Powered By Kitlog Pro v2.0
JOHN's Web Site
RV-7A
Painting
Work Logs Found:
18
Category Work Time:
63 Hours
Date
Hours
Work Log Summary
Details
02-15-2013
4.00
Primed and filled pinholes
Details
02-12-2013
3.25
Primed canopy frame
Details
02-03-2013
2.50
Priming cowling and canopy frame.
Details
01-17-2013
2.00
Primed upper cowl and oil door.
Details
10-16-2012
2.50
Tail and wingtips primed
Details
08-07-2006
5.00
Panel painting.
Details
08-06-2006
3.00
Panel painting.
Details
03-05-2006
4.25
Painted insturment bracket and fuel selector.
Details
05-30-2005
5.00
Remaking the rudder
Details
08-05-2004
3.50
Painting
Details
07-06-2004
1.00
Items reinstalled after painting.
Details
07-05-2004
4.00
Painted the cockpit
Details
07-04-2004
4.50
Cockpit prep for paint
Details
07-02-2004
3.50
Spraying Urethane
Details
06-30-2004
3.00
More priming of parts
Details
06-26-2004
5.00
Priming the seat backs
Details
06-16-2004
1.00
Primed tip up canopy frame
Details
06-12-2004
6.00
Painting prep work
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
711
1919
Avionics/Instruments
20
53
Battery Box
5
13
Brakes
21
39
Cabin Frame(Rollbar)
13
34
Canopy
70
212
Control Systems
2
2
Cowling
27
86
Electric Aileron Tri
2
8
Electric Elevator Tr
2
7
Electric Flap motor
6
20
Electrical
68
200
Empennage
100
310
Engine
62
180
Fiberglass work
15
39
Firewall
12
26
Fuel and Vent Lines
10
15
Fuel Tanks
5
8
Fuselage
106
280
Interior
1
3
Kit arrives
2
Landing gear
16
40
Landing Lights
6
19
Map Box
4
16
Miscellaneous
16
28
Moving plane to hang
3
Painting
18
63
Pictures of Myself
18
Prop
11
31
Service Bulletins
5
13
Shop Supplies
1
Tools
4
4
Weight and Balance
3
4
Wings
47
135
Wingtips
10
31
Copyright © 2001-2024 Matronics. All Rights Reserved.