Powered By Kitlog Pro v2.0
PAUL'S WEB SITE
Cabin Eagle
Miscellaneous
Work Logs Found:
73
Category Work Time:
93 Hours
Date
Hours
Work Log Summary
Details
04-05-2020
2.00
Misc. Taxi test raised tailwheel. riding brakes:(
03-29-2020
2.00
Misc. Taxi test
03-25-2020
1.25
Bleed brakes. Misc
03-14-2020
1.00
Misc
01-01-2020
2.50
Taxi test. Check mags, probem with one. Broke Rudd
12-13-2019
3.00
Taxi tests
12-08-2019
2.00
Install Data plate. General assembly
12-04-2019
1.50
Mount camera. Taxi tests
11-25-2019
0.00
Taxied.
11-07-2019
1.00
Prepare parts
11-04-2019
1.00
Prepare parts
10-27-2019
2.00
Hanger - test seats. Misc
10-24-2019
0.50
Work on seat adjusters
10-23-2019
2.50
Hanger - Work on seats. Misc
10-21-2019
1.00
Build seat adjusters
10-20-2019
4.00
Hanger - Fix fuel leak, start engine, taxi, wash a
10-13-2019
1.00
Prep parts
10-09-2019
0.50
Prep parts
10-07-2019
0.50
Prep parts
10-02-2019
1.00
Prep parts - Make rudder to tail wheel bracket
09-30-2019
1.00
Prep parts
09-24-2019
0.50
Prepare new elevator pivot
09-16-2019
1.50
Hanger - Remove carbs. General assembly
09-14-2019
1.50
Hanger - First engine start
09-12-2019
0.50
Prep parts
09-10-2019
0.50
Prep parts
09-04-2019
0.50
Prep parts
09-02-2019
1.00
Prep parts
08-28-2019
1.00
Prep parts for installation. Finish painting wing
08-26-2019
2.00
Prep parts for installation. Build new elevator fr
08-14-2019
1.50
Paint Jury struts. Buils aileron push rods. Prime
08-13-2019
1.50
Work on aileron pivot mounts. Paint Jury strust. G
08-04-2019
2.00
General prep
07-31-2019
0.50
Misc. Prep parts
07-25-2019
2.50
Hanger - Mount engine. Misc
07-23-2019
2.00
Hanger - Wiring and misc.
07-22-2019
2.00
Misc.
07-12-2019
0.00
Move fuselage to hanger
06-20-2019
1.00
Misc
06-07-2019
2.00
Misc.
06-03-2019
0.50
General tidy up.
06-01-2019
2.00
General tidy up
05-01-2019
1.00
Dismantle cabin area for work on engine mount. Pos
04-30-2019
0.00
Bring fuselage back from hanger
04-29-2019
0.00
Tidy up workshop for fuselage. Assemble engine hoi
04-28-2019
5.00
Hanger - Dismantle plane for move to hiuse. Work o
04-21-2019
5.00
Hanger - Move plane to level surface. Measure all
04-16-2019
2.00
Hanger - Fit prop. Fit gap seals. Fit tail feather
03-24-2019
0.00
Move Wing to hanger
01-13-2019
2.00
Misc.
12-18-2018
0.00
Move left wing to hanger
09-12-2018
1.00
Misc
08-26-2018
1.00
Misc.
05-16-2018
1.00
Misc
05-06-2018
1.00
Misc
05-03-2018
1.00
Misc
04-29-2018
2.00
Misc
04-05-2018
1.00
Stuff
03-20-2018
0.00
Build tail stand
12-03-2017
2.00
Prime aluminium pieces
12-02-2017
0.00
Move fuselage to harrell field
11-14-2017
0.00
Rent hanger at Harrell field
11-01-2017
1.00
Alumiprep and Alodine aluminium parts
10-31-2017
1.00
Prepare aluminium parts
10-30-2017
1.00
Prepare aluminium parts
09-13-2017
1.00
Work on Aluminium covering dash
06-14-2017
1.00
Misc
05-14-2017
2.00
Final paint (red) for control rods and Landing gea
05-07-2017
3.00
Prepare and Prime Control rods and Langing gear
04-12-2017
0.00
Work on engine test stand
04-06-2017
0.00
Pick up Engine
Details
08-22-2015
0.00
Re setup in new location
Details
05-01-2014
0.25
Purchased plans
Details
SITE NAVIGATION
Contact Builder
Cabin Eagle Home
Category
# Logs
# Hours
All
717
1313
Avionics
18
34
Empennage
63
98
Engine
21
44
Fuel System
16
22
Fuselage
289
460
General Assembly
50
132
Miscellaneous
73
93
None
11
Prop
1
2
Tools
3
10
Wings
156
396
Wings
16
22
Copyright © 2001-2024 Matronics. All Rights Reserved.