JIM'S WEB SITE
248 Logs Found 
First Photo
Date

Work Log Summary

http://www.youtube.com/watch?v=kEzfwFqWTJY
03-13-2010
In flight photos.
First take off at Blairsville, GA (KDZJ)
03-06-2010
First Flight
03-04-2010
Airworthy Inspection by DAR
02-21-2010
Calibrated fuel system
Checking airspeed system for leaks.
02-10-2010
Completed Acceptance test.
Bret setting up aircraft scales
02-06-2010
Weight & Balance
02-04-2010
Wing Walk material installed
Pulled my Zenair 601HDS out to make room for the RV-12
02-03-2010
Put Wings back on.
Bottom cowling installed
01-21-2010
Installed Eng Cowling
01-20-2010
Finish strip around wing
Getting ready to start the engine for the 1st time.
01-19-2010
First Engine Run-up
Both seats installed
01-16-2010
Installed Heat Reflector material on Cowling

01-15-2010
Interior install
01-14-2010
Purged Oil sytem
01-13-2010
Added Engine Coolant

01-12-2010
Picked up Wings from painter

01-11-2010
Checked on Wings at Painter
01-05-2010
Misc

01-04-2010
Painting the Wings

01-01-2010
Reinstalled Canopy
12-31-2009
Upper panel skin installed
12-30-2009
Bleed brakes
Just rolled fuselage out from painter.
12-29-2009
Re installed the rudder after paint.

12-29-2009
Picked up Fuselage from painter
Fuselage pretty much done.
12-23-2009
Checked on Painter
The arrow head is first layed out then the Indian warrior and horse is next.
12-17-2009
Paint status
12-16-2009
Checked on Painter
Imre still working on pin holes.
12-15-2009
Checked on Painter

12-11-2009
Checked on Painter
Sliver painted for bottom of fuselage.
12-10-2009
Checked on Painter
Fuselage primed
12-08-2009
Paint
12-08-2009
Interior
Fuselage and wings waiting their turn in the paint booth.
12-03-2009
Checked on painter
Many pin holes have been filled.
11-23-2009
Paint
Getting the wings ready to transport.
11-16-2009
Took to paint shop

11-12-2009
Rear Window
Added ProSeal where it connects to the turtle skin.
11-11-2009
Fuel Tank
11-10-2009
Fuel Tank install
11-09-2009
Fuel tank
Pressurized tank with 1 psi and checked for leaks.
11-08-2009
Fuel Tank leak test
11-06-2009
Paint scheme
11-05-2009
Misc
11-04-2009
misc panels
11-03-2009
Rudder cable tunnel cover
Lap belts and flooring installed.
11-02-2009
Seat Belts

11-01-2009
Fuel Tank
10-31-2009
Fuel tank
10-30-2009
Fuel Tank
10-29-2009
Fuel Tank
10-27-2009
Throttle & Chock cables
Attaching the rubber seal on cooling cuct.
10-22-2009
Trottle controls
Finished up the cooling duct fiberglass work.
10-20-2009
Fitted Wings and control tubes
Set cowling into place to dry overnight.
10-19-2009
Cowling ductwork

10-18-2009
Oil cooling duct work
10-17-2009
Oil cooler
Oil Cooler and bracket.
10-16-2009
Coolant system
10-15-2009
Coolant section
10-14-2009
Heater door control cable
Door to control heat into the cabin.
10-13-2009
Coolant system
Exhaust system installed
10-12-2009
Engine Exhaust system
Spinner finished
10-11-2009
Finished up Prop and Spinner, started Exhaust
10-10-2009
Prop Spinner
Drilling radius for cut out for the prop flanges.
10-09-2009
Installed Prop & Spinner
10-08-2009
Engine, connecting lines
Used engine hoist to lift engine into place.
10-07-2009
Engine install
10-06-2009
Engine
Air shround installed ontop of cylinders
10-03-2009
Engine
Removing the Intake manifolds
10-02-2009
Engine
09-30-2009
Engine wires

