JIM'S WEB SITE
25 Logs Found 
First Photo
Date

Work Log Summary

Bottom cowling installed
01-21-2010
Installed Eng Cowling
Both seats installed
01-16-2010
Installed Heat Reflector material on Cowling
01-14-2010
Purged Oil sytem
01-13-2010
Added Engine Coolant
10-27-2009
Throttle & Chock cables
Attaching the rubber seal on cooling cuct.
10-22-2009
Trottle controls
Set cowling into place to dry overnight.
10-19-2009
Cowling ductwork

10-18-2009
Oil cooling duct work
10-17-2009
Oil cooler
Oil Cooler and bracket.
10-16-2009
Coolant system
10-15-2009
Coolant section
10-14-2009
Heater door control cable
Door to control heat into the cabin.
10-13-2009
Coolant system
Exhaust system installed
10-12-2009
Engine Exhaust system
Spinner finished
10-11-2009
Finished up Prop and Spinner, started Exhaust
10-10-2009
Prop Spinner
Drilling radius for cut out for the prop flanges.
10-09-2009
Installed Prop & Spinner
10-08-2009
Engine, connecting lines
Used engine hoist to lift engine into place.
10-07-2009
Engine install
10-06-2009
Engine
Air shround installed ontop of cylinders
10-03-2009
Engine
Removing the Intake manifolds
10-02-2009
Engine
09-30-2009
Engine wires

09-29-2009
Engine firewall forward wiring.
09-25-2009
Prop arrived today.