Powered By Kitlog Pro v2.0
My earth journey takes flight
Zodiac CH601 XLB-TD
Wing
Work Logs Found:
56
Category Work Time:
270 Hours
Date
Hours
Work Log Summary
Details
01-07-2017
10.00
Aileron Counter Weight Doublers and fitting
Details
02-28-2016
10.00
Wing Installation
02-27-2016
10.00
Left Wing skin riveting
Details
02-26-2016
4.00
LeftSkin
Details
02-25-2016
6.00
Right Wing Final Skin Riveting
02-14-2016
4.00
Right Wing Tank
02-08-2016
8.00
Fuel Tank Sender Reinstallation
Details
02-07-2016
2.00
Started Installing Right Fuel tank
Details
03-16-2015
2.00
Right Wing - Wing tip install and parts clean up
Details
03-10-2015
4.00
Right Wing - Tip
Details
01-03-2015
3.00
Finish wing locker doors
Details
12-30-2014
4.00
Left Wing - Rivet Bottom Rear and nose skin
Details
12-29-2014
4.00
Left Wing - Prim inside
Details
12-28-2014
6.00
Left Wing - Debur
Details
12-27-2014
4.00
Left Wing - Break Down for deburring
Details
12-22-2014
2.00
Left Wing - Baggage Locker
Details
12-18-2014
3.00
Left Flap - Fitting
Details
12-16-2014
4.00
Left Wing - Fuel tank inspection cover.
Details
12-09-2014
4.00
Left Wing - L Angles and Tip Access
Details
11-25-2014
7.00
Left Wing - L Angles and Locker divider
Details
11-15-2014
8.00
Left Wing - Wing Tip
Details
11-13-2014
3.00
Installed Left Wing Locker
Details
11-11-2014
7.00
Installation of Wing lockers
Details
10-24-2014
4.00
Left wing - Fitted top of leading edge skin
Details
10-21-2014
8.00
Left Wing - Bend and fit l leading edge skin
Details
10-17-2014
4.00
Left Wing - Aileron Fitting
Details
10-16-2014
1.00
Left Wing Leading edge rib preparation
10-15-2014
1.00
Left Leading Edge Rib Preparation
10-14-2014
6.00
Left Aileron Assembly
Details
10-12-2014
2.00
Preparations for Leading edge Skin and Alieron Tri
Details
10-12-2014
2.00
Left Alieron trim Tab
Details
10-11-2014
4.00
Left Wing Fitting (Tie Down, Bell Crank Access, Pi
Details
10-10-2014
8.00
Left Wing - Putting the Frame together
Details
10-08-2014
8.00
Left Wing - Clean, PRime and prep all parts
Details
10-03-2014
10.00
Right Wing Deburring and Leftwing Spar
Details
10-02-2014
6.00
Right Wing - Drilled out bottom skin to full size
Details
10-01-2014
6.00
Right Wing - Wrapped Leading Edge
Details
09-30-2014
4.00
Top leading edge skin
Details
09-29-2014
4.00
Vacuum forming the leading edge skin
Details
09-29-2014
4.00
Fitting the leading edge skin
Details
09-28-2014
6.00
Assembles all the Modification parts into wing.
Details
09-27-2014
8.00
Deburr and Primed upgrade and leading edge parts
Details
09-26-2014
6.00
Fitting leadng edge ribs
Details
09-23-2014
1.00
Pilot drilled right wing bottom skin L angles
Details
09-17-2014
2.00
Right Wing - Spar Extension & Cap Edge Distance
Details
09-16-2014
4.00
Alierion Bell Crank and Skin L angle Modifications
Details
09-12-2014
3.00
Right Wing Rear Spar Modification
Details
09-10-2014
1.00
De-riveting the top right wing skin rear spar line
Details
09-09-2014
4.00
Rear Spar modification
Details
09-09-2014
4.00
Fitting the Right Spar back to the wing
Details
09-07-2014
5.00
Riveting Right wing spar
09-06-2014
5.00
Riveting the right spar
Details
09-05-2014
6.00
Finished of preparing both spars for re riveting
Details
08-17-2014
5.00
Preparing update spare cap and wing root doubler
Details
08-15-2014
8.00
Remove rivets from main spare cap
Details
07-25-2014
1.00
Removed right wing spare
Details
SITE NAVIGATION
Contact Builder
Zodiac CH601 XLB-TD Home
Category
# Logs
# Hours
All
264
1832
Aircraft
10
108
Avionics
10
62
Canopy
10
65
Cockpit
18
152
Engine
72
515
Flight Controls
5
51
Flying :)
2
101
Fuel System
4
10
Fuselage
26
161
Inspections
5
16
Landing Gear
2
18
Miscellaneous
5
18
Surface Finishing
22
205
Tail
6
26
Tools
1
4
Training
2
12
Wing
56
270
Wing - Flap & Ailero
8
38
Copyright © 2001-2024 Matronics. All Rights Reserved.