248 Logs Found
First Photo
Date
Work Log Summary
03-13-2010
In flight photos.
03-06-2010
First Flight
03-04-2010
Airworthy Inspection by DAR
02-21-2010
Calibrated fuel system
02-10-2010
Completed Acceptance test.
02-06-2010
Weight & Balance
02-04-2010
Wing Walk material installed
02-03-2010
Put Wings back on.
01-21-2010
Installed Eng Cowling
01-20-2010
Finish strip around wing
01-19-2010
First Engine Run-up
01-16-2010
Installed Heat Reflector material on Cowling
01-15-2010
Interior install
01-14-2010
Purged Oil sytem
01-13-2010
Added Engine Coolant
01-12-2010
Picked up Wings from painter
01-11-2010
Checked on Wings at Painter
01-05-2010
Misc
01-04-2010
Painting the Wings
01-01-2010
Reinstalled Canopy
12-31-2009
Upper panel skin installed
12-30-2009
Bleed brakes
12-29-2009
Re installed the rudder after paint.
12-29-2009
Picked up Fuselage from painter
12-23-2009
Checked on Painter
12-17-2009
Paint status
12-16-2009
Checked on Painter
12-15-2009
Checked on Painter
12-11-2009
Checked on Painter
12-10-2009
Checked on Painter
12-08-2009
Paint
12-08-2009
Interior
12-03-2009
Checked on painter
11-23-2009
Paint
11-16-2009
Took to paint shop
11-12-2009
Rear Window
11-11-2009
Fuel Tank
11-10-2009
Fuel Tank install
11-09-2009
Fuel tank
11-08-2009
Fuel Tank leak test
11-06-2009
Paint scheme
11-05-2009
Misc
11-04-2009
misc panels
11-03-2009
Rudder cable tunnel cover
11-02-2009
Seat Belts
11-01-2009
Fuel Tank
10-31-2009
Fuel tank
10-30-2009
Fuel Tank
10-29-2009
Fuel Tank
10-27-2009
Throttle & Chock cables
10-22-2009
Trottle controls
10-20-2009
Fitted Wings and control tubes
10-19-2009
Cowling ductwork
10-18-2009
Oil cooling duct work
10-17-2009
Oil cooler
10-16-2009
Coolant system
10-15-2009
Coolant section
10-14-2009
Heater door control cable
10-13-2009
Coolant system
10-12-2009
Engine Exhaust system
10-11-2009
Finished up Prop and Spinner, started Exhaust
10-10-2009
Prop Spinner
10-09-2009
Installed Prop & Spinner
10-08-2009
Engine, connecting lines
10-07-2009
Engine install
10-06-2009
Engine
10-03-2009
Engine
10-02-2009
Engine
09-30-2009
Engine wires
09-29-2009
Engine firewall forward wiring.
09-28-2009
Review plans on engine kit
09-28-2009
Engine Kit arrived today (Inventory)
09-25-2009
Prop arrived today.
09-24-2009
Flaperons
09-22-2009
Fuel Tank
09-21-2009
Fuel Tank
09-15-2009
Canopy Latch revision
09-14-2009
ELT
09-10-2009
Avionics
09-09-2009
Installed ELT
09-08-2009
GPS mounting
09-07-2009
Avionics
09-06-2009
Avionics
08-31-2009
Tail Cone fiberglass fairing.
08-30-2009
Tail cone, fiberglass fairing
08-28-2009
Tail Cone fiberglass fairing
08-26-2009
Tail fiberglass parts
08-26-2009
Avionics kit arrived
08-24-2009
Cowling
08-21-2009
Canopy
08-20-2009
Installing Cowling
08-20-2009
Cowling
08-12-2009
Cowling
08-11-2009
Cowling
08-10-2009
Brake lines
08-09-2009
Nose wheel
08-07-2009
Mounted main wheels and nose gear.
08-05-2009
Main Landing Gear
08-04-2009
Tire Mounting
08-03-2009
Tire Mounting
07-22-2009
Attaching the canopy
07-10-2009
Triming Canopy
07-09-2009
Canopy
07-08-2009
Canopy sanding
07-07-2009
Sanding Canopy
07-06-2009
Canopy
07-05-2009
Canopy sanding
07-04-2009
Canopy
07-03-2009
Canopy
07-02-2009
Canopy
06-30-2009
Canopy
06-29-2009
Canopy
06-28-2009
Canopy
06-26-2009
Canopy
06-25-2009
Canopy
06-24-2009
Canopy
06-23-2009
Canopy
06-22-2009
Canopy
06-17-2009
Canopy
06-16-2009
Canopy
06-15-2009
Canopy
06-12-2009
Canopy
06-11-2009
Flight Controls
06-09-2009
Flight controls
06-08-2009
Flight controls
06-07-2009
Flight controls
06-06-2009
Flight controls
06-04-2009
Electrical
06-01-2009
Riveted turtle deck skins
05-31-2009
Turtle deck skins
05-30-2009
Riveted tail section on to fuselage
05-29-2009
Connected Tail section
05-27-2009
Seats arrived today
05-26-2009
Fuel Tank
05-25-2009
Flight controls
05-20-2009
Fuel Tank
05-19-2009
Fuel Tank
05-18-2009
Electrical
05-15-2009
Electrical
05-14-2009
Electrical
05-13-2009
Electrical
05-12-2009
Painted the Instrument Panel
05-12-2009
Electrical
05-11-2009
Electrical
05-09-2009
Fuselage wiring
05-08-2009
Fitted Wings to Fuselage
05-07-2009
Fuselage Pins
05-06-2009
Map Box/Panel
05-05-2009
Top panel skin
05-04-2009
Lower Panel shelf
05-03-2009
Upper fire wall
05-01-2009
Worked on upper fire wall
04-30-2009
Inventory finish kit
04-29-2009
organizing parts from inventory
04-28-2009
Reviewed plans for Finish Kit
04-28-2009
Inventory Finish Kit
04-07-2009
Brake lines
04-03-2009
Rudder & brake pedals
04-02-2009
Roll Bar Assembly
04-01-2009
Roll Bar
03-31-2009
Roll Bar
03-30-2009
Roll Bar
03-28-2009
Roll Bar
03-27-2009
Roll Bar
03-26-2009
Finished Sec 23
03-25-2009
Mid Fuselage Skins
03-24-2009
Fuselage side skins
03-23-2009
Mid Fuselage
03-21-2009
Fuselage sides
03-20-2009
Fuel system
03-19-2009
Longerons
03-17-2009
Fuel Lines
03-16-2009
Fuel Lines
03-15-2009
Finished attaching Forward Lower Fuselage skins.
