KitLog pro

Powered By Kitlog Pro v2.0

JOHN's Web Site
Work Logs Found: 100
Category Work Time: 310 Hours
 Date
Hours
Work Log Summary

Details

 10-30-2013
0.25
Drilled drain hole in lower rudder fairing
Details
     

 10-21-2013
2.75
Tail fairing. Drilled out rivet and tap hole for s
Details
       

 04-28-2013
1.00
N-Number
Details
       

 09-28-2012
4.50
Primed the tail and installed tinnerman washers.
Details
       

 05-08-2012
1.25
Primed the empennage tips
Details
       

 06-11-2011
2.50
Closing the fiberglass tips on the tail
Details
       

 02-07-2011
2.25
Closing the fiberglass tips on the tail.
Details
       

 04-11-2007
2.00
Riveted lower rudder fairing.
Details
       

 03-11-2006
4.15
Drilling for nutplates for the empennage fairing.
Details
     

 02-06-2006
2.25
Installing the empennage fairing.
Details
       

 08-08-2005
29.00
Tail work
Details
       

 06-26-2005
5.50
Rudder stops
Details
     

 06-17-2005
6.50
Remake rudder stops and rudder strips
Details

 06-12-2005
4.50
Installing rudder
Details

 06-07-2005
3.00
Remaking the rudder
Details
       

 06-04-2005
1.75
Remaking the rudder
Details
       

 06-01-2005
2.00
Remaking the rudder
Details

 05-31-2005
2.50
Remaking the rudder
Details
       

 05-16-2005
3.00
Remaking rudder
Details
     

 05-14-2005
4.00
Remaking the rudder
Details
     

 05-10-2005
1.25
Prep stiffeners and rudder skin.
Details

 05-06-2005
2.25
Remaking the rudder
Details
     

 05-05-2005
2.00
Remaking the rudder
Details

 05-02-2005
2.00
Remaking the rudder
Details
     

 04-26-2005
1.50
Remaking the rudder
Details
     

 04-18-2005
2.50
Attaching tail
Details

 04-14-2005
1.50
Installing Tail
Details

 12-29-2003
3.50
F-712E Tie down bar.
Details
       

 12-24-2003
4.00
Enlarge tunnel pass through for push rod and and t
Details
       

 12-24-2003
0.00
Attaching the verticle stabilizer.
Details
       

 12-23-2003
7.00
Vertical stabilizer installation
Details
       

 12-23-2003
0.00
Fitting the empennage
Details
       

 12-23-2003
0.00
Attaching verticle stabilizer.
Details
       

 12-22-2003
7.00
Mating the horizontal stabilizer.
Details
       

 12-07-2003
5.00
Elevator control rods.
Details
       

 12-03-2003
0.75
Rivet the rudder stops.
Details
       

 12-02-2003
0.50
Primming the rudder stops.
Details
     

 12-01-2003
4.00
Riveted aft bulkhead.
Details
       

 11-30-2003
8.00
Elevator horns and tail section.
Details
       

 11-30-2003
0.00
Drilling aft bulkhead and rudder stops.
Details
       

 03-29-2003
2.00
More fiberglass tip work.
Details

 03-15-2003
2.50
Attaching fiberglass tips. Van's reply.
Details

 03-11-2003
1.00
Elevator slightly bowed.
Details
       

 03-01-2003
4.25
Installing the fiberglass tips
Details
       

 02-17-2003
1.00
Final riveting of trim tab to elevator.
Details
       

 02-16-2003
1.75
Attaching trim tab to left elevator.
Details
       

 02-15-2003
6.50
Riveting left Elevator.
Details
       

 02-15-2003
2.50
Priming elevator components.
Details
       

 02-09-2003
0.00
Riveting the trim tab.
Details
       

 02-09-2003
0.00
Finished trim tab assembly.
Details
       

 02-08-2003
4.25
Riveting the trim tab.
Details
       

 02-02-2003
2.00
Deburred and primed trim trim tab components.
Details
       

 02-01-2003
0.50
Trimming the trim tab hinge.
Details
       

 01-31-2003
4.25
Trim Tab
Details
       

 01-26-2003
3.75
Right elevator attached to horizontal stab.
Details
       

 11-02-2002
6.00
Drilling the left elevator.
Details

 10-30-2002
0.00
Right Elevator - Part 03
Details
       

 10-30-2002
0.00
Right Elevator - Part 02
Details
       

 10-30-2002
8.00
Right Elevator - Part 01
Details
       

 10-26-2002
4.00
Riveting the right elevator.
Details
       

 10-23-2002
2.75
Final elevator work.
Details

 10-22-2002
4.50
Drilling elevator spares and ribs.
Details
       

 10-20-2002
4.00
Back riveted the stiffeners to the elevators.
Details
       

 10-19-2002
5.00
Primed the elevator components.
Details
       

 10-16-2002
2.50
Drilling, deburring, and dimpling the stiffeners.
Details
     

 10-15-2002
2.00
More stiffener debacles.
Details

 10-06-2002
0.50
Checking fit of stiffeners.
Details
     

 10-03-2002
2.00
Elevator skin deburring and dimpling.
Details
       

 09-30-2002
1.50
Mistake on the elevator siffeners.
Details

 09-29-2002
3.00
Fabricated the elevator stiffeners.
Details

 08-04-2002
4.00
Mistake on rudder.
Details

 08-03-2002
6.00
Finished the rudder stiffeners.
Details
     

 08-01-2002
3.00
Started Rudder
Details

 07-28-2002
5.00
Finished vertical stabilizer
Details
       

 07-25-2002
3.00
Riveting the Vertical Stabilizer.
Details
       

 07-23-2002
2.50
Riveting rear spar of vertical stabilizer.
Details
       

 07-11-2002
5.00
Deburring and priming of the vertical stabilizer.
Details

 07-07-2002
5.00
Drilled and dimpled the vertical stabilizer.
Details
     

 07-05-2002
1.00
Starting vertical stabilizer.
Details

 07-02-2002
3.00
Finished the horizontal stabilizer.
Details
       

 07-01-2002
3.00
Rivet the periphery of stabilizer using hand squee
Details

 06-30-2002
4.00
More riveting on the stabilizer
Details
       

 06-29-2002
5.00
Started riveting the horizontal stabilizer.
Details
       

 06-29-2002
0.00
Riveting horizontal stabilizer cont'd.
Details
       

 06-21-2002
2.00
Riveted front spar to HS-710 and HS-714
Details
       

 06-20-2002
3.00
Riveting the rear spar of the horizontal stab.
Details
       

 06-19-2002
1.00
More priming of the stabilizer
Details

 06-17-2002
4.00
Priming the stabilizer
Details
       

 06-15-2002
4.00
Stabilizer work
Details
     

 06-08-2002
4.00
Drilling right side of horizontal stabilizer
Details
       

 06-08-2002
4.00
Deburr and dimple stabilizer
Details
       

 06-02-2002
7.00
Drilled left stabilizer skeletal structure.
Details
       

 05-29-2002
1.50
Left Horizontal stab skeleton.
Details
       

 05-25-2002
3.00
HS-404, 405,and HS-710 drilling.
Details

 05-23-2002
2.50
Front spar of horizontal stabilizer
Details
       

 05-22-2002
2.00
Front spar of horizontal stabilizer
Details
       

 05-20-2002
1.50
Drilling the rear spar
Details
       

 05-19-2002
1.50
Drilling rear spar of horizontal stabilizer.
Details
       

 05-03-2002
0.00
Tail kit arrives
Details
       

 04-27-2002
0.00
Sent check for tail kit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.