KitLog pro

Powered By Kitlog Pro v2.0

PAUL'S WEB SITE
Work Logs Found: 156
Category Work Time: 396 Hours
 Date
Hours
Work Log Summary

Details

 04-03-2020
3.00
Reinstall aileron pivot and adjust ailerons. Taxi

 08-07-2019
1.50
Prepare Jury struts

 07-24-2019
2.00
Adjust strut lengths. Prime wing and tail struts

 07-21-2019
3.00
Hanger - Reinstall wings

 04-08-2019
1.50
Cut out wing gap seals to fit around cabin. Build

 04-04-2019
1.50
Build wing gap seals

 03-28-2019
0.50
Finish painting aileron pivots

 03-27-2019
1.00
Wire wing end plate. Clean up anf paint aileron pi

 03-21-2019
1.00
Touch up paint. Wire nav. light

 03-20-2019
1.00
Mask and painr red stripe. unmask

 03-19-2019
1.50
Mask and paint blue

 03-18-2019
1.00
Paint grey on lower side

 03-17-2019
1.00
Paint red strip on upper surface

 03-14-2019
1.00
Spray final coat of blue on top side of wing

 03-12-2019
1.50
Mask top side. 1st blue coat

 03-11-2019
0.50
Fit aileron

 03-10-2019
1.00
Spray grey on top side

 03-09-2019
0.50
1st grey coat on top side

 03-08-2019
1.00
Final primer coat

 03-07-2019
0.50
Spray primer on top side

 03-06-2019
1.00
2nd primer coat on top side of wing

 03-03-2019
1.00
Prepare and brush primer coat on wing top surface

 03-01-2019
15.00
1st color coat on underside of wing

 02-28-2019
0.50
Last primer coat on underside

 02-27-2019
1.00
Spray 2nd and 3rd cross coats

 02-26-2019
0.50
Spray 1st cross coat on underside of wing

 02-25-2019
1.00
Prime underside of wing

 02-24-2019
4.00
Complete all taping. Shrink and tape aileron. Prep

 02-21-2019
2.00
Complete rib stitching. Tape lower surfaces
     

 02-20-2019
1.50
Rin stitch lower surface

 02-19-2019
1.50
Prepare lower surface for rib stitching. Begin cov

 02-18-2019
4.00
Rib stitch upper surface. Install empennage struts

 02-07-2019
0.50
Complete top surface gluing. Prepare aileron

 02-06-2019
1.50
Attach fabric to upper wing surface

 02-05-2019
1.00
Complete shrink on lower wing surface. Prepare top
       

 01-17-2019
0.50
Complete attaching lower surface wing fabric

 01-16-2019
1.50
Attach lower surface wing fabric

 01-15-2019
1.50
Prepare wing for covering. Anto chafe tape

 01-14-2019
1.50
Prepare wing for covering

 01-09-2019
1.50
Wing wiring. Prep for covering
       

 01-08-2019
1.50
Mount OAT probe. Cover Right wing end surfaces

 12-17-2018
1.00
Mount aileron

 12-16-2018
0.50
Paint aileron

 12-13-2018
0.50
Paint aileron

 12-11-2018
1.00
Work on mounting wing end plate.Paint aileron

 12-10-2018
1.00
Clean up wing end plates. First color coat on aile

 12-09-2018
1.00
Paint touch up

 12-08-2018
0.50
Route wing endplate

 12-05-2018
0.50
Work on Aileron. Cut out inspection holes

 12-04-2018
0.50
Touch up blue on under side

 12-03-2018
1.50
Touch up grey on underside. Prep end plate

 12-02-2018
1.00
Apply red stripe to top side
       

 11-29-2018
0.50
Touch up blue on top side

 11-28-2018
1.50
Paint blue on top side

 11-26-2018
1.00
Prepare wing end plate template

 11-25-2018
2.00
Paint grey and blue on under side

 11-24-2018
1.50
Paint grey on top side

 11-23-2018
1.00
Prime underside

 11-20-2018
0.50
Spray final primer on top surface

 11-19-2018
1.00
Spray 3rd coat primer on top surface

 11-18-2018
2.00
Spray 1st two coats of primer

 11-15-2018
0.50
Add tape to top surface along rear spar

 11-13-2018
0.50
Sand top wing surface

 11-12-2018
0.50
2nd coat primer on top surface

 11-08-2018
2.00
Iron down tapes. 1st primer coat on topside

 11-07-2018
1.00
Install leading edge tape

 11-05-2018
1.00
2nd primer coat

 11-04-2018
3.00
Rib stitching. Taping. 1st primer coat.

 11-03-2018
3.00
Rib stitching. Taping

 11-01-2018
1.50
Continue rib stitching. Prepare tapes to cover rib

 10-31-2018
1.50
Rib stitching. Shrink fabric on aileron

 10-30-2018
2.00
Rib stitching
     

 10-29-2018
1.50
Rib stitching. Continue covering aileron

 10-28-2018
2.50
Rib stitching. Begin covering aileron

 10-21-2018
2.50
Shrink to skin
     

 10-18-2018
1.50
Install fabric on top wing surface
       

 10-17-2018
1.50
Continue to prep top side of wing

 10-16-2018
1.50
Prep top side of wing for fabric

 10-15-2018
1.50
Shrink fabric on bottob of left wing

 10-14-2018
3.00
Cover bottom of left wing

 10-11-2018
1.00
Cover end ribs
     

 10-10-2018
1.00
Clean up wing. Prepare for covering.

