Powered By Kitlog Pro v2.0
My RV-8 Build Log
RV-8
Electrical
Work Logs Found:
97
Category Work Time:
275 Hours
Date
Hours
Work Log Summary
Details
07-22-2019
1.50
Replace IBBS Battery
Details
06-09-2019
3.00
Chasing Master Warning and Caution Lights
Details
04-07-2019
4.00
Rear Baggage Area Wiring Harness
Details
05-03-2018
2.00
Main Battery Hold Down
Details
04-21-2018
4.00
TNC 90 degree Garmin Antenna Connector
Details
02-04-2018
4.00
RG400 Connection for GPS Antenna
Details
01-20-2018
4.00
Relocating IBBS Master and ALT Power
Details
08-20-2017
3.00
Landing Light REDO - other side
Details
08-19-2017
5.00
Landing Land REDO
Details
08-01-2017
2.00
Right Wing Tip Landing Light Adjustment
Details
07-09-2017
4.00
Molex Connectors for Wing Tip Lights
Details
07-08-2017
4.00
Fitting the Wing Tip Lights
Details
06-28-2017
2.00
Rudder Light Wire Routing
Details
06-27-2017
2.00
Rudder Lighting Continued
Details
06-25-2017
4.00
Rudder Recognition Lighting
Details
06-18-2017
4.00
Roll Servo Wing Root Connector
Details
06-10-2017
4.00
Roll Servo Wiring in Right Wing
Details
06-07-2017
2.00
Wing Light Wiring
Details
06-02-2017
2.00
Wing Light Wire Routing
Details
07-15-2016
2.00
Fuel Line Specifications Continued
Details
06-07-2016
2.00
Baffle Riveting
Details
06-01-2016
2.00
Oil Cooler Relocation
Details
11-29-2015
3.00
Final behind the panel woring work
Details
11-14-2015
5.00
Power up Avionics for First Time
Details
11-11-2015
2.00
RG400 Assembly for Radios, Transponder and ADS-B
Details
11-03-2015
2.00
Interior Light Bus and Dimmer Control
Details
10-04-2015
4.00
Exterior Light Bus
Details
09-23-2015
2.00
Control Stick Assembly
Details
09-21-2015
2.00
Forward Control Stick
Details
09-19-2015
4.00
Wiring the forward control stick
Details
09-15-2015
2.00
More Wiring ...
Details
09-08-2015
2.00
More Wiring ...
Details
09-04-2015
2.00
Wiring planning
Details
08-16-2015
3.00
GTX 23 Transponder Pin Out
Details
08-15-2015
4.00
Headset Mic and Jack Connections go GMS 240
Details
08-13-2015
2.00
Installing Wiring Harness for Audio/Radios
Details
08-12-2015
2.00
Upgrade Circuit Breakers
Details
08-11-2015
2.00
Connecting the GMA 240, GTR 20 and GTR 200
Details
08-10-2015
2.00
Re-Pin the headset wiring for GMS 240
Details
08-09-2015
4.00
Heasset Mic and Phone Jacks - Pilot
Details
08-08-2015
6.00
Headset Mic and Phone Jacks - Rear Seat
Details
05-26-2015
2.00
GDU 460 Backshell Assembly
Details
05-24-2015
3.00
TCW IBBS Backup Battery
Details
05-20-2015
2.00
Install Ammeter Shunt
Details
05-17-2015
3.00
Securing things ...
