Powered By Kitlog Pro v2.0
Jeremy Balentines RV-8
RV-8
Wings
Work Logs Found:
62
Category Work Time:
356 Hours
Date
Hours
Work Log Summary
Details
11-19-2014
6.00
Aileron hinges / Flap and Aileron Gap Fairings
Details
11-14-2014
5.00
New wing stands
Details
11-13-2014
7.00
Flap work / Left top wing skin riveting
Details
11-12-2014
6.00
Right main wing skins / Flap Work
Details
11-11-2014
9.00
Drilling out the flaps and hinge/Riveting top main
Details
11-09-2014
3.00
Scarf joint on the top wing skins
Details
11-08-2014
1.00
Leak test of the right tank
Details
11-02-2014
6.00
Sealing the rear baffle of the right tank
Details
11-01-2014
1.00
Leak test of the Left tank
Details
10-27-2014
6.00
Sealing the rear baffle of the left tank
Details
10-22-2014
7.00
Right leading edge assembly riveted to main spar
Details
10-20-2014
7.00
Left leading edge assembly riveted to main spar
Details
10-18-2014
6.00
Right leading edge riveting
Details
10-16-2014
6.00
Left leading edge riveting
Details
10-15-2014
8.00
Leading edge assemblies
Details
10-07-2014
6.00
Wing splice plate prep
Details
10-05-2014
6.00
Right wing skeleton dimpling
Details
10-04-2014
6.00
Left wing skeleton dimpling
Details
10-02-2014
5.00
Right top main skin prep
Details
10-01-2014
5.00
Left top main skin prep
Details
09-20-2014
7.00
Sealing the right tank part 5
Details
09-16-2014
4.00
Right tank vent line
Details
09-13-2014
4.00
Sealing the right tank part 4
Details
09-12-2014
8.00
Sealing the right tank part 3
Details
09-10-2014
6.00
Sealing the right tank part 2
Details
09-09-2014
6.00
Sealing the right tank part 1
Details
09-04-2014
7.00
Sealing the left tank part 5
Details
08-31-2014
4.00
Left Tank vent line
Details
08-30-2014
4.00
Sealing the left tank part 4
Details
08-28-2014
8.00
Sealing the left tank part 3
Details
08-27-2014
6.00
Sealing the left tank part 2
Details
08-26-2014
6.00
Sealing the left tank part 1
Details
08-22-2014
5.00
Dimpling the tank skins
Details
08-19-2014
8.00
Stiffener rings and anti hangup guides
Details
08-18-2014
4.00
Access holes on the inboard tank ribs
Details
08-17-2014
5.00
Capacitive Fuel Sending units
Details
08-15-2014
6.00
Fabricating all the parts in the inboard fuel bay
Details
08-13-2014
7.00
Fabricating all the parts in the inboard fuel bay
Details
08-10-2014
8.00
Countersinking the skin/rear tank baffle
Details
08-09-2014
6.00
Z Bracket platenuts
Details
08-03-2014
9.00
Repeating everything for the right tank
Details
08-02-2014
6.00
Drilling the rear baffle and wing tank
Details
08-01-2014
8.00
Fitting the Left wing tank
Details
07-30-2014
5.00
Preparing the fuel tank Z-Brackets part 2
Details
07-23-2014
3.00
Preparing the fuel tank Z-brackets
Details
07-22-2014
4.00
W-423 Joint plate
Details
07-21-2014
5.00
Leading Edges
Details
07-20-2014
7.00
Wing doublers and match drilling the main wing ski
Details
07-19-2014
8.00
Wing doublers and match drilling the main wing ski
Details
07-18-2014
3.00
Finishing up riveting the main wing ribs to the re
Details
07-09-2014
1.50
Riveting the main wing ribs to the rear spar
Details
07-08-2014
4.00
Riveting the main wing ribs to the front spar
Details
06-29-2014
7.00
Main rib/spar assembly
Details
06-11-2014
6.00
Preparing the wing ribs for lighting, etc
Details
06-09-2014
12.00
Preparing the Main wing ribs
Details
06-08-2014
2.00
Rear spar assembly
Details
06-07-2014
8.00
Rear spar assembly
Details
06-05-2014
7.00
Wing tie down assemblies
Details
06-04-2014
2.00
Wing Tie down Spacers/ W726
Details
06-03-2014
4.00
Riveting nutplates onto the forward spar
Details
06-02-2014
4.00
Priming and riveting forward wing spar nutplates
Details
06-01-2014
9.00
Tank plate nuts/Access plate plate nuts/ Center se
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
90
514
Empennage
28
158
Wings
62
356
Copyright © 2001-2024 Matronics. All Rights Reserved.