 10-02-2018
1.00
Begin wiring and plumbing left wing

 10-01-2018
1.50
Clean up wing. Paint misc. parts. Repaint rudder b

 09-23-2017
6.00
Mount wings
Details

 05-25-2017
3.00
Mockup right wing. Build strut fittings. Measure f
       

 06-18-2016
0.25
Put wings in storage and prepare bench for fuselag

 06-14-2016
1.00
Varnish right wing

 06-13-2016
1.00
Varnish Right wing

 06-12-2016
1.00
Varnish Right Wing

 06-11-2016
1.00
Varnish right wing

 06-10-2016
1.00
Varnish right wing

 06-05-2016
1.00
Varnish left wing

 06-04-2016
1.00
Varnish left wing

 06-03-2016
1.00
Varnish left wing

 06-02-2016
1.00
Varnish left wing

 06-01-2016
1.00
Varnish left wing

 05-26-2016
14.50
Work on left wing

 04-12-2016
4.00
Work on left wing aileron

 03-31-2016
2.00
Generally cleaned up and sanded the left wing

 03-25-2016
2.50
Filling the rear of the aileron pocket with flox.
Details
       

 03-24-2016
1.00
Strengthened aileron with flox
Details
     

 03-24-2016
1.50
Building the aileron pocket (left wing)
Details

 03-23-2016
3.00
Building the aileron pocket (left wing)
Details
       

 03-16-2016
1.00
Installing the aileron leading edge ply (left wing

 03-15-2016
1.50
Preparing the aileronleading edge ply (left wing)

 03-14-2016
2.50
Installing Aileron leading edge ribs left wing)
Details
       

 03-13-2016
1.00
Cutting loose the left wing Aileron
Details
       

 03-12-2016
2.00
Installing Aileron bracing (left wing)
Details
       

 03-11-2016
2.00
Aileron spar (left wing)
Details
       

 03-10-2016
2.00
Aileron Hinge block (left wing)
Details
     

 03-08-2016
1.50
Working on Aileron (left wing)
Details
       

 03-07-2016
1.50
Working on Aileron (left wing)
Details
     

 03-06-2016
1.50
Working on Right wing aileron
Details
     

 02-28-2016
24.00
Detail all stuff done to complete 2nd wing

 01-27-2016
3.50
Installing leading edge ply (left)
Details
       

 11-25-2015
8.00
Complete all bracing and reinforcing of the wing (

 11-17-2015
3.50
Installing leading edge ply
Details
       

 11-05-2015
1.50
Preparing leading edge ply
       

 10-25-2015
6.00
Wing to fuselage and spar fittings (right wing)
Details
       

 10-22-2015
1.50
Prepare leading edge D section
Details
       

 10-07-2015
4.00
Installing the Wing leading edge ribs
Details
       

 09-05-2015
6.00
Build the wing leading edge ribs
Details
       

 08-30-2015
0.00
Wing out of storage and back on the bench
Details
       

 08-30-2015
4.00
Complete the wing to fuselage and wing to spar fit

 08-29-2015
4.00
Built the metal wing fittings
Details
     

 03-01-2015
24.00
Complete the left wing to the same state as the ri

 12-22-2014
9.00
Complete assembly of right wing
Details

 12-14-2014
2.00
Rough cut leading edge ribs

 12-04-2014
1.50
Complete strut and diagonal bracing, complete trai

 12-03-2014
1.50
Complete strut and diagonal bracing, attach traili

 12-02-2014
2.00
Glue in compression struts and diagonals, prepare

 11-26-2014
2.00
Prepare compression and diagonals.
Details

 11-24-2014
2.00
Glue in rear spar, add 1/8 pl;y spacer for fitting

 11-24-2014
5.00
Atach all ribs, continue work on metal fittings

 11-23-2014
6.00
Prepare right wing spars
Details

 11-22-2014
2.00
Complete Strut and diagonal bracing, add gussets t

 11-21-2014
1.50
Continue Strut and Diagonal bracing, attach traili

 11-20-2014
6.00
Rough cut the wing to fuselage and wing to strut f

 11-19-2014
1.50
Glue in compression struts and diagonals, prepare

 11-18-2014
1.50
Glue in compression struts and diagonals (left win

 11-17-2014
1.50
Glue in compression struts (left wing)

 11-08-2014
2.00
Wing mockup with spars and ribs (left wing)
     

 11-08-2014
3.50
Spars drilled for steel fittings
Details

 10-27-2014
25.00
Spars finished
Details
       

 09-17-2014
7.00
Spars continued
Details
     

 09-03-2014
2.00
1st Spar initial layout
     

 09-02-2014
1.00
Ribs are completed
Details
       

 08-06-2014
5.57
19 ribs so far
Details

 07-22-2014
5.06
The Pile of Ribs grows
Details
     

 07-10-2014
5.06
6 Ribs built so far

 06-24-2014
6.50
Finally completed making all the rib gussets

 06-15-2014
2.00
Making rib gussets

 06-14-2014
4.00
Cut all remaining wing rib capstrips
Details

 06-01-2014
1.50
First Rib Layout
Details
     

 05-17-2014
0.50
Building Rib Jig
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.