KitLog pro

Powered By Kitlog Pro v2.0

JIM'S WEB SITE
77 Logs Found 
First Photo
Date

Work Log Summary

01-20-2010
Finish strip around wing
Getting ready to start the engine for the 1st time.
01-19-2010
First Engine Run-up

01-15-2010
Interior install

01-01-2010
Reinstalled Canopy
12-31-2009
Upper panel skin installed
12-30-2009
Bleed brakes
12-08-2009
Interior

11-12-2009
Rear Window
Added ProSeal where it connects to the turtle skin.
11-11-2009
Fuel Tank
11-10-2009
Fuel Tank install
11-09-2009
Fuel tank
Pressurized tank with 1 psi and checked for leaks.
11-08-2009
Fuel Tank leak test
11-05-2009
Misc
11-04-2009
misc panels
11-03-2009
Rudder cable tunnel cover
Lap belts and flooring installed.
11-02-2009
Seat Belts

11-01-2009
Fuel Tank
10-31-2009
Fuel tank
10-30-2009
Fuel Tank
10-29-2009
Fuel Tank
09-22-2009
Fuel Tank
Mounted the fuel  fill nozzle cap.
09-21-2009
Fuel Tank

09-15-2009
Canopy Latch revision

08-24-2009
Cowling

08-21-2009
Canopy
Bottom Cowling in place and installing side hinge.
08-20-2009
Installing Cowling
Riveting the side hindge to the lower cowling.
08-20-2009
Cowling
Trimming the upper cowl with dremal tool disk.
08-12-2009
Cowling
08-11-2009
Cowling
Nose wheel attached and tension adjusted to 26 lbs.
08-10-2009
Brake lines

08-09-2009
Nose wheel
Left main gear with wheel attached.
08-07-2009
Mounted main wheels and nose gear.
Ben packing main gear bearings.
08-05-2009
Main Landing Gear
Main gear tire and wheel
08-04-2009
Tire Mounting
Nose wheel and tire.
08-03-2009
Tire Mounting
Ben helped with installing and removing the canopy until we got it right.
07-22-2009
Attaching the canopy
Fiberglass after it was removed from the fuselage.
07-10-2009
Triming Canopy
07-09-2009
Canopy
07-08-2009
Canopy sanding
07-07-2009
Sanding Canopy
Still sanding.
07-06-2009
Canopy

07-05-2009
Canopy sanding
Adding another layer of glass.
07-04-2009
Canopy
Adding glass to the sides.
07-03-2009
Canopy
Sanded down the foam blocks to shape of the fuselage sides.
07-02-2009
Canopy
Sanded the side canopy arms in prep for the foam to be attached.
06-30-2009
Canopy
Tapped the roll bar to install the guide blocks.
06-29-2009
Canopy
Clecoed canopy to frame.
06-28-2009
Canopy
Primed and painted canopy frame.
06-26-2009
Canopy
06-25-2009
Canopy
Ben sat inside to help while drilling thru side skirts.
06-24-2009
Canopy
Drilling canopy into front frame.
06-23-2009
Canopy
Trimming the rear edge of canopy.
06-22-2009
Canopy

06-17-2009
Canopy

06-16-2009
Canopy
Clamped roll bar with spacers.
06-15-2009
Canopy
06-12-2009
Canopy
06-11-2009
Flight Controls
Both rudder cables running back to rudder.
06-09-2009
Flight controls
Flaperon control handle in place with temp shims.
06-08-2009
Flight controls
Connected Flaperon mixer control.
06-07-2009
Flight controls
Connected Flaperon mixer control.
06-06-2009
Flight controls
Drilled and tapped the roll bar for the rear window.
06-04-2009
Electrical
New seats arrived today.
05-27-2009
Seats arrived today
Mixing ProSeal to use on the Fuel Tank.
05-26-2009
Fuel Tank
Painted the Flaperon control handle.  Also made up some of the control rods and parts.
05-25-2009
Flight controls

05-20-2009
Fuel Tank
Cleaned parts of the Fuel Tank.
05-19-2009
Fuel Tank
Installed rudder pedals and routed the wires.
05-18-2009
Electrical
05-15-2009
Electrical
05-14-2009
Electrical
Ran wires to the fuselage pin switch.
05-13-2009
Electrical

05-12-2009
Electrical
05-11-2009
Electrical
Side fuselage cover.
05-09-2009
Fuselage wiring
04-29-2009
organizing parts from inventory
04-28-2009
Inventory Finish Kit











Copyright © 2001-2010 Matronics. All Rights Reserved.