Powered By Kitlog Pro v2.0
JOHN's Web Site
RV-7A
Fuselage
Work Logs Found:
106
Category Work Time:
280 Hours
Date
Hours
Work Log Summary
Details
05-10-2014
1.00
Some more labels
Details
04-29-2014
2.50
Heat sheild and flap rod.
Details
04-12-2014
1.00
Attached Data Plate
Details
02-06-2014
2.00
Made bushings for seat belts and harnesses.
Details
01-11-2014
1.00
Installing forward cover assembly
Details
01-06-2014
3.00
Floor cover and bulkhead screw installation
Details
12-10-2013
0.25
Added bolts where the factory left out rivets
Details
11-16-2013
0.50
Trimmed and attached the vent tubing.
Details
11-13-2013
0.50
Air Vents
Details
07-28-2013
1.00
Center Floor Cover
Details
06-23-2013
4.25
Riveted top skin
Details
06-18-2013
3.50
Riveted the F-704K upright cap strips
Details
06-02-2013
4.00
Riveting the F-771 forward top skin
Details
05-24-2013
1.50
Primed and burred the F-771 Top Skin
Details
07-23-2010
1.50
Cowling attach brackets
Details
07-08-2010
1.00
Rear window
Details
07-01-2010
1.25
Installing rear window.
Details
06-30-2010
1.25
Rear Window Installation
Details
06-30-2010
1.25
Inspection plates
Details
06-20-2010
3.50
Inpection plates for the F-771 skin.
Details
06-15-2010
3.50
Cutting inspection plates for the F-771
Details
06-10-2010
2.50
Cutting inspection plates for the F-771
Details
06-09-2010
3.50
Cutting inspection plates for the F-771
Details
05-10-2010
6.00
Riveting the F-774 aft top skin.
Details
05-03-2010
1.50
Headphone hangers
Details
03-22-2010
2.25
Pilot step installation
Details
03-21-2010
3.25
Pilot step installation
Details
03-15-2010
4.25
Pilot step installation
Details
01-26-2009
1.00
VS-411PP installation.
Details
08-31-2008
3.50
Parking brake finsihed
Details
08-31-2008
0.00
Parking brake finish Cont'd
Details
08-22-2008
0.00
Parking brake installation-02
Details
08-22-2008
2.00
Parking brake installation-01
Details
02-16-2006
2.00
Eyeball Vent Installation.
Details
09-28-2005
3.50
Rudder cables and links
Details
09-16-2004
1.00
Installed instrument panel
Details
08-11-2004
4.00
Firewall hole locations.
Details
08-06-2004
4.00
Tip up frame and installed seats
Details
08-04-2004
4.25
Forward fuselage
Details
08-03-2004
5.50
Forward fuselage, Rudder cable clamp holes.
Details
08-02-2004
9.00
Fuel line, Air vents, rudder cable fairings, and s
Details
07-11-2004
0.00
Air Vents.
Details
07-11-2004
3.50
Air Vents
Details
07-07-2004
2.50
Installed flap actuation latch weldments. EXP deca
Details
04-09-2004
7.00
Canopy Frame
Details
03-03-2004
4.00
Canopy Frame
Details
03-01-2004
0.00
Canopy release
Details
02-28-2004
6.00
Canopy release mechanism-01
Details
02-21-2004
6.00
Canopy release system
Details
01-25-2004
7.00
F-771 Top skin.
Details
01-24-2004
5.25
Sub panel work
Details
01-24-2004
3.25
Forward Fuselage
Details
01-23-2004
2.50
Forward fuselage
Details
01-22-2004
1.50
Sub Panel
Details
01-21-2004
3.50
Control Panel
Details
01-19-2004
2.50
F-703B drilled to panel.
Details
01-17-2004
4.00
Upper forward fuselage
Details
01-11-2004
3.50
Forward Deck
Details
01-08-2004
2.00
Cabin Frame
Details
01-05-2004
3.00
Cabin Frame
Details
01-04-2004
0.00
Cabin Frame
Details
12-07-2003
2.25
Cabin Frame
Details
12-05-2003
2.00
Aft bulkhead.
