Powered By Kitlog Pro v2.0
JOHN's Web Site
RV-7A
Fuel and Vent Lines
Work Logs Found:
10
Category Work Time:
15 Hours
Date
Hours
Work Log Summary
Details
01-11-2014
0.50
Installed new fuel line
Details
12-10-2013
1.25
Calibrated left fuel tank
Details
11-23-2013
2.50
Gas in tanks for the first time
Details
11-23-2013
0.00
Gas continued
Details
11-02-2013
0.50
Secured and fitted the fuel vents.
Details
10-09-2013
0.75
Installed the fuel vents to bottom of fuselage.
Details
11-14-2003
0.00
Fuel selector valve installed.
Details
11-08-2003
4.00
Fuel vent lines.
Details
11-05-2003
2.25
Fuel line installtion.
Details
11-04-2003
3.00
Fuel line installtion.
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
711
1919
Avionics/Instruments
20
53
Battery Box
5
13
Brakes
21
39
Cabin Frame(Rollbar)
13
34
Canopy
70
212
Control Systems
2
2
Cowling
27
86
Electric Aileron Tri
2
8
Electric Elevator Tr
2
7
Electric Flap motor
6
20
Electrical
68
200
Empennage
100
310
Engine
62
180
Fiberglass work
15
39
Firewall
12
26
Fuel and Vent Lines
10
15
Fuel Tanks
5
8
Fuselage
106
280
Interior
1
3
Kit arrives
2
Landing gear
16
40
Landing Lights
6
19
Map Box
4
16
Miscellaneous
16
28
Moving plane to hang
3
Painting
18
63
Pictures of Myself
18
Prop
11
31
Service Bulletins
5
13
Shop Supplies
1
Tools
4
4
Weight and Balance
3
4
Wings
47
135
Wingtips
10
31
Copyright © 2001-2024 Matronics. All Rights Reserved.