2008
|
3.00
|
Final fitting of the cabin top
|
Details
|
|
|
02-24-2008
|
1.50
|
Complied with Van's Service Bulletin SB06-2-3
|
Details
|
|
|
01-28-2008
|
2.00
|
Cleaned up the fuselage and prepared to restart co
|
Details
|
|
|
12-05-2007
|
3.00
|
Finished inventory!
|
Details
|
|
|
10-24-2007
|
1.50
|
Started inventory of Finish and FWF kits.
|
Details
|
|
|
03-22-2007
|
1.00
|
test
|
|
|
|
03-22-2007
|
1.00
|
|
|
|
|
07-12-2006
|
1.25
|
More sanding and initial fit of console
|
Details
|
|
|
07-10-2006
|
2.50
|
More trimming and fitting.
|
Details
|
|
|
07-09-2006
|
2.00
|
Started trimming canopy
|
Details
|
|
|
07-09-2006
|
3.00
|
More trimming and fitting
|
Details
|
|
|
07-08-2006
|
2.00
|
Started rear seat backs
|
Details
|
|
|
07-08-2006
|
2.75
|
Finished up rear seat back frames.
|
Details
|
|
|
07-07-2006
|
1.00
|
Finished up flap system install.
|
Details
|
|
|
07-07-2006
|
2.50
|
Began install of flap system
|
Details
|
|
|
07-06-2006
|
1.75
|
Finished up connecting various controls.
|
Details
|
|
|
07-05-2006
|
1.75
|
Installed TruTrak pitch, attached relays.
|
Details
|
|
|
07-04-2006
|
5.50
|
Brake lines, control system, main battery cables.
|
Details
|
|
|
07-03-2006
|
1.50
|
Ran ands secured part of the main battery runs.
|
Details
|
|
|
07-02-2006
|
2.00
|
Finished up control tubes and started main power
|
Details
|
|
|
07-01-2006
|
3.00
|
Began fabrication of control tubes
|
Details
|
|
|
06-30-2006
|
2.00
|
Installed parking brake and remaining lines.
|
Details
|
|
|
06-29-2006
|
2.00
|
Ran the rudder cables
|
Details
|
|
|
06-28-2006
|
1.25
|
More brake line work.
|
Details
|
|
|
06-27-2006
|
1.75
|
Installed the rudder pedals frame into the fuselag
|
Details
|
|
|
06-26-2006
|
1.75
|
Installed the rudder pedals and master cylinders.
|
Details
|
|
|
06-24-2006
|
3.00
|
Began work on the rudder controls
|
Details
|
|
|
06-23-2006
|
3.00
|
Finished up the fuel system.
|
Details
|
|
|
06-22-2006
|
4.00
|
More work on the fuel lines and some brake work.
|
Details
|
|
|
06-21-2006
|
2.00
|
Located and mounted the Andair fuel valve.
|
Details
|
|
|
06-21-2006
|
1.75
|
Brake lines and fuel system
|
Details
|
|
|
06-20-2006
|
1.75
|
Started on brake lines
|
Details
|
|
|
06-19-2006
|
2.00
|
Basically finished up the panels.
|
Details
|
|
|
06-18-2006
|
5.00
|
Floor panels complete & most of side panels.
|
Details
|
|
|
06-17-2006
|
1.25
|
Drilled and riveted some nutplates.
|
Details
|
|
|
06-16-2006
|
3.00
|
Soundproofed panels & riveted left floor in.
|
Details
|
|
|
06-15-2006
|
1.00
|
More closeout panel work
|
Details
|
|
|
06-14-2006
|
2.00
|
Continued work on floor and access panels.
|
Details
|
|
|
06-13-2006
|
2.25
|
Finshed hat shelf door and started Ch 35
|
Details
|
|
|
06-11-2006
|
2.50
|
Made antenna doublers and drilled mount location.
|
Details
|
|
|
06-11-2006
|
2.00
|
Finished attaching rear bulkhead covers.
|
Details
|
|
|
06-11-2006
|
1.50
|
Final fit of baggage door
|
Details
|
|
|
06-10-2006
|
1.75
|
More prep of bulkhead cover and panels.
