Powered By Kitlog Pro v2.0
My RV-8 Build Log
RV-8
Avionics
Work Logs Found:
61
Category Work Time:
194 Hours
Date
Hours
Work Log Summary
Details
08-17-2019
1.00
ELT Battery Replacement
Details
06-22-2019
5.00
Audio Panel Check-Out
Details
06-02-2019
3.00
Database Updates, etc...
Details
05-26-2019
4.00
Avionics Software Updates and iPad Discovery
Details
01-05-2019
4.00
GMU 22 Re-Install
Details
02-11-2018
5.00
GPS20A Installation
Details
02-10-2018
4.00
GPS20A Test Fitting, etc.
Details
02-03-2018
4.00
New GPS GA35 Antenna Bracket
Details
01-28-2018
4.00
GPS Antenna Bracket
Details
01-27-2018
5.00
Avionic Tray for GPS20A WAAS Source for ADS-B
Details
01-21-2018
4.00
Prep for GPS20A Installation
Details
10-31-2017
2.00
Panel Fan, Switch and Circuit Breaker
Details
10-26-2017
2.00
Can Bus Run for G5
Details
10-25-2017
2.00
Call Me Crazy - Replacing the D6 with a G5
Details
10-21-2017
4.00
CAN BUS for G5
Details
01-11-2017
2.00
GDU 460, IBBS Reinstallation
Details
01-10-2017
3.00
GPSNAV and GDU GPS 26C Antennas
Details
01-07-2017
5.00
COMM 2 Inboard Bracket Adjustment
Details
01-05-2017
2.00
COMM 2 Relocation
Details
01-01-2017
4.00
COM2 Location Adjustment
Details
12-31-2016
5.00
Transponder Location Adjustment
Details
11-15-2015
4.00
Configure G3X Touch
Details
09-14-2015
2.00
Dynon D6 Connectivity
Details
08-17-2015
2.00
Transponder plate nut re-do
Details
08-06-2015
2.00
Wiring for GMS 240 to GDU 460
Details
08-04-2015
2.00
Wiring for GTX 23 ES Transponder
Details
08-01-2015
3.00
Wiring for GMC 305 A/P Controller
Details
07-28-2015
2.00
Install Garmin GMA 240 Audio Panel
Details
07-20-2015
2.00
Instrument Panel Flange
Details
07-19-2015
4.00
Test Fitting LRUs in new panel...
Details
07-18-2015
3.00
New Brackets for Avionics Stack
Details
07-16-2015
4.00
New Panel
Details
07-11-2015
4.00
Making sub-panel cuts
Details
07-05-2015
4.00
Instrument Panel Planning
Details
07-04-2015
3.00
Avionic Brackets
Details
07-03-2015
6.00
Instrument Panel Mods
Details
06-20-2015
4.00
GSA 28 Roll Servo Assy and Install
Details
06-11-2015
2.00
GSA 28 Pitch Servo Installation #4
Details
06-10-2015
2.00
GSA 28 Pitch Servo Installation #3
Details
06-09-2015
2.00
GSA 28 Pitch Servo Installation #2
Details
06-08-2015
2.00
GSA 28 Pitch Servo Installation
Details
06-03-2015
1.00
GSA 28 Servo Planning
Details
05-31-2015
4.00
Panel Adjustment Planning
Details
05-30-2015
5.00
GMA 240 Audio Panel Planning, etc...
Details
09-17-2014
2.00
Avionics - Static - AOA and Pitot
Details
09-15-2014
2.00
Avionics - Magnetometer Installation
Details
09-14-2014
3.00
Avionics - ADAHRS and EIS Installation
Details
09-13-2014
6.00
Avionics - ADAHRS and EIS Installation Trial
Details
09-11-2014
2.00
Avionics - EIS Bracket Assembly
Details
09-10-2014
2.00
Avionics - ADAHRS Bracket Assembly
Details
09-08-2014
2.00
Avionics - Magnetometer Bracket Install
Details
09-07-2014
5.00
Avionics - Magnetometer Bracket Assembly
Details
09-06-2014
3.00
Avionics - Magnetometer Bracket Assembly
Details
09-06-2014
3.00
Avionics - Comm 2 and Tranponder Install
Details
09-04-2014
2.50
Avionics - Comm 2 Install
Details
09-03-2014
2.50
Avionics - Comm 2 Install
Details
09-01-2014
6.00
Avionics - Transponder Install
Details
08-20-2014
2.00
Testing Fitting Avionics in Test Panel
Details
07-28-2014
2.00
More Panel Changes
Details
07-27-2014
4.00
Instrument Panel and more Wiring in Progress
Details
06-23-2014
2.00
Avionics Received - Check Invoice/Actual
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
876
2687
Ailerons and Flaps
1
5
Avionics
61
194
Baggage Door
1
3
Brake System
17
34
Cabin
7
40
Canopy
44
138
Cowl
56
180
DAR Inspection
1
3
Electrical
97
275
Empennage
97
342
Engine
122
322
Fairings
54
153
First Flight
1
2
Flight Control
17
46
Flight Training
2
10
Fuel System
34
106
Fuselage
98
299
Instrument Panel
17
60
Interior
13
42
Landing Gear
8
18
Lighting
10
26
Markings, Placards a
2
4
Miscellaneous
14
66
None
1
Paint and Prep
8
24
Phase I
1
2
Pitot/AOA
2
6
Post DAR Inspection
3
14
Prop
15
46
QB Kit
2
9
Static Pressure Syst
4
10
Tech Councilor Visit
1
2
Tech Inspection
1
2
Tires
1
1
Transition Training
1
10
Weight and Balance
1
3
Windscreen
27
75
Wings
34
115
Copyright © 2001-2024 Matronics. All Rights Reserved.