Powered By Kitlog Pro v2.0
Michael's Cozy Web Site
Mk IV
Ch 05 FS Sides
Work Logs Found:
6
Category Work Time:
75 Hours
Date
Hours
Work Log Summary
Details
01-13-2006
13.00
Completion of the Fuselage Sides
Details
01-06-2006
11.00
Installation of Lower Triangular Longeron
Details
12-30-2005
16.00
Inside Layup and Installing the Upper Longeron
Details
12-29-2005
4.00
Contouring the Inside
Details
12-19-2005
22.75
Building the Forms for the FS sides and Preparing
Details
12-02-2005
8.00
Cutting the Jigs and Laminating the Top Longerons
Details
SITE NAVIGATION
Contact Builder
Mk IV Home
Category
# Logs
# Hours
All
671
3555
Ch 04 Bulkheads
5
97
Ch 05 FS Sides
6
75
Ch 06 FS Exterior
9
137
Ch 07 FS Assembly
6
70
Ch 08 Seat & Belts
6
28
Ch 09 LG & Brakes
17
212
Ch 10 Canard Wing
6
94
Ch 11 Elevators
7
62
Ch 12 Canard Install
3
22
Ch 13 Nose
23
206
Ch 14 Main Spar
10
152
Ch 15 FW Assembly
8
45
Ch 16 Control Systm
12
66
Ch 17 Center Console
8
28
Ch 18 Canopy
123
450
Ch 19 Wings & Ailern
122
416
Ch 20 Rudrs & Winglt
63
176
Ch 21 Strakes &Tanks
78
364
Ch 22 Electrical
12
115
CH 23 Engine Install
40
203
Ch 24 Cvrs & Fairing
50
148
Ch 25 Finishing
52
296
Miscellaneous
3
84
Modifications
1
6
Repairs
1
3
Copyright © 2001-2024 Matronics. All Rights Reserved.