03-14-2009
Front lower fuselage
03-13-2009
Worked on front lower fuselage parts.
03-12-2009
Finished up Sec 21
03-10-2009
Step Floors
03-09-2009
Step attachment
03-08-2009
Riveted Bottom Skin.
03-07-2009
corner skins
03-06-2009
Step Ramp floors
03-05-2009
Bulkhead Assembly
03-03-2009
Worked on Seat Floor Assemblies.
03-02-2009
Working on seat rib assemblies.
03-01-2009
Flaperon Mixer Arm Assem.
02-28-2009
Worked on the mid fuselage and baggage floor.
02-27-2009
Worked on Mid fuselage
02-26-2009
Finished the Center section Bulkhead.
02-25-2009
Started Fuselage kit.
02-25-2009
Finished the Empennage kit
02-24-2009
TRIM/SERVO ASSEMBLY
02-23-2009
Installed Vertical Stab and Stabilator.
02-22-2009
Finished Tail cone skins
02-21-2009
Worked on Tail cone skins
02-20-2009
Worked on tail cone skins.
02-19-2009
Worked on empennage skins.
02-18-2009
Finished Stabilator
02-16-2009
Worked on Horizontal Stabilator.
02-15-2009
Started Horizontal Stabilator.
02-12-2009
Finished Anti Servo Trim
02-11-2009
Finished Rudder
02-10-2009
Finished Vertical Stab.
02-10-2009
Finished Riveting Vert. Stab. skin
02-08-2009
Worked on Vertical Stab.
02-07-2009
Started Vertical Stabilizer
02-01-2009
Inventory of Tail Kit
01-30-2009
Inventory of Fuselage crate.
01-29-2009
Tail & Fuselage kits arrived
12-19-2008
Finished skin on Right Flaperon.
12-16-2008
Deburred skins for Right Flaperon.
12-15-2008
Finished skin on Left Flaperon.
12-14-2008
Worked on Left Flaperons
12-13-2008
Made Actuation and pivot brackets.
12-12-2008
Started work on Flaperons
12-09-2008
Finished Rt wing tip.
12-08-2008
worked on right wing tip.
12-06-2008
Finished Riveting top skins on Right Wing.
12-05-2008
Riveting top skins on Right Wing.
12-04-2008
Finished bottom skins on right wing.
12-03-2008
Started Right Wing skin
12-02-2008
Finished Riveting wing tip
12-01-2008
Worked on Left Wing tip
11-30-2008
Finished Riveting skins on left wing.
11-28-2008
Riveting top Inboard skin
11-27-2008
Finished Riveting bottom skin left wing.
11-26-2008
Riveted Outboard left skin
11-25-2008
Riveted Left inboard skin
11-24-2008
Counter sunk sub spar
11-20-2008
wired stall warning
11-19-2008
Worked on Wing Stand
11-19-2008
Stall Warning assembly.
11-18-2008
Wing Stand
11-17-2008
Finished Left wing ribs, start on Right wing.
11-16-2008
Installed ribs to spar
11-16-2008
Attached Ribs to Left Spar
11-15-2008
Worked on Nose Ribs
11-14-2008
worked on Nose Ribs
11-14-2008
Finished Rear Spar, Stub Spar, Hinge Brackets
11-13-2008
Rear Spar, Stub Spar, Hinge Brackets.
11-12-2008
Spar Assembly
11-11-2008
Wing Kit Inventory
11-10-2008
Plan Review of Wing Kit Plans
11-10-2008
2nd Wing crate arrived
11-06-2008
Wing Spar delievery
10-13-2008
Shop area
10-13-2008
built workbench
09-04-2008
Faxed order in for Wing Kit
SITE NAVIGATION
Contact Builder
RV-12 Home
All
Avionics
Empennage
Engine
Finish Kit
Flying
Fuselage
Inventory
Miscellaneous
Ordering supplies
Paint & Finish
Plan Review
Shop Supplies
Wings
Copyright © 2001-2010 Matronics. All Rights Reserved.