|
Details
|
|
|
06-09-2006
|
1.50
|
Alodine and other work on the bulkhead cover.
|
Details
|
|
|
06-08-2006
|
3.00
|
More baggage area work.
|
Details
|
|
|
06-07-2006
|
2.00
|
Finished riveting baggage area and door seals.
|
Details
|
|
|
06-06-2006
|
1.75
|
Installed conduit and floors
|
Details
|
|
|
06-05-2006
|
1.50
|
Misc items and baggage tie downs
|
Details
|
|
|
06-03-2006
|
2.00
|
Removed tape and riveted baggage door together.
|
Details
|
|
|
06-02-2006
|
5.00
|
Primed and soundproofed, misc stuff
|
Details
|
|
|
06-01-2006
|
1.00
|
Taped for prime and soundproofing
|
|
|
|
05-30-2006
|
1.50
|
Started riveting of baggage door and prep for pain
|
Details
|
|
|
05-27-2006
|
2.50
|
Dimpled and alodined door parts & finished tail li
|
Details
|
|
|
05-26-2006
|
1.00
|
Deburred baggage door & more tail light.
|
Details
|
|
|
05-25-2006
|
2.00
|
Began work on baggage door.
|
Details
|
|
|
05-24-2006
|
4.00
|
Cut out access doors, riveted more parts.
|
Details
|
|
|
05-23-2006
|
1.25
|
More dimple and alodine.
|
Details
|
|
|
05-23-2006
|
1.50
|
Fabricated some new parts.
|
Details
|
|
|
05-21-2006
|
2.00
|
Finished drilling floor pans.
|
Details
|
|
|
05-21-2006
|
1.50
|
Deburr and began dimpling floors.
|
Details
|
|
|
05-20-2006
|
1.00
|
Continued work on baggage area.
|
Details
|
|
|
05-19-2006
|
1.00
|
Started on seat pans
|
Details
|
|
|
05-18-2006
|
1.50
|
Riveted right side, attached temp gear legs
|
Details
|
|
|
05-18-2006
|
0.75
|
Finished up tailcone attach.
|
Details
|
|
|
05-17-2006
|
1.50
|
Riveted left side and began fabricating temp gear.
|
Details
|
|
|
05-16-2006
|
1.00
|
Mated the tailcone for the last time.
|
Details
|
|
|
05-15-2006
|
1.00
|
Began final assembly
|
Details
|
|
|
05-12-2006
|
2.00
|
Static port connection and hat shelf.
|
Details
|
|
|
05-11-2006
|
1.50
|
Finished up deburr, dimple, and parts prep.
|
Details
|
|
|
05-10-2006
|
2.00
|
Match/final drilled both halves for joining
|
Details
|
|
|
05-09-2006
|
1.50
|
Began attach of the tailcone.
|
Details
|
|
|
05-07-2006
|
1.50
|
More ski racks
|
Details
|
|
|
05-06-2006
|
1.00
|
Finished fabrication of the ski racks.
|
Details
|
|
|
05-05-2006
|
1.50
|
Yet more battery and ski racks
|
Details
|
|
|
05-04-2006
|
1.50
|
More battery and ski rack mods
|
Details
|
|
|
05-03-2006
|
1.50
|
Continued with battery tray and ski rack mods
|
Details
|
|
|
05-02-2006
|
1.00
|
Tail light nuts and more ski rack.
|
Details
|
|
|
05-01-2006
|
1.50
|
Mounted ELT, made gaskets for heat boxes
|
Details
|
|
|
04-29-2006
|
1.50
|
Fabricate mount for external power socket
|
Details
|
|
|
04-28-2006
|
1.50
|
Rivet in aft ski racks & mount ELT antenna
|
Details
|
|
|
04-27-2006
|
0.25
|
Step mount
|
Details
|
|
|
04-27-2006
|
2.00
|
Continued fabricating the aft ski rack mounts
|
Details
|
|
|
04-26-2006
|
1.00
|
Fabrication of ski racks
|
Details
|
|
|
04-10-2006
|
3.00
|
Completed panel sub assembly
|
Details
|
|
|
04-09-2006
|
3.00
|
Modified ribs
|
Details
|
|
|
04-08-2006
|
2.50
|
Parts breakdown and prep
|
Details
|
|
|
04-07-2006
|
1.50
|
More panel sub assembly work
|
Details
|
|
|
04-06-2006
|
2.00
|
Continued work on the panel assembly
|
Details
|
|
|
04-05-2006
|
1.75
|
Prepared and clecoed the sub panel.
