KitLog pro

Powered By Kitlog Pro v2.0

JOHN's Web Site
Work Logs Found: 68
Category Work Time: 200 Hours
 Date
Hours
Work Log Summary

Details

 04-17-2014
0.50
Installed new Odyssey PC-680 Battery
Details

 02-26-2014
0.50
Installed batteries to the ELT.
Details
     

 12-10-2013
0.25
Secured D-sub stick wiring
Details
     

 09-18-2013
4.75
Secured wires from control stick and wingtips.
Details
       

 07-28-2013
3.25
Corrugated tubing added for wire protection.
Details
       

 04-28-2013
1.50
Dimmer troubles
Details
       

 03-07-2011
2.50
Wired the landing light and secured wiring.
Details
       

 10-13-2008
2.50
P-lead connection to right mag
Details
       

 09-29-2008
2.25
P-lead installation
Details
       

 09-22-2008
3.50
Starter cable installation
Details
       

 09-21-2008
2.75
Alternator Power Lead
Details
       

 09-14-2008
1.00
Fusible links from the ammeter shunt.
Details
       

 09-13-2008
0.75
Engine grounding strap
Details
       

 09-08-2008
2.50
Installed the ammeter shunt
Details
       

 08-31-2008
1.00
Finished routing the alternator field wire
Details

 08-24-2008
0.50
Alternator field wire fabrication
Details
       

 08-20-2008
4.25
Oil pressure switch and warning light install.
Details
       

 08-18-2008
1.50
GT-50 installation.
Details
     

 08-14-2008
1.50
Tachometer sender.
Details
     

 08-13-2008
2.50
Fuel and oil pressure senders.
Details
       

 06-28-2008
1.50
Installing JPI EDM-700
Details
       

 07-05-2007
2.00
Alternator installation.
Details
       

 05-15-2007
1.50
Fabricated jumper wires for instruments.
Details
     

 05-05-2007
6.50
Install low voltage light
Details
       

 04-22-2007
1.25
Clearance slots for the ELT and GPS connectors.
Details
     

 10-29-2006
4.50
Antenna installation.
Details
       

 09-15-2006
2.75
Installed new panel in plane and tested.
Details
     

 09-02-2006
2.50
Laying out panel switches.
Details
     

 06-04-2006
3.50
Wiring the headphone jacks.
Details
       

 05-28-2006
8.25
Intercom installation.
Details
       

 04-08-2006
3.50
Wired the fuel pump.
Details

 04-02-2006
4.50
Strobe wiring
Details

 12-30-2005
4.25
Trim wiring
Details
       

 12-27-2005
4.50
D-sub stick wiring and center tunnel wiring.
Details
       

 11-13-2005
4.25
ELT
Details
       

 10-23-2005
1.50
ELT installation
Details

 10-16-2005
2.50
Drilling Z-brackets for ELT
Details
     

 10-09-2005
6.50
Static line, installed strobe power supply
Details
       

 09-09-2005
2.00
Battery cable
Details

 09-05-2005
8.00
Wiring the trim servo
Details

 05-10-2005
1.75
Headphone jacks.
Details
       

 04-19-2005
4.00
Elevator trim wiring
Details
       

 03-23-2005
3.50
Installing ELT
Details
       

 03-12-2005
2.50
Wiring Strobe
Details
       

 02-26-2005
6.00
Eyeball lights and saftey wired the flap actuator.
Details
       

 02-15-2005
4.00
Eyeball lights and wiring
Details
     

 02-05-2005
5.00
Dimmer, voltage reg., and wiring
Details
       

 01-23-2005
4.00
Wigwag flasher and switches
Details
       

 01-16-2005
6.00
Instrument wiring
Details
     

 01-09-2005
4.50
Installed voltage regulator.
Details
       

 12-31-2004
0.00
Dimmer contol is in panel
Details
     

 12-30-2004
0.50
Dimmer Control
Details
     

 12-29-2004
6.00
Wiring the panel.
Details
       

 12-27-2004
5.00
Intercom installation.
Details
       

 12-26-2004
3.00
Wiring the Ray Allen control stick grip.
Details
       

 11-28-2004
3.00
Wiring the wings and fuselage
Details
       

 11-21-2004
2.00
Wing wiring and compass hole in the panel.
Details
       

 10-31-2004
2.00
Pitot tube and strobe wire.
Details
       

 10-17-2004
6.00
Dimmer, flap switch, and hobbs installation.
Details
       

 09-25-2004
1.50
Installing switches
Details
       

 09-22-2004
2.00
Diode installation on master and starter relays.
Details
     

 09-20-2004
2.00
Battery cable, battery bus.
Details
       

 09-18-2004
1.50
Current limiter
Details
       

 09-17-2004
3.00
Current limiter
Details
       

 09-12-2004
1.00
Connecting the main and E-bus
Details
       

 09-10-2004
1.00
Grounding Block
Details
       

 09-09-2004
1.50
Heavy gauge electrical cables.
Details
       

 08-31-2004
2.00
Fuse block and bridge-diode installation.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.