Powered By Kitlog Pro v2.0
Bird
RV8
Empennage
Work Logs Found:
63
Category Work Time:
244 Hours
Date
Hours
Work Log Summary
Details
07-21-2013
4.00
tailwheel fairing and pax fit.
Details
07-20-2013
6.00
emp. fairing
Details
07-18-2013
2.00
aft emp. fairing
Details
07-13-2013
4.00
emennage final assembly
Details
07-10-2013
4.00
empennage assembly
Details
07-07-2013
2.00
enmennage fairings
Details
07-06-2013
2.00
empennage fairings
Details
06-15-2013
4.00
empennage removal
Details
06-11-2013
2.00
empennage fairing
Details
06-08-2013
2.00
emenaage fairing
Details
06-05-2013
2.00
aft emennage fairing
Details
11-10-2012
8.00
horzontal stab
Details
11-09-2012
4.00
rudder
Details
11-08-2012
4.00
vertical stab
Details
11-03-2012
8.00
rudder painting
Details
11-01-2012
2.00
rudder
Details
01-31-2012
2.00
rudder
Details
01-07-2012
4.00
empennage fitting
Details
01-05-2012
2.00
Rudder
Details
01-03-2012
2.00
empennage tips
Details
01-02-2012
8.00
Empannage rigging
Details
12-31-2011
6.00
Elevators
Details
12-24-2011
6.00
Drilling horizontal stab, vertical stab
Details
12-21-2011
2.00
empennage fitting
Details
10-23-2010
9.00
painting
Details
09-17-2010
4.00
painting
Details
09-04-2010
5.00
painting
Details
08-13-2010
10.00
priming
Details
08-07-2010
2.50
trim wiring
Details
08-01-2010
3.00
rudder light and tips
Details
07-25-2010
3.00
horiz. stab tips
Details
07-24-2010
3.00
fiberglass stabilizer tips
Details
07-23-2010
4.50
fit elevator to horizontal stabilizer
Details
07-22-2010
2.50
installed trim tab to elevator
Details
07-21-2010
2.00
elevator trim tab
Details
07-20-2010
3.00
elevator trim tab
Details
07-19-2010
4.50
L/H front skin shaping
Details
07-18-2010
4.00
L/H elevator riveting and trim
Details
07-17-2010
4.50
R/H elevator riveting
Details
07-16-2010
3.50
elevator dimpling and hinges
Details
07-15-2010
4.00
back riveting stiffeners
Details
07-14-2010
4.00
elevator priming
Details
07-13-2010
3.00
elevator stiffeners
Details
07-12-2010
4.00
leading edge of rudder
Details
07-11-2010
4.00
riveting rudder
Details
07-10-2010
3.50
rudder spar/ribs
Details
07-09-2010
4.00
rudder skins
Details
07-08-2010
4.00
finished vertical stab.
Details
07-06-2010
3.00
vertical stab skins and spar
Details
07-04-2010
8.00
priming
Details
07-03-2010
4.00
conversion
Details
07-02-2010
4.00
cleaning
Details
07-01-2010
4.00
vertical stab
Details
06-27-2010
4.00
vertical stab
Details
06-26-2010
2.50
L/H, R/H skin spar assembly
Details
06-25-2010
3.00
emp. front spar, skin
Details
06-24-2010
3.00
emp. rear spar
Details
06-23-2010
2.00
LH stab
Details
06-22-2010
2.00
priming
Details
06-21-2010
2.50
stab skins and ribs rh
Details
06-20-2010
3.00
horiz. stab spars ribs and skins
Details
06-19-2010
4.00
front and rear horizontal stabilizer spars
Details
06-18-2010
4.00
recieved empennage
Details
SITE NAVIGATION
Contact Builder
RV8 Home
Category
# Logs
# Hours
All
516
1739
Avionics/electrical
37
105
Empennage
63
244
Fuel tanks
19
80
Fuselage
225
643
Miscellaneous
12
27
Paint
59
224
Tools
1
2
Wings
100
414
Copyright © 2001-2024 Matronics. All Rights Reserved.