|
Details
|
|
|
04-04-2006
|
1.00
|
Finished up Ch29, started on 31
|
Details
|
|
|
04-03-2006
|
1.25
|
Bolted right gear mount in.
|
Details
|
|
|
04-02-2006
|
2.25
|
Finished right floor and began bolting gear mounts
|
Details
|
|
|
04-01-2006
|
1.50
|
Installed the left floor pan, started on the right
|
Details
|
|
|
03-31-2006
|
1.50
|
Put down first coat of QuietCar
|
Details
|
|
|
03-31-2006
|
1.50
|
Put down final two coats of QuietCar
|
Details
|
|
|
03-30-2006
|
2.00
|
Primed/sealed forward fuse floor and firewall.
|
Details
|
|
|
03-29-2006
|
1.50
|
Riveted the skins to the lower channel and floor
|
Details
|
|
|
03-29-2006
|
1.25
|
Finished the step and restarted on Chapter 29
|
Details
|
|
|
03-28-2006
|
1.50
|
Started step install
|
Details
|
|
|
03-27-2006
|
1.00
|
Finished up vents
|
Details
|
|
|
03-26-2006
|
1.00
|
Prepped the rear side vents
|
Details
|
|
|
03-25-2006
|
1.50
|
More skin riveting.
|
Details
|
|
|
03-23-2006
|
1.50
|
Riveted most of right, rear, fuselage skin.
|
Details
|
|
|
03-22-2006
|
1.50
|
Finished most of left side started on right.
|
Details
|
|
|
03-21-2006
|
1.75
|
Continued riveting the left skin.
|
Details
|
|
|
03-20-2006
|
1.50
|
Began riveting skins
|
Details
|
|
|
03-19-2006
|
1.50
|
Riveted on mid baggage floor angles and clecoed sk
|
Details
|
|
|
03-19-2006
|
1.75
|
Continued riveting substructure
|
Details
|
|
|
03-17-2006
|
5.00
|
Completed Alodine process and began riveting.
|
Details
|
|
|
03-16-2006
|
3.75
|
Deburr, deburr, deburr.
|
Details
|
|
|
03-16-2006
|
5.75
|
Completed deburr, dimple, and countersinking.
|
Details
|
|
|
03-15-2006
|
1.25
|
Began disassembly and deburr process.
|
Details
|
|
|
03-14-2006
|
1.50
|
Finished match drilling of components.
|
Details
|
|
|
03-13-2006
|
1.50
|
Finished match drilling forward skins.
|
Details
|
|
|
03-12-2006
|
2.00
|
Reattached the skins and began match drilling.
|
Details
|
|
|
03-11-2006
|
2.50
|
Bent forward fuse skins and started on support str
|
Details
|
|
|
03-10-2006
|
1.50
|
Final drilled the mid skins to the longerons and o
|
Details
|
|
|
03-09-2006
|
1.50
|
Finished resetting of F1015-A and F1018
|
Details
|
|
|
03-08-2006
|
0.00
|
Testing of ceramic paint additive - Final Part
|
Details
|
|
|
03-08-2006
|
1.50
|
Baggage door shims, redo of Ch 26 stuff.
|
Details
|
|
|
03-07-2006
|
0.00
|
Testing of ceramic paint additive - Part 3
|
Details
|
|
|
03-07-2006
|
0.00
|
Testing of ceramic paint additive - Part 2
|
Details
|
|
|
03-07-2006
|
0.00
|
Testing of ceramic paint additive - Part 1
|
Details
|
|
|
03-07-2006
|
1.00
|
Fitted seat back, mid fuse deck, baggage seal angl
|
Details
|
|
|
03-06-2006
|
2.00
|
Completed aft fuse skin bends, started seat back.