09-29-2009
Engine firewall forward wiring.
09-28-2009
Review plans on engine kit
Engine crate, 350 lbs
09-28-2009
Engine Kit arrived today (Inventory)
09-25-2009
Prop arrived today.
09-24-2009
Flaperons
09-22-2009
Fuel Tank
Mounted the fuel  fill nozzle cap.
09-21-2009
Fuel Tank

09-15-2009
Canopy Latch revision
09-14-2009
ELT
09-10-2009
Avionics
ELT bracket installed.
09-09-2009
Installed ELT
Garmin 496 GPS installed.
09-08-2009
GPS mounting
VHF Com antenna installed.
09-07-2009
Avionics
Fuse panel and switches
09-06-2009
Avionics
Tail fairing installed.
08-31-2009
Tail Cone fiberglass fairing.

08-30-2009
Tail cone, fiberglass fairing
Trimmed tail cone assembly.
08-28-2009
Tail Cone fiberglass fairing
Marked the excess trim lines to be cut.
08-26-2009
Tail fiberglass parts
08-26-2009
Avionics kit arrived

08-24-2009
Cowling

08-21-2009
Canopy
Bottom Cowling in place and installing side hinge.
08-20-2009
Installing Cowling
Riveting the side hindge to the lower cowling.
08-20-2009
Cowling
Trimming the upper cowl with dremal tool disk.
08-12-2009
Cowling
08-11-2009
Cowling
Nose wheel attached and tension adjusted to 26 lbs.
08-10-2009
Brake lines

08-09-2009
Nose wheel
Left main gear with wheel attached.
08-07-2009
Mounted main wheels and nose gear.
Ben packing main gear bearings.
08-05-2009
Main Landing Gear
Main gear tire and wheel
08-04-2009
Tire Mounting
Nose wheel and tire.
08-03-2009
Tire Mounting
Ben helped with installing and removing the canopy until we got it right.
07-22-2009
Attaching the canopy
Fiberglass after it was removed from the fuselage.
07-10-2009
Triming Canopy
07-09-2009
Canopy
07-08-2009
Canopy sanding
07-07-2009
Sanding Canopy
Still sanding.
07-06-2009
Canopy

07-05-2009
Canopy sanding
Adding another layer of glass.
07-04-2009
Canopy
Adding glass to the sides.
07-03-2009
Canopy
Sanded down the foam blocks to shape of the fuselage sides.
07-02-2009
Canopy
Sanded the side canopy arms in prep for the foam to be attached.
06-30-2009
Canopy
Tapped the roll bar to install the guide blocks.
06-29-2009
Canopy
Clecoed canopy to frame.
06-28-2009
Canopy
Primed and painted canopy frame.
06-26-2009
Canopy
06-25-2009
Canopy
Ben sat inside to help while drilling thru side skirts.
06-24-2009
Canopy
Drilling canopy into front frame.
06-23-2009
Canopy
Trimming the rear edge of canopy.
06-22-2009
Canopy

06-17-2009
Canopy

06-16-2009
Canopy
Clamped roll bar with spacers.
06-15-2009
Canopy
06-12-2009
Canopy
06-11-2009
Flight Controls
Both rudder cables running back to rudder.
06-09-2009
Flight controls
Flaperon control handle in place with temp shims.
06-08-2009
Flight controls
Connected Flaperon mixer control.
06-07-2009
Flight controls
Connected Flaperon mixer control.
06-06-2009
Flight controls
Drilled and tapped the roll bar for the rear window.
06-04-2009
Electrical
Clecoed the turtle deck skins on.
06-01-2009
Riveted turtle deck skins
05-31-2009
Turtle deck skins
Riviting the Tail section onto the main fuselage.
05-30-2009
Riveted tail section on to fuselage
Getting ready to attach the tail section.
05-29-2009
Connected Tail section
New seats arrived today.
05-27-2009
Seats arrived today
Mixing ProSeal to use on the Fuel Tank.
05-26-2009
Fuel Tank
Painted the Flaperon control handle.  Also made up some of the control rods and parts.
05-25-2009
Flight controls

05-20-2009
Fuel Tank
Cleaned parts of the Fuel Tank.
05-19-2009
Fuel Tank
Installed rudder pedals and routed the wires.
05-18-2009
Electrical
05-15-2009
Electrical
05-14-2009
Electrical
Ran wires to the fuselage pin switch.
05-13-2009
Electrical
05-12-2009
Painted the Instrument Panel