Details
05-14-2015
2.00
Oil Temp Ring Connectors
Details
05-13-2015
2.00
Tach Sensor Ring Connectors
Details
05-12-2015
2.00
Install UMA Tach Sensor
Details
05-11-2015
1.00
UMA Tach Sensor
Details
05-10-2015
3.00
CHT and EGT sensor wire connections
Details
05-06-2015
2.00
RIght Side CHT and EGT
Details
05-05-2015
2.00
Connecting the Kavlico Sensors
Details
05-04-2015
2.00
Routing CHT and EGT Wires to Sensors
Details
04-26-2015
4.00
GEA 24 Stand-Off and assoc wiring
Details
04-13-2015
2.00
GEA 24 Clearance
Details
04-09-2015
2.00
Test Fitting Recent Electrical Work
Details
04-07-2015
2.00
More Electrical Work
Details
03-30-2015
2.00
GSA 25 / GT{59 / GMU 22
Details
03-28-2015
2.00
GEA 24 Backshell Assembly for Power/CAN
Details
03-21-2015
4.00
CAN Bus Completion
Details
03-14-2015
4.00
CAN Bus Construction
Details
03-03-2015
2.00
GEA 24 Connections
Details
02-15-2015
4.00
GEA 24 Backshell Assembly
Details
02-14-2015
4.00
GEA 24 Connector Assembly
Details
02-01-2015
3.00
Wire Assembly for GEA 24
Details
01-25-2015
4.00
FWF Engine Sensor Wiring
Details
01-19-2015
4.00
Fuel Boost Pump SCB and other stuff...
Details
01-11-2015
4.00
GDL 39R Installation
Details
01-10-2015
4.00
GDL 39 R ADS-B Bracket Re-Do
Details
01-04-2015
4.00
GDL 39 R ADS-B Bracket Assembly
Details
01-03-2015
4.00
IBBS Installation and GDL 39R Locating
Details
10-25-2014
5.00
Passenger USB and Headset Jack Prep
Details
10-20-2014
2.00
Engine Sensor Installation - Continued
Details
10-19-2014
4.00
Engine Sensor Installation
Details
10-18-2014
4.00
ELT Remote Switch Bezal Install
Details
10-17-2014
2.00
ELT Remote Switch Install
Details
10-16-2014
2.00
ELT Remote Switch Location
Details
10-15-2014
2.00
ELT Location
Details
10-13-2014
2.00
ELT Antenna Location
Details
10-12-2014
4.00
Comm and Xponder Antenna Installation - continued
Details
10-11-2014
4.00
Comm and Xponder Antenna Installation
Details
10-08-2014
2.00
Comm Antenna Location
Details
10-01-2014
2.00
Comm Antenna Doubler Plate
Details
09-30-2014
2.00
IBBS Continuation, etc.
Details
09-29-2014
2.00
IBBS Bracket Redo
Details
09-28-2014
3.00
IBBS Installation
Details
08-02-2014
2.00
P-Lead Installation
Details
07-29-2014
2.00
Airframe and Engine Ground
Details
07-26-2014
4.00
Starter Switch Connections
Details
07-22-2014
2.00
Starter and Master Contactors
Details
07-15-2014
2.00
Wiring Connections to SCB/CB
Details
07-14-2014
2.00
Wiring, and more wiring
Details
06-26-2014
2.50
Electrical - Re-Direct starter circuit
Details
06-22-2014
2.50
Electrical - SWB/CB Buss
Details
06-21-2014
2.50
Start Key/Switch Install
Details
06-21-2014
2.50
Contactors and stuff....
Details
06-19-2014
2.50
Electrical - SWB/CB Installation
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
876
2687
Ailerons and Flaps
1
5
Avionics
61
194
Baggage Door
1
3
Brake System
17
34
Cabin
7
40
Canopy
44
138
Cowl
56
180
DAR Inspection
1
3
Electrical
97
275
Empennage
97
342
Engine
122
322
Fairings
54
153
First Flight
1
2
Flight Control
17
46
Flight Training
2
10
Fuel System
34
106
Fuselage
98
299
Instrument Panel
17
60
Interior
13
42
Landing Gear
8
18
Lighting
10
26
Markings, Placards a
2
4
Miscellaneous
14
66
None
1
Paint and Prep
8
24
Phase I
1
2
Pitot/AOA
2
6
Post DAR Inspection
3
14
Prop
15
46
QB Kit
2
9
Static Pressure Syst
4
10
Tech Councilor Visit
1
2
Tech Inspection
1
2
Tires
1
1
Transition Training
1
10
Weight and Balance
1
3
Windscreen
27
75
Wings
34
115
Copyright © 2001-2024 Matronics. All Rights Reserved.