KitLog pro

Powered By Kitlog Pro v2.0

PETER'S WEB SITE
Work Logs Found: 34
Category Work Time: 121 Hours
 Date
Hours
Work Log Summary

Details

 07-20-2015
2.00
Started engine for first time - see details
Details
     

 07-05-2015
4.00
Worked on getting everything connected.

 07-02-2015
7.00
See details:
Details
       

 06-30-2015
3.00
See details
Details
       

 06-29-2015
2.00
See details
Details
     

 06-23-2015
2.50
Worked on baffle and wheel pants.
     

 06-22-2015
1.00
Continued working on new baffle seal.

 06-12-2015
4.00
Replaced seal on engine baffling.
     

 06-12-2015
3.00
Reinstalle baffle and worked on intake manifold.
     

 06-08-2015
3.50
Removed and installed new baffle seal.
       

 05-04-2015
5.00
Finished putting rubber around baffleing
       

 04-27-2015
5.00
Worked on fitting baffles to cowling.
       

 04-24-2015
5.00
Worked on installing seal to baffles & fuel lines.
       

 04-22-2015
2.50
Worked on engine cooling baffles
     

 04-20-2015
5.50
Worked on fuel system - see detaild
Details
       

 10-08-2014
4.00
See Detailed Discription
Details
       

 09-29-2014
7.00
Worked on baffles.
Details
     

 09-26-2014
2.50
Worked on baffles.
Details

 09-24-2014
2.00
Worked on baffles and wiring.

 09-22-2014
5.00
Continued work on baffles.
       

 09-20-2014
2.00
Rich & Peter worked on cooling baffles.
     

 08-04-2014
4.00
Rich & Peter worked on engine and attached it.
       

 07-28-2014
4.00
Did a number of things listed in details.
Details
       

 07-27-2014
3.00
Worked on valves getting ready to adjust them.
Details
       

 07-25-2014
2.00
Did odd & ends
       

 07-22-2014
1.00
Ron helped me torque the flywheel to 227 ft. lb.

 07-21-2014
2.00
Removed flywheel so it can be sealed and torqued.

 07-19-2014
5.00
Did a number of things- see details.
Details
       

 07-18-2014
2.00
Installed oil screen, oil pump, & worked on cooler
Details
       

 07-15-2014
2.50
made last 4 pushroods.
       

 07-12-2014
0.50
Made two oil lines for the oil cooler.
     

 06-28-2014
9.00
Bruce, Rich & Peter worked on engine.
Details
       

 06-27-2014
5.00
Rich, Bruce and Peter started on engine.
Details
     

 06-23-2014
3.50
Finished Vents and prepared engine case.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.