Powered By Kitlog Pro v2.0
JOHN's Web Site
RV-7A
Canopy
Work Logs Found:
70
Category Work Time:
212 Hours
Date
Hours
Work Log Summary
Details
10-30-2013
0.50
Installed the Canopy seal.
Details
10-30-2013
1.00
Installed Canopy Release Spring and Secured
Details
08-10-2013
2.25
Fitting canopy after riveting the F-771
Details
07-08-2013
3.50
Reinstalled the canopy release mechanism
Details
12-13-2010
4.00
Canopy fairing.
Details
12-06-2010
3.25
Canopy Fairing.
Details
12-03-2010
1.75
Canopy Fairing.
Details
11-15-2010
1.25
Canopy Fairing.
Details
11-05-2010
1.50
Canopy Fairing.
Details
10-25-2010
1.50
Canopy fairing.
Details
10-18-2010
2.00
Canopy fairing
Details
10-17-2010
1.50
Canopy fairing.
Details
10-10-2010
3.50
Canopy Fairing.
Details
09-16-2010
1.50
Canopy fairing.
Details
07-29-2010
3.00
Canopy latch mechinism
Details
02-22-2010
2.75
Canopy skin painted flat black.
Details
12-31-2009
4.50
Ball stud mounts
Details
12-27-2009
4.25
Ball stud mounts aft and forward
Details
12-19-2009
5.50
Canopy, riveting, C-725, C-603, Canopy handle inst
Details
11-30-2009
3.50
Installing the reinforcement kit
Details
11-16-2009
2.25
Canopy Reinforcement kit installation
Details
11-09-2009
1.00
Deburred and primed side rails.
Details
11-09-2009
3.25
Canopy reinforcement kit
Details
11-02-2009
3.45
Canopy wedges and spacers for C-603
Details
10-26-2009
4.50
Remake right C-603 side skin
Details
10-05-2009
3.25
Enlarging the slot on F-705
Details
10-05-2009
4.25
C-603 side skins and F-705G angle.
Details
09-28-2009
3.50
Fitting the WD-622 to the F-631 Channels
Details
08-10-2009
4.00
Drilling the F-631 to the WD-725 side rails
Details
08-03-2009
2.00
Rivet the C-613 to the WD-725 side rails
Details
07-27-2009
7.50
Rebuilding the canopy frame.
Details
07-25-2009
3.50
Canopy Reinforcement Kit
Details
07-20-2009
3.50
Re-building the canopy frame
Details
06-22-2007
0.00
Reply from Vans on the side skin fitting problem.
Details
06-21-2007
7.25
Riveted side skins to canopy frame.
Details
06-20-2007
2.00
Side skins and C-702 prime and painted.
Details
06-19-2007
3.50
Canopy Side skin work.
Details
06-16-2007
4.50
Installing canopy side skins.
Details
07-31-2006
9.50
Trimming canopy.
Details
02-12-2006
4.75
Plexiglas canopy drilling and countersinking.
Details
01-21-2006
0.25
Ball stud bolt installed into mounts.
Details
01-16-2006
2.25
Drilling skin to canopy frame.
Details
01-15-2006
5.25
Ball mount brackets.
Details
01-08-2006
4.50
Tip up canopy ball stud mounts.
Details
06-14-2004
3.00
Deburring and prepping the canopy frame.
Details
05-12-2004
3.00
Drill roll bar and side rails
Details
05-07-2004
2.00
Sanding the plexiglas
Details
05-06-2004
6.00
Rear Window drilling
Details
05-05-2004
0.00
Drilling the Plexiglas canopy
Details
05-05-2004
7.00
Drilling the canopy
Details
05-04-2004
0.00
Cutting the Plexiglas Canopy
Details
05-04-2004
0.00
Cutting the Plexiglas
Details
05-04-2004
8.00
Cutting the canopy Plexiglas
Details
05-03-2004
3.50
Trimming the canopy.
Details
05-03-2004
0.00
Trimming the canopy
Details
05-03-2004
0.00
Trimming the canopy
Details
04-09-2004
0.00
Riveted C-613 splice plate
Details
04-09-2004
0.00
Drilling the C-613 splice plates.
Details
04-03-2004
0.00
Fitting the canopy frame.
Details
04-03-2004
0.00
Fitting the canopy frame.
Details
04-02-2004
0.00
Fitting the canopy frame.
Details
03-27-2004
5.50
Fitting the F-631A
Details
03-17-2004
6.00
Drilling the hinge brackets
Details
03-13-2004
10.00
Canopy Frame
Details
03-04-2004
1.00
Canopy Jettison Handle
Details
03-02-2004
6.00
C-710 pushrod and starting canopy
Details
03-01-2004
7.00
Canopy side handle
Details
02-29-2004
0.00
Canopy release mechanism-03
Details
02-29-2004
0.00
Canopy release mechanism-02
Details
02-29-2004
1.50
Canopy Release Mechanism
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
711
1919
Avionics/Instruments
20
53
Battery Box
5
13
Brakes
21
39
Cabin Frame(Rollbar)
13
34
Canopy
70
212
Control Systems
2
2
Cowling
27
86
Electric Aileron Tri
2
8
Electric Elevator Tr
2
7
Electric Flap motor
6
20
Electrical
68
200
Empennage
100
310
Engine
62
180
Fiberglass work
15
39
Firewall
12
26
Fuel and Vent Lines
10
15
Fuel Tanks
5
8
Fuselage
106
280
Interior
1
3
Kit arrives
2
Landing gear
16
40
Landing Lights
6
19
Map Box
4
16
Miscellaneous
16
28
Moving plane to hang
3
Painting
18
63
Pictures of Myself
18
Prop
11
31
Service Bulletins
5
13
Shop Supplies
1
Tools
4
4
Weight and Balance
3
4
Wings
47
135
Wingtips
10
31
Copyright © 2001-2024 Matronics. All Rights Reserved.