|
Details
|
|
|
03-03-2006
|
1.50
|
Fabricated construction angles.
|
Details
|
|
|
03-02-2006
|
1.25
|
Completed bending the longerons
|
Details
|
|
|
03-01-2006
|
1.50
|
Fitted right gear mount.
|
Details
|
|
|
02-28-2006
|
1.00
|
Fabricated a new 1013-R
|
Details
|
|
|
02-19-2006
|
3.00
|
Continued fabrication of longerons
|
Details
|
|
|
02-18-2006
|
1.50
|
Started fabrication of fuse longerons
|
Details
|
|
|
02-13-2006
|
1.00
|
Odds and ends
|
Details
|
|
|
02-12-2006
|
3.00
|
Rivet F-1004K, mount gear mounts
|
Details
|
|
|
02-10-2006
|
1.50
|
Riveted together fuselage sections
|
Details
|
|
|
01-30-2006
|
1.00
|
Cleaned up a few misc things
|
Details
|
|
|
01-29-2006
|
1.00
|
Started to rivet fuselage sections together.
|
Details
|
|
|
01-27-2006
|
1.00
|
Finished up mid seat rails and marked gear bracket
|
Details
|
|
|
01-26-2006
|
1.50
|
Finished up seat floors and started mid seat rails
|
Details
|
|
|
01-25-2006
|
1.00
|
Finished prep of seat covers
|
Details
|
|
|
01-23-2006
|
1.50
|
Began prep of seat floors.
|
Details
|
|
|
01-22-2006
|
6.00
|
Riveted all parts to forward section/began mating
|
Details
|
|
|
01-13-2006
|
0.75
|
Continued riveting
|
|
|
|
01-12-2006
|
1.00
|
Finally began riveting of parts.
|
Details
|
|
|
01-11-2006
|
1.50
|
More deburr, dimple, and prep.
|
|
|
|
01-10-2006
|
1.50
|
More disassemble, deburr, and dimple
|
|
|
|
01-09-2006
|
1.40
|
Finished preassembly, began deburr & dimple.
|
Details
|
|
|
01-06-2006
|
1.75
|
Front floor pans and mating the fwd and center fus
|
Details
|
|
|
01-05-2006
|
1.90
|
Yet more prep and pre-assembly
|
|
|
|
01-04-2006
|
1.50
|
Continued prep of fwd fuselage bulkhead
|
|
|
|
01-03-2006
|
1.50
|
Riveted seat supports, continued other prep.
|
|
|
|
01-02-2006
|
1.00
|
continued prep of bulkhead parts
|
|
|
|
01-01-2006
|
4.00
|
Began prep of foward bulkheads
|
|
|
|
12-31-2005
|
6.00
|
Completed firewall
|
Details
|
|
|
12-30-2005
|
4.50
|
Riveted firewall parts and prepared the forward ri
|
|
|
|
12-29-2005
|
3.00
|
Continued work on skins
|
Details
|
|
|
12-29-2005
|
3.00
|
Completed mid fuse bottom and skins
|
|
|
|
12-29-2005
|
3.50
|
Began prep of the firewall
|
Details
|
|
|
12-26-2005
|
4.50
|
Drilled and began dimpling skins
|
|
|
|
12-23-2005
|
5.00
|
More ribs
|
|
|
|
12-22-2005
|
3.50
|
Started adding rear seat ribs
|
Details
|
|
|
12-21-2005
|
4.50
|
Continued assembly of the mid fuselage
|
Details
|
|
|
12-20-2005
|
2.00
|
Continued with mid fuse ribs
|
Details
|
|
|
12-18-2005
|
2.00
|
Began mid fuselage ribs
|
|
|
|
12-17-2005
|
4.00
|
Continuing with bulkheads
|
|
|
|
12-16-2005
|
1.50
|
Began riveting aft bulkhead
|
|
|
|
12-15-2005
|
1.50
|
Began prep of aft bulkhead
|
|
|
|
12-13-2005
|
2.00
|
Finished forward bulkhead
|
|
|
|
12-12-2005
|
2.00
|
Completed forward bulkhead fabrication and prep.