05-12-2009
Electrical
05-11-2009
Electrical
Side fuselage cover.
05-09-2009
Fuselage wiring
Fuselage Pins locked in place.
05-08-2009
Fitted Wings to Fuselage
Tapping the 10-24 tread into the pin.
05-07-2009
Fuselage Pins

05-06-2009
Map Box/Panel
Installed canopy ribs
05-05-2009
Top panel skin
Lower panel shelf
05-04-2009
Lower Panel shelf
Installing nut plates to panel shelf.
05-03-2009
Upper fire wall
Dimpling upper Fwd Fusealge doubler.
05-01-2009
Worked on upper fire wall
Finish Kit crate.  $321 shipping cost.
04-30-2009
Inventory finish kit
04-29-2009
organizing parts from inventory
04-28-2009
Reviewed plans for Finish Kit
04-28-2009
Inventory Finish Kit
Fitted brake lines to master cylinders
04-07-2009
Brake lines
Drilling the seat backs.
04-03-2009
Rudder & brake pedals

04-02-2009
Roll Bar Assembly

04-01-2009
Roll Bar
Rear baggage bulkhead clecoed in.
03-31-2009
Roll Bar
Drilled bulkhead to tail assembly.
03-30-2009
Roll Bar

03-28-2009
Roll Bar
03-27-2009
Roll Bar
Side air vent closed
03-26-2009
Finished Sec 23
Right side skins ready to rivet.
03-25-2009
Mid Fuselage Skins
03-24-2009
Fuselage side skins
Installing arm rest brackets
03-23-2009
Mid Fuselage
Installing Roll Bar base.
03-21-2009
Fuselage sides
Shut off valve with return line.
03-20-2009
Fuel system
Hitting the longerons to make the proper bend.
03-19-2009
Longerons
Fuel shut off valve installed
03-17-2009
Fuel Lines
03-16-2009
Fuel Lines
Lower front fuselage attached
03-15-2009
Finished attaching Forward Lower Fuselage skins.
Riveting nut plates to bottom fire wall and fuselage skin.
03-14-2009
Front lower fuselage
Riveting nut plates.
03-13-2009
Worked on front lower fuselage parts.
03-12-2009
Finished up Sec 21
Riveting the step floors.
03-10-2009
Step Floors
Cutting the angle brackets.
03-09-2009
Step attachment
Riveting corner skins.
03-08-2009
Riveted Bottom Skin.
03-07-2009
corner skins
Control colume installed, under seat ramp floor.
03-06-2009
Step Ramp floors
Doubler revieted.
03-05-2009
Bulkhead Assembly
Riveting seat floor to seat ribs
03-03-2009
Worked on Seat Floor Assemblies.
Finished Flaperon Mixer Arm Assembly.
03-02-2009
Working on seat rib assemblies.
Ben deburring some of the parts.
03-01-2009
Flaperon Mixer Arm Assem.
brackets with bearing.
02-28-2009
Worked on the mid fuselage and baggage floor.
Ben deburring parts.
02-27-2009
Worked on Mid fuselage
Setting rivets in bulkhead.
02-26-2009
Finished the Center section Bulkhead.
Fuselage kit after shipping packing removed.
02-25-2009
Started Fuselage kit.
Finished connecting the Anti Servo Tab Assembly.
02-25-2009
Finished the Empennage kit
Finished the TRIM/SERVO ASSEMBLY.
02-24-2009
TRIM/SERVO ASSEMBLY
Ready to attach Vertical Stab.
02-23-2009
Installed Vertical Stab and Stabilator.
Riveting side skins on Tail cone.
02-22-2009
Finished Tail cone skins
Bottom skins attached and riveted.
02-21-2009
Worked on Tail cone skins
Riveting the rear assembly.
02-20-2009
Worked on tail cone skins.
Riveting bulk head and splice bracket
02-19-2009
Worked on empennage skins.
Finished Stabilator.
02-18-2009
Finished Stabilator
Spar Box Assembly
02-16-2009
Worked on Horizontal Stabilator.
Front and Aft spars
02-15-2009
Started Horizontal Stabilator.
Riveting the control horn for Trim.
02-12-2009
Finished Anti Servo Trim
Rudder skeleton complete ready for skin
02-11-2009
Finished Rudder
Dimpling skin for nut plates.
02-10-2009
Finished Vertical Stab.
Clecoed and ready to Rivet.
02-10-2009
Finished Riveting Vert. Stab. skin
Finished hinge bearing assem.
02-08-2009
Worked on Vertical Stab.
Finished inventory of tail kit.
02-07-2009
Started Vertical Stabilizer
02-01-2009
Inventory of Tail Kit
Both the tail and fuselage crates.
01-30-2009
Inventory of Fuselage crate.
01-29-2009
Tail & Fuselage kits arrived
Installing main ribs for Right Flaperon.
12-19-2008
Finished skin on Right Flaperon.
12-16-2008
Deburred skins for Right Flaperon.
Getting ready to rivet the skin to the main ribs.
12-15-2008
Finished skin on Left Flaperon.
Counterbalance
12-14-2008
Worked on Left Flaperons
Raw stock to make brackets.
12-13-2008
Made Actuation and pivot brackets.
12-12-2008
Started work on Flaperons
Rt wing tip ready to rivet.
12-09-2008
Finished Rt wing tip.

