Powered By Kitlog Pro v2.0
JOHN's Web Site
RV-7A
Avionics/Instruments
Work Logs Found:
20
Category Work Time:
53 Hours
Date
Hours
Work Log Summary
Details
06-23-2014
0.50
Throttle, Mixture, and Prop Decals
Details
05-30-2014
1.25
Labeling
Details
05-15-2014
0.00
Altimeter, static system, and transponder check.
Details
11-13-2013
0.25
Installed brass screws for remote ELT control.
Details
10-09-2013
1.00
Flap switch and labels
Details
05-30-2013
1.00
Drilled adjustment holes for the compass
Details
05-16-2013
2.50
New Dimmer
Details
04-16-2013
1.50
Transponder Antenna installation
Details
04-16-2013
0.25
Cabin heat and Carb heat decal installings
Details
01-31-2011
1.50
Connecting the pitot tubing to the airspeed.
Details
08-19-2008
2.50
Install Digital Clock/Timer/G-meter
Details
06-30-2007
4.25
Trouble shoot Garmin radio.
Details
06-23-2007
7.50
Reinstalled panel
Details
06-02-2007
3.25
Rewired back of panel
Details
05-28-2007
2.25
Parking brake and switches.
Details
08-04-2006
5.50
Fabricating new panel.
Details
08-03-2006
11.00
New panel work.
Details
02-22-2006
1.25
Altitude Encoder
Details
03-01-2005
1.50
Turn coordinator
Details
01-01-2005
4.00
Installed instruments and continued wiring.
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
711
1919
Avionics/Instruments
20
53
Battery Box
5
13
Brakes
21
39
Cabin Frame(Rollbar)
13
34
Canopy
70
212
Control Systems
2
2
Cowling
27
86
Electric Aileron Tri
2
8
Electric Elevator Tr
2
7
Electric Flap motor
6
20
Electrical
68
200
Empennage
100
310
Engine
62
180
Fiberglass work
15
39
Firewall
12
26
Fuel and Vent Lines
10
15
Fuel Tanks
5
8
Fuselage
106
280
Interior
1
3
Kit arrives
2
Landing gear
16
40
Landing Lights
6
19
Map Box
4
16
Miscellaneous
16
28
Moving plane to hang
3
Painting
18
63
Pictures of Myself
18
Prop
11
31
Service Bulletins
5
13
Shop Supplies
1
Tools
4
4
Weight and Balance
3
4
Wings
47
135
Wingtips
10
31
Copyright © 2001-2024 Matronics. All Rights Reserved.