Powered By Kitlog Pro v2.0
Michael's Cozy Web Site
Mk IV
Ch 21 Strakes &Tanks
Work Logs Found:
78
Category Work Time:
364 Hours
Date
Hours
Work Log Summary
Details
09-04-2022
8.00
Post Heat Treatment
Details
01-14-2021
2.00
Installing Fuel Caps
Details
01-03-2021
3.00
Installing Fuel Caps
Details
05-27-2019
4.00
Leading Edge and Outboard Fairing Blocks
Details
05-26-2019
6.00
Leading Edge and Outboard Fairing Blocks
Details
01-26-2019
2.00
Rudders - Starboard
Details
12-22-2016
5.00
Install Leading Edge and OB Fairing Block
Details
12-03-2016
6.00
Install Leading Edge and OB Fairing Block
Details
11-23-2016
6.00
Leading Edge and Outboard Fairing Block
Details
11-19-2016
3.00
Leading Edge and Outboard Fairing Block
Details
11-12-2016
2.00
Leading Edge and Outboard Fairing Block
Details
11-05-2016
3.00
Leading Edge and Outboard Fairing Blocks
Details
10-29-2016
2.00
Attitude adjustment for the plane
Details
07-31-2016
6.00
Install fairings in front of the fuel sump
Details
07-10-2016
2.00
Pressure Check
Details
07-09-2016
40.00
Pressure Check
Details
04-23-2016
4.00
Fuel Sumps
Details
04-10-2016
6.00
Outlet Piping - Fuel
Details
04-03-2016
3.00
Fuel Sumps
Details
04-02-2016
3.00
Fuel Sump
Details
02-13-2016
5.00
Install Bottom Skins
Details
02-06-2016
6.00
Install Bottom Skins
Details
01-16-2016
2.00
Installing Bottom Skin
Details
01-09-2016
4.00
Installing Bottom Skin
Details
01-01-2016
6.50
Covering the top skins
Details
12-31-2015
8.00
Covering the top skin
Details
12-30-2015
2.00
Covering the top skin
Details
12-26-2015
1.50
Covering the top skin
Details
12-22-2015
3.00
Covering the top skin
Details
12-19-2015
3.00
Covering the top skin
Details
12-12-2015
4.00
Install Outboard OD Baffle and Fuel Tubing
Details
11-21-2015
6.00
Install Top Skins
Details
11-20-2015
6.00
Install Top Skins
Details
11-15-2015
4.00
Install Top Skins
Details
11-14-2015
6.00
Install Top Skins
Details
11-13-2015
2.00
Install Top Skins
Details
10-31-2015
1.00
Installing Top Skins
Details
10-03-2015
4.00
Vent Screen and Drain
Details
08-22-2015
5.00
Installing Top Skins
Details
08-16-2015
5.00
Installing top skins
Details
08-09-2015
4.00
Installing Top skins
Details
08-08-2015
2.00
Installing Bottom Skin
Details
07-31-2015
3.00
Vent lines and drains
Details
07-31-2015
3.00
Installing Top Skins
Details
07-31-2015
2.00
Bottom Skin
Details
07-30-2015
2.00
Vent Lines
Details
07-03-2015
4.00
Vent line
Details
05-28-2015
10.00
Install Bottom Skin Core Copilot side
Details
05-27-2015
4.00
Install Bottom Skin Core Copilot side
Details
05-23-2015
2.00
Forming Top Skin Core Rib Flanges (T-Hats) Co Pilo
Details
05-22-2015
4.00
Forming Top Skin Core Rib Flanges (T-Hats) Co Pilo
Details
05-16-2015
4.00
Forming Top Skin Core Rib Flanges (T-Hats) Co Pilo
Details
05-09-2015
4.00
Forming Top Skin Core Rib Flanges (T-Hats) Co Pilo
Details
05-02-2015
2.00
Forming Top Skin Core Rib Flanges (T-Hats) Co Pilo
Details
01-02-2015
10.00
Installing Bottom Skin Core
Details
12-30-2014
4.00
Installing Bottom Skin Core
Details
12-29-2014
4.00
Forming Top Skin Core Rib Flanges (T-Hats)
Details
11-29-2014
8.00
Forming Top Skin Core Rib Flanges (T-Hats)
Details
11-28-2014
6.00
Forming Top Skin Core Rib Flanges (T-Hats)
Details
11-26-2014
3.00
Forming Top Skin Core Rib Flanges (T-Hats)
Details
11-25-2014
6.00
Forming Top Skin Core Rib Flanges (T-Hats)
Details
11-23-2014
3.00
Forming Top Skin Core Rib Flanges (T-Hats)
Details
11-22-2014
3.00
Forming Top Skin Core Rib Flanges (T-Hats)
Details
11-15-2014
8.00
Forming Top Skin Core Rib Flanges (T-Hats)
Details
11-14-2014
6.00
Forming Top Skin Core Rib Flanges (T-HATS)
Details
11-10-2014
2.00
Jigging and Assembly of Parts
Details
11-09-2014
3.00
Jigging and Assembly of Parts
Details
11-08-2014
6.00
Jigging and Assembly of Parts
Details
11-07-2014
3.00
Jigging and Assembly of Parts
Details
11-02-2014
3.00
Jigging and Assembly of Parts
Details
11-01-2014
8.00
JIGGING AND ASSEMBLY OF PARTS
Details
10-25-2014
3.00
JIGGING AND ASSEMBLY OF PARTS
Details
10-18-2014
3.00
JIGGING AND ASSEMBLY OF PARTS
Details
08-03-2014
3.00
Fabrication of Parts
Details
08-02-2014
6.00
Jigging and Assembly of Parts
Details
07-19-2014
6.00
Fabrication of Parts
Details
07-13-2014
2.50
Fabrication of Parts
Details
07-12-2014
5.00
Fabrication of Parts
Details
SITE NAVIGATION
Contact Builder
Mk IV Home
Category
# Logs
# Hours
All
671
3555
Ch 04 Bulkheads
5
97
Ch 05 FS Sides
6
75
Ch 06 FS Exterior
9
137
Ch 07 FS Assembly
6
70
Ch 08 Seat & Belts
6
28
Ch 09 LG & Brakes
17
212
Ch 10 Canard Wing
6
94
Ch 11 Elevators
7
62
Ch 12 Canard Install
3
22
Ch 13 Nose
23
206
Ch 14 Main Spar
10
152
Ch 15 FW Assembly
8
45
Ch 16 Control Systm
12
66
Ch 17 Center Console
8
28
Ch 18 Canopy
123
450
Ch 19 Wings & Ailern
122
416
Ch 20 Rudrs & Winglt
63
176
Ch 21 Strakes &Tanks
78
364
Ch 22 Electrical
12
115
CH 23 Engine Install
40
203
Ch 24 Cvrs & Fairing
50
148
Ch 25 Finishing
52
296
Miscellaneous
3
84
Modifications
1
6
Repairs
1
3
Copyright © 2001-2024 Matronics. All Rights Reserved.