12-08-2008
worked on right wing tip.
Ben riveting mid top skins on Right Wing.
12-06-2008
Finished Riveting top skins on Right Wing.
Tim, Rick, and Ron past Fire Dept Co-workers, helped with flipping the wing over.
12-05-2008
Riveting top skins on Right Wing.
Installing the Right Outboard bottom skin.
12-04-2008
Finished bottom skins on right wing.
Right Wing Inboard skin riveted.
12-03-2008
Started Right Wing skin
Bending the flanges on wing tip.
12-02-2008
Finished Riveting wing tip
Dimpled area for access door to stall warning device.
12-01-2008
Worked on Left Wing tip
Ben removing the protective plastic from the wing skins.
11-30-2008
Finished Riveting skins on left wing.
Riveted Hinge bracket assemblies to ribs.
11-28-2008
Riveting top Inboard skin
Riveting last Rivet on bottom skin left wing.
11-27-2008
Finished Riveting bottom skin left wing.
Deburring all holes in outboard skin.
11-26-2008
Riveted Outboard left skin
Left Inboard skin clecoed.
11-25-2008
Riveted Left inboard skin
Sub Spar Counter sunk, 1/4 inch hole gauge to check proper size.
11-24-2008
Counter sunk sub spar
11-20-2008
wired stall warning
Wing stand complete.
11-19-2008
Worked on Wing Stand
Installing the Stall Warning subassembly.
11-19-2008
Stall Warning assembly.
Looking down thru the nose ribs attached to wing spar.
11-18-2008
Wing Stand
Finished riveting ribs to Left spar, stored under my Zenair.
11-17-2008
Finished Left wing ribs, start on Right wing.
Riveting left rear spar.
11-16-2008
Installed ribs to spar
Nov 16th, The view from the hanger shows the snow covered mountain tops this am.
11-16-2008
Attached Ribs to Left Spar
Nose and Main Ribs that have been deburred and straightened.
11-15-2008
Worked on Nose Ribs
Using fluting pliers to straighten nose ribs.
11-14-2008
worked on Nose Ribs
clecoed and started riveting in place.
11-14-2008
Finished Rear Spar, Stub Spar, Hinge Brackets
Finished Riveting Attach Angles to Main Spar.
11-13-2008
Rear Spar, Stub Spar, Hinge Brackets.

11-12-2008
Spar Assembly
Doing Inventory of wing parts.
11-11-2008
Wing Kit Inventory

11-10-2008
Plan Review of Wing Kit Plans
Wing Kit consisted of 2 wood crates
11-10-2008
2nd Wing crate arrived
11-06-2008
Wing Spar delievery
This is my Zeniar CH601HDS that I finished back in May 2000.  It took around 1500 hrs to complete.
10-13-2008
Shop area

10-13-2008
built workbench
09-04-2008
Faxed order in for Wing Kit