|
|
|
|
12-11-2005
|
2.00
|
Began Mid Fuse Bulkheads
|
Details
|
|
|
12-10-2005
|
1.00
|
Finished Fuselage kit inventory
|
Details
|
|
|
12-10-2005
|
5.00
|
Continued inventorying fuselage kit
|
Details
|
|
|
12-09-2005
|
1.00
|
Began inventory of Fuselage
|
|
|
|
12-08-2005
|
1.00
|
Uncrated the Fuselage
|
|
|
|
11-18-2005
|
0.25
|
Started on dual battery modification.
|
Details
|
|
|
11-16-2005
|
2.00
|
Finished up left wing tip
|
Details
|
|
|
11-15-2005
|
1.00
|
Riveted on left tip nutplates
|
Details
|
|
|
11-14-2005
|
2.00
|
Drilled left tip and mounted strobe pack.
|
Details
|
|
|
11-13-2005
|
1.50
|
Installed MB antenna in right tip.
|
Details
|
|
|
11-12-2005
|
1.50
|
Attached right wingtip
|
Details
|
|
|
11-11-2005
|
2.00
|
Cleaned up light area and positioned them.
|
Details
|
|
|
11-09-2005
|
1.50
|
Riveted on nutplates for right wingtip
|
Details
|
|
|
11-08-2005
|
2.00
|
Fitted right wingtip lens and nav antenna.
|
Details
|
|
|
11-07-2005
|
1.00
|
Drilled right wingtip
|
Details
|
|
|
11-06-2005
|
2.00
|
Riveted on rear panel and some brackets.
|
Details
|
|
|
11-06-2005
|
2.50
|
Fabricated rear bulkhead cover.
|
Details
|
|
|
11-05-2005
|
3.00
|
Drilled shelf to supports, deburred, alodined.
|
Details
|
|
|
11-04-2005
|
2.00
|
Fabricated the shelf skin
|
Details
|
|
|
11-03-2005
|
2.50
|
Finished frame for the shelf
|
Details
|
|
|
11-02-2005
|
1.50
|
Continued working on support structure.
|
Details
|
|
|
11-01-2005
|
0.60
|
Finished rough trim to fit of wingtips
|
Details
|
|
|
11-01-2005
|
1.00
|
Began fabrication for Hat shelf
|
Details
|
|
|
10-31-2005
|
0.75
|
Started some prep on the wing tips
|
Details
|
|
|
10-30-2005
|
2.00
|
Finished aileron trim. *WINGS COMPLETE*
|
Details
|
|
|
10-29-2005
|
1.50
|
Finished riveting most of the bottom left skin
|
Details
|
|
|
10-29-2005
|
3.00
|
Finished 4 of 7 Emp fairings
|
Details
|
|
|
10-29-2005
|
0.50
|
Attached the flap, push/pull tube, and pitot.
|
Details
|
|
|
10-29-2005
|
2.50
|
Aileron trim and fairings
|
Details
|
|
|
10-29-2005
|
0.25
|
*WING SKINS COMPLETE*
|
Details
|
|
|
10-28-2005
|
1.50
|
Continued riveting bottom left skin
|
Details
|
|
|
10-27-2005
|
1.75
|
Finished left short skin, Started long skin.
|
Details
|
|
|
10-25-2005
|
0.75
|
Attached and set neutral on the left aileron.
|
|
|
|
10-24-2005
|
2.00
|
Attached right flap, started left bottom skin.
|
Details
|
|
|
10-23-2005
|
6.50
|
Finished riveting right skins, attached aileron.
|
Details
|
|
|
10-19-2005
|
1.00
|
Made DB9 connectors for trim servos
|
|
|
|
10-19-2005
|
1.00
|
Continued with riveting of bottom skins
|
|
|
|
10-18-2005
|
1.50
|
Began riveting of bottom skins
|
Details
|
|
|
10-17-2005
|
2.00
|
Alodined skins
|
Details
|
|
|
10-16-2005
|
1.50
|
Dimpled right bottom skins
|
Details
|
|
|
10-16-2005
|
2.50
|
*FLAPS COMPLETE*
|
Details
|
|
|
10-15-2005
|
1.00
|
Mounted control unit for pitot
|
Details
|
|
|
10-15-2005
|
4.00
|
Bunch of fiddly stuff
|
Details
|
|
|
10-14-2005
|
2.00
|
Riveted gap fairings, installed right tank.
