Powered By Kitlog Pro v2.0
JOHN's Web Site
RV-7A
Landing gear
Work Logs Found:
16
Category Work Time:
40 Hours
Date
Hours
Work Log Summary
Details
06-10-2014
3.50
Repack main gear wheel bearings.
Details
03-16-2013
2.50
Setting Nosewheel Breakout Force.
Details
04-17-2005
1.50
Torque the bolts
Details
04-15-2005
6.00
Gear leg weldments
Details
04-13-2005
4.25
Install the landing gear on aircraft
Details
04-05-2005
2.00
Landing gear work
Details
04-01-2005
2.00
Axle nut modification
Details
03-31-2005
1.00
Axle nut modification
Details
03-26-2005
4.25
Installed main wheels.
Details
03-25-2005
2.50
Nose Wheel.
Details
11-06-2003
2.25
Installing the nuts and bolts to the landing gear.
Details
09-10-2003
1.25
Installing the landing gear mounts.
Details
09-10-2003
1.50
Installing the landing gear mounts.
Details
09-09-2003
2.50
Installing the landing gear mounts.
Details
09-09-2003
2.25
Installing the landing gear mounts.
Details
09-08-2003
1.25
Installing the landing gear mounts.
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
711
1919
Avionics/Instruments
20
53
Battery Box
5
13
Brakes
21
39
Cabin Frame(Rollbar)
13
34
Canopy
70
212
Control Systems
2
2
Cowling
27
86
Electric Aileron Tri
2
8
Electric Elevator Tr
2
7
Electric Flap motor
6
20
Electrical
68
200
Empennage
100
310
Engine
62
180
Fiberglass work
15
39
Firewall
12
26
Fuel and Vent Lines
10
15
Fuel Tanks
5
8
Fuselage
106
280
Interior
1
3
Kit arrives
2
Landing gear
16
40
Landing Lights
6
19
Map Box
4
16
Miscellaneous
16
28
Moving plane to hang
3
Painting
18
63
Pictures of Myself
18
Prop
11
31
Service Bulletins
5
13
Shop Supplies
1
Tools
4
4
Weight and Balance
3
4
Wings
47
135
Wingtips
10
31
Copyright © 2001-2024 Matronics. All Rights Reserved.