Details
11-18-2003
4.00
Vent lines
Details
11-13-2003
5.00
Fuel valve covers, F-6122-1, and rudder pedal brac
Details
10-15-2003
1.25
Flap rods attached and rear spar prepped.
Details
10-06-2003
1.00
Wing mating drift pins
Details
10-04-2003
0.75
Wing/Fuselage Assembly.
Details
10-03-2003
1.00
Flap Push Rods
Details
10-02-2003
0.50
Flap push rods
Details
09-30-2003
0.00
Installed control stick system and fuel line hole-
Details
09-29-2003
2.25
Installed control stick system and fuel line hole-
Details
09-29-2003
1.25
Fuel tank attach bracket assembly.
Details
09-27-2003
2.25
Vent line bulkheads and fuel selector valve.
Details
09-27-2003
0.50
Priming tank attach bracket components.
Details
09-27-2003
1.50
Fuel tank attach brackets.
Details
09-27-2003
1.25
Fuel selector valve.
Details
09-25-2003
1.50
Fuel vent installation & fuselage side hole.
Details
09-22-2003
0.00
Boot rings continued
Details
09-21-2003
3.75
Stick boot rings.
Details
09-14-2003
3.50
Installing the landing gear mounts.
Details
08-28-2003
6.00
Forward covers.
Details
08-27-2003
0.00
Seat fabrication-04
Details
08-27-2003
0.00
Seat fabrication-03
Details
08-27-2003
0.00
Seat fabrication-02
Details
08-27-2003
2.00
F-741 Tunnel Cover
Details
08-27-2003
4.00
F-741 Tunnel Cover
Details
08-26-2003
12.00
Seat fabrication-01
Details
08-21-2003
2.75
F-757
Details
08-20-2003
6.00
F-741A L-R
Details
08-19-2003
3.00
Aft seat floors.
Details
08-18-2003
2.50
Aft seat floors.
Details
08-17-2003
4.25
Baggage floor.
Details
08-13-2003
3.00
Step Installation.
Details
08-11-2003
2.25
Step Installation.
Details
08-11-2003
3.50
Step installation
Details
08-09-2003
1.50
Step Installation.
Details
08-04-2003
3.00
F-750 baggage side covers.
Details
08-03-2003
3.00
Drilled top aft skin to stiffeners and bulkhead.
Details
08-02-2003
1.75
F-688 Gusset.
Details
08-01-2003
0.75
Bellcrank Assembly
Details
07-31-2003
1.00
Bellcrank Assembly
Details
07-30-2003
1.50
Bellcrank assembly
Details
07-14-2003
4.50
F-705G Angle installation.
Details
07-12-2003
4.00
F-796C and D spacers
Details
07-09-2003
3.50
F-705G angles and flap actuator bearing blocks.
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
711
1919
Avionics/Instruments
20
53
Battery Box
5
13
Brakes
21
39
Cabin Frame(Rollbar)
13
34
Canopy
70
212
Control Systems
2
2
Cowling
27
86
Electric Aileron Tri
2
8
Electric Elevator Tr
2
7
Electric Flap motor
6
20
Electrical
68
200
Empennage
100
310
Engine
62
180
Fiberglass work
15
39
Firewall
12
26
Fuel and Vent Lines
10
15
Fuel Tanks
5
8
Fuselage
106
280
Interior
1
3
Kit arrives
2
Landing gear
16
40
Landing Lights
6
19
Map Box
4
16
Miscellaneous
16
28
Moving plane to hang
3
Painting
18
63
Pictures of Myself
18
Prop
11
31
Service Bulletins
5
13
Shop Supplies
1
Tools
4
4
Weight and Balance
3
4
Wings
47
135
Wingtips
10
31
Copyright © 2001-2024 Matronics. All Rights Reserved.