|
|
|
|
10-14-2005
|
0.50
|
Ran AoA and Pitot lines
|
Details
|
|
|
10-13-2005
|
0.50
|
Riveted in the replacment rib that had a crack.
|
|
|
|
10-13-2005
|
2.50
|
Painted gap fairings and dimpled left skins.
|
Details
|
|
|
10-12-2005
|
3.00
|
Finished pitot mount and drilled bottom skins
|
Details
|
|
|
10-11-2005
|
1.50
|
Continued fabricating bellcrank hardware
|
Details
|
|
|
10-11-2005
|
1.00
|
Began bottom skin assembly
|
Details
|
|
|
10-10-2005
|
1.00
|
Painted close in sections white
|
Details
|
|
|
10-10-2005
|
1.00
|
Fabricated push/pull and torque tubes
|
Details
|
|
|
10-09-2005
|
1.25
|
Riveted trailing edge, installed hardware.
|
Details
|
|
|
10-09-2005
|
2.00
|
Finished riveting skins and prosealed trailing edg
|
Details
|
|
|
10-08-2005
|
5.50
|
Riveted skeleton and some of the skins
|
|
|
|
10-08-2005
|
3.50
|
Primed tanks *TANKS COMPLETE*
|
Details
|
|
|
10-07-2005
|
4.00
|
Alodined and began riveting
|
Details
|
|
|
10-06-2005
|
0.40
|
Prosealed trailing edge
|
Details
|
|
|
10-06-2005
|
0.75
|
Prosealed optical sensors and leak
|
Details
|
|
|
10-06-2005
|
1.50
|
Dissasembled remaining flap and began deburr/dimpl
|
Details
|
|
|
10-06-2005
|
2.50
|
Completed dimpling
|
Details
|
|
|
10-05-2005
|
2.00
|
Finished fit assembly, began dissasembly.
|
|
|
|
10-04-2005
|
2.00
|
Assembled skeleton and skins for fit
|
|
|
|
10-03-2005
|
2.00
|
Fabricated, deburred flap attach brackets
|
|
|
|
10-02-2005
|
1.00
|
Did some more sanding of the tanks
|
|
|
|
09-30-2005
|
0.50
|
Started prep of flap parts
|
Details
|
|
|
09-30-2005
|
1.25
|
Drilled for optical sensors
|
Details
|
|
|
09-29-2005
|
1.25
|
Riveted all but trailing edge
|
|
|
|
09-29-2005
|
1.00
|
Marked level for fuel sensor and made bracket.
|
Details
|
|
|
09-28-2005
|
2.00
|
Began riveting ailerons
|
|
|
|
09-27-2005
|
0.50
|
Positioned tank for Fuel Guardian install
|
Details
|
|
|
09-27-2005
|
1.25
|
Finished dimpling & alodine
|
Details
|
|
|
09-26-2005
|
2.00
|
Continued dimpling and final fitting.
|
|
|
|
09-25-2005
|
6.50
|
Drilled, dimpled, alodined several parts
|
Details
|
|
|
09-24-2005
|
4.50
|
Finished preparing most of the skeleton & stiffner
|
Details
|
|
|
09-21-2005
|
1.50
|
Sanded and tested left tank
|
Details
|
|
|
09-21-2005
|
0.50
|
Began prep of parts
|
|
|
|
09-18-2005
|
3.00
|
Pressure testing and finish work
|
Details
|
|
|
09-16-2005
|
2.00
|
Reversed brackets, filled rivet holes
|
Details
|
|
|
09-11-2005
|
2.50
|
Started to fit some fairings
|
Details
|
|
|
09-11-2005
|
5.00
|
Installed baffles and inboard bulkhead.
|
Details
|
|
|
09-10-2005
|
9.00
|
Sealed the majority of the tanks
|
Details
|
|
|
09-08-2005
|
4.00
|
Began assembly with sealant
|
Details
|
|
|
09-07-2005
|
4.00
|
Finished match drill on right and dimpled all part
|
|
|
|
09-06-2005
|
1.00
|
Continued final drilling parts in right tank.
