KitLog pro

Powered By Kitlog Pro v2.0

Michael's Cozy Web Site
Work Logs Found: 23
Category Work Time: 206 Hours
 Date
Hours
Work Log Summary

Details

 07-29-2020
2.00
Installing the Rudder Pedals
Details

 05-15-2020
4.00
Installing the Electric Nose Gear System
Details

 04-24-2020
4.00
Installing the Electric Nose Gear System
Details

 04-21-2020
2.00
Installing the Electric Nose Gear System
Details

 04-17-2020
3.00
Installing the Electric Nose Gear System
Details
     

 09-27-2019
3.00
Installing the Rudder Pedals
Details

 09-21-2019
2.00
Piping the Pitot and Static System
Details

 07-29-2016
3.00
Install Nose bumper
Details

 06-29-2009
27.00
Nose Door
Details

 06-13-2009
14.00
Closing the Top and Carving & Glassing the Outside
Details

 05-30-2009
8.00
Installing the Master Brake Cylinders
Details
     

 05-29-2009
2.00
Installing the Master Brake Cylinders
Details

 12-01-2008
5.00
Piping the Pitot & Static System
Details
     

 09-13-2008
3.00
Installing the Master Brake
Details

 08-25-2008
2.00
Installing the Master Brake Cylinders
Details

 08-22-2008
14.50
Completion of the NoseGear
Details

 07-31-2008
31.00
Installing the Rudder Pedals
Details
     

 07-24-2008
24.00
Nose Floor and Sides
Details
     

 07-18-2008
9.50
Installation of the Box Assembly on the Fuselage
Details
     

 07-12-2008
8.50
Fabrication of NG-30
Details

 04-05-2008
7.50
Installing the Nose Lift Assembly
Details
       

 03-29-2008
5.50
Reinforcing the Glass Strut
Details

 08-20-2007
22.00
Fabrication of NG-30s
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.