KitLog pro

Powered By Kitlog Pro v2.0

JOHN's Web Site
Work Logs Found: 21
Category Work Time: 39 Hours
 Date
Hours
Work Log Summary

Details

 07-09-2014
2.25
New Brake Lines
Details
       

 07-07-2014
2.25
Changing brakes lines
Details

 06-24-2014
0.20
Conditioning the Brakes
Details

 11-23-2013
1.00
Finished bleeding the brakes and repair a leak.
Details

 11-16-2013
2.50
Bleeding the brakes
Details
       

 06-13-2013
0.75
Shortened the existing F-6119 links
Details
     

 05-24-2013
0.50
Pimed the F-6119 rudder cable links
Details
     

 04-15-2006
3.75
Installed brake lines.
Details
       

 11-22-2003
0.00
Brake lines and hoses-03
Details
       

 11-22-2003
0.00
Brake lines and hoses-02
Details
       

 11-22-2003
6.00
Brake line and hoses-01
Details
       

 11-14-2003
1.00
Rudder pedal brace.
Details
       

 10-13-2003
1.50
Prepping the brakes pedals for anodize.
Details
     

 07-28-2003
2.25
Drilling the F6118 Brace.
Details
       

 07-22-2003
3.50
Brakes and rudder pedals in fuselage.
Details
       

 07-21-2003
0.50
Assembling the rudder and brake pedals.
Details
     

 07-20-2003
1.75
Rudder and brake pedals.
Details
       

 07-18-2003
1.25
Drilling the F-6116 side rudder pedal brg. blocks.
Details
     

 07-17-2003
2.25
Brake and rudder assembly
Details
       

 07-16-2003
4.00
Brake and rudder pedal assembly.
Details
       

 07-15-2003
2.25
Brake and rudder pedal assembly.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.