|
|
|
|
09-04-2005
|
7.00
|
Started pre assembly of tanks
|
Details
|
|
|
09-04-2005
|
2.00
|
Riveted left leading edge to spar *LE's COMPLETE*
|
Details
|
|
|
09-03-2005
|
5.50
|
Riveted right LE and attached it to wing spar
|
Details
|
|
|
09-02-2005
|
5.50
|
Installed landing light and AOA ports
|
Details
|
|
|
09-01-2005
|
3.50
|
Left leading edge riveted together.
|
Details
|
|
|
08-31-2005
|
1.50
|
Dimpled right skin and ribs
|
|
|
|
08-30-2005
|
2.50
|
Continued work on leading edges
|
Details
|
|
|
08-29-2005
|
1.00
|
Match drilled left leading edge
|
|
|
|
08-28-2005
|
5.50
|
Started wing leading edges
|
|
|
|
08-28-2005
|
3.50
|
Riveted the wing top skins. *TOP COMPLETE*
|
Details
|
|
|
08-27-2005
|
9.00
|
Riveted left wing skin on and started the right.
|
Details
|
|
|
08-26-2005
|
3.50
|
Finished match drilling and alodined skins
|
|
|
|
08-24-2005
|
3.50
|
Began the top wing skins
|
Details
|
|
|
08-22-2005
|
7.50
|
*REAR SPARS COMPLETE*
|
Details
|
|
|
08-20-2005
|
4.00
|
Began prep of rear spars
|
|
|
|
08-20-2005
|
4.50
|
*WING RIBS COMPLETE*
|
Details
|
|
|
08-13-2005
|
8.00
|
Prep and begin rib assembly
|
Details
|
|
|
08-10-2005
|
5.50
|
Began Wing Rib Section
|
Details
|
|
|
08-09-2005
|
1.75
|
Primed and completed spars
|
Details
|
|
|
08-06-2005
|
10.00
|
Finished main spars
|
Details
|
|
|
08-04-2005
|
1.50
|
Began left main spar
|
Details
|
|
|
07-19-2005
|
2.50
|
Completed inventory of wing kit
|
Details
|
|
|
07-17-2005
|
3.50
|
Started inventory of wing kit.
|
|
|
|
07-16-2005
|
7.50
|
*EMPANNAGE ASSEMBLY COMPLETE*
|
Details
|
|
|
07-15-2005
|
0.50
|
Drilled, painted, and primed elevator push tube.
|
|
|
|
07-15-2005
|
0.50
|
*TAILCONE COMPLETE*
|
Details
|
|
|
07-13-2005
|
0.75
|
Finished riveting top skins
|
|
|
|
07-12-2005
|
6.50
|
Finished attach VS, HS, & Elevators to tailcone
|
|
|
|
07-11-2005
|
3.00
|
Started elevator attachment
|
|
|
|
07-09-2005
|
5.50
|
Rivet bottom, side, top skins and aft deck
|
Details
|
|
|
07-08-2005
|
4.00
|
Riveted most of the bottom & side skins
|
|
|
|
07-06-2005
|
2.00
|
Continued assembly, riveting stiffners
|
|
|
|
07-05-2005
|
2.50
|
Began assembly, riveting bottom skin.
