KitLog pro

Powered By Kitlog Pro v2.0

JOHN's Web Site
Work Logs Found: 16
Category Work Time: 40 Hours
 Date
Hours
Work Log Summary

Details

 06-10-2014
3.50
Repack main gear wheel bearings.
Details
       

 03-16-2013
2.50
Setting Nosewheel Breakout Force.
Details
       

 04-17-2005
1.50
Torque the bolts
Details
       

 04-15-2005
6.00
Gear leg weldments
Details

 04-13-2005
4.25
Install the landing gear on aircraft
Details
       

 04-05-2005
2.00
Landing gear work
Details
     

 04-01-2005
2.00
Axle nut modification
Details
       

 03-31-2005
1.00
Axle nut modification
Details

 03-26-2005
4.25
Installed main wheels.
Details
       

 03-25-2005
2.50
Nose Wheel.
Details
       

 11-06-2003
2.25
Installing the nuts and bolts to the landing gear.
Details
       

 09-10-2003
1.25
Installing the landing gear mounts.
Details
       

 09-10-2003
1.50
Installing the landing gear mounts.
Details
       

 09-09-2003
2.50
Installing the landing gear mounts.
Details
       

 09-09-2003
2.25
Installing the landing gear mounts.
Details
       

 09-08-2003
1.25
Installing the landing gear mounts.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.