|
|
|
|
07-04-2005
|
5.25
|
Alodined all parts, began assembly
|
Details
|
|
|
07-03-2005
|
5.00
|
Completed dimpling
|
|
|
|
07-01-2005
|
0.75
|
More deburring, started dimpling
|
|
|
|
06-29-2005
|
0.50
|
Yet more deburring
|
|
|
|
06-28-2005
|
0.50
|
Continued deburring
|
|
|
|
06-27-2005
|
2.00
|
Began disassembly of tail and deburring
|
Details
|
|
|
06-26-2005
|
5.50
|
Completed pre-assembly of tail
|
|
|
|
06-25-2005
|
4.25
|
Continued pre-assembly of tailcone
|
|
|
|
06-19-2005
|
4.50
|
Started clecoing skins to bulkheads
|
Details
|
|
|
06-18-2005
|
5.75
|
Began tailcone
|
|
|
|
06-15-2005
|
2.00
|
*ELEVATORS COMPLETE*
|
Details
|
|
|
06-14-2005
|
5.50
|
Continued assembly of trim and elevators
|
|
|
|
06-13-2005
|
1.00
|
Continued work on elevators
|
|
|
|
06-12-2005
|
4.00
|
Finished trailing edge, began leading edges
|
|
|
|
06-10-2005
|
5.25
|
Prosealed tips and foam ribs, started on trim tabs
|
|
|
|
06-09-2005
|
3.00
|
Continued assembly
|
|
|
|
06-08-2005
|
6.50
|
Started assembly
|
|
|
|
06-07-2005
|
3.50
|
Alodined parts
|
|
|
|
06-05-2005
|
7.00
|
Disassembled, deburred, dimpled.
|
|
|
|
05-22-2005
|
4.50
|
Drilled skins and completed trim cable plates
|
|
|
|
05-21-2005
|
6.25
|
Began construction of elevators
|
Details
|
|
|
04-24-2005
|
4.50
|
*HORIZONTAL STABILIZER COMPLETE*
|
|
|
|
04-22-2005
|
2.25
|
Riveting HS together
|
|
|
|
04-21-2005
|
2.50
|
Began riveting nose ribs to skin
|
|
|
|
04-03-2005
|
8.00
|
Finished preparing Skins and Skeleton
|
Details
|
|
|
04-02-2005
|
1.50
|
Final drilled, deburred skins
|
|
|
|
03-28-2005
|
0.50
|
Final drilled nose ribs to skin
|
|
|
|
03-27-2005
|
3.25
|
Inspar and Nose Ribs prep
|
Details
|
|
|
03-27-2005
|
2.50
|
Clecoed Skin to Skeleton
|
|
|
|
03-23-2005
|
1.25
|
Riveted front and rear spars.
|
|
|
|
03-23-2005
|
1.30
|
Prepped and alodined spars and associated parts
|
|
|
|
03-22-2005
|
2.50
|
Drilled, deburred, prep on front spar
|
|
|
|
03-22-2005
|
1.25
|
Drilled rear spar, doubler, and hinges.
|
|
|
|
03-21-2005
|
1.50
|
Riveted trailing edge *RUDDER COMPLETE*
|
|
|
|
03-18-2005
|
5.00
|
Riveted skeleton, skins, and counter weight.
|
|
|
|
03-17-2005
|
0.70
|
Spar and rib riveting
|
Details
|
|
|
03-17-2005
|
1.75
|
Sealed trailing edge and riveted lower rib
|
|
|
|
03-17-2005
|
1.25
|
Deburred, countersunk, dimpled skeleton
|
|
|
|
03-17-2005
|
1.80
|
Alodined and primed parts
|
|
|
|
03-16-2005
|
2.00
|
Final drilled, deburred, and dimpled skins
|
|
|
|
03-15-2005
|
1.00
|
Deburred and clecoed skins
|
Details
|
|
|
03-13-2005
|
2.00
|
Deburred and clecoed skeleton
|
|
|
|
03-10-2005
|
3.50
|
Riveted on skin. *VS COMPLETE*
|
|
|
|
03-10-2005
|
1.00
|
Prepare rib and stiffner parts for rudder
|
Details
|
|
|
03-09-2005
|
3.00
|
Primed and assembled skeleton
|
|
|
|
03-08-2005
|
0.50
|
Rudder stop bracket
|
Details
|
|
|
03-08-2005
|
1.00
|
Primed and riveted front spar doubler
|
|
|
|
03-08-2005
|
0.50
|
Front spar doubler and dimpling
|
|
|
|
03-06-2005
|
4.50
|
Skin and spars
|
Details
|
|
|
02-27-2005
|
1.20
|
Rough rear spar assembly
|
Details
|
|
|
02-27-2005
|
2.50
|
Remainder of Emp kit
|
|
|
|
02-25-2005
|
2.50
|
Completed parts bags
|
|
|
|
02-24-2005
|
1.00
|
Begin parts bags for